Myint Aung
- License
- M36473
- Mechanical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up M36473 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Wright Engineers
- On San Francisco permits
- Jun 2016 to Aug 2016
2 permits since 2000 (engineer on 2 permits): 1 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Pacific General Construction (2)
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 23, 2016 | Never finaled issued Sep 2016, no final | 1 Market St | Pacific General Construction | fire damper on new exhaust duct crossing the demising wall has been deleted. the demising wall is non- fire rated and is not a smoke barrier forming the smoke containment envelope. revision to app#201606210513. n/a for maher.Details
fire damper on new exhaust duct crossing the demising wall has been deleted. the demising wall is non- fire rated and is not a smoke barrier forming the smoke containment envelope. revision to app#201606210513. n/a for maher. | |
| Jun 15, 2016 | Completed final sign-off Oct 2016 | 1 Market St | Pacific General Construction | revision to app#201508144307, 201603152082, & 201604296163 at ground floor for relocation of water heater. n/a for maherDetails
revision to app#201508144307, 201603152082, & 201604296163 at ground floor for relocation of water heater. n/a for maher |