Monte Alan Burtz
- Listed as
- contractor, designer
- Firm
- Elemental Builders Incorporated
- Based in
- El Dorado Hills
- On San Francisco permits
- Jun 2025 to Sep 2026
13 permits since 2000 (contractor on 13 permits, designer on 1 permit): 5 completed, 8 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Architects
- Martin C Kellogg (2), Daniel Paris
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 9
- Commercial 1
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 1, 2026 | In progress issued Sep 2026 | 2150 Fell St | Elemental Builders Incorporated | unit 301: on the 4th floor, including relocate kitchen, new bedroom, in kind bahtroom renovation, new laundry, no structural, no exterior work and no change to areas or egress.Details
unit 301: on the 4th floor, including relocate kitchen, new bedroom, in kind bahtroom renovation, new laundry, no structural, no exterior work and no change to areas or egress. | $40,000 |
| Aug 31, 2026 | In progress issued Aug 2026 | 701 Fell St | Elemental Builders Incorporated | interior unit renovation like for like new cabinets, drywell, add dishwasher/laundry. rewire add new subpanel in common area accessible. new plumbing fixtures, appliancesDetails
interior unit renovation like for like new cabinets, drywell, add dishwasher/laundry. rewire add new subpanel in common area accessible. new plumbing fixtures, appliances | $40,000 |
| Aug 31, 2026 | In progress issued Aug 2026 | 930 Post St | Elemental Builders Incorporated | unit 14 -renovate interior unit like for like cabinets, flooring, countertops, interior finishes. add washer dryer all in one.Details
unit 14 -renovate interior unit like for like cabinets, flooring, countertops, interior finishes. add washer dryer all in one. | $40,000 |
| Aug 28, 2026 | In progress issued Aug 2026 | 55 Genoa Pl | Elemental Builders Incorporated | private parking area: remove concrete where it failed, allowing water to pass to basement. waterproof deck and pour back concrete. 15x15 area (225 sf). topping slab only.Details
private parking area: remove concrete where it failed, allowing water to pass to basement. waterproof deck and pour back concrete. 15x15 area (225 sf). topping slab only. | $8,000 |
| Aug 26, 2026 | In progress issued Aug 2026 | 676 Greenwich St | Elemental Builders Incorporated | revision to bpa# 202604229892, add partition wall at (2) door way, remove (2) doorsDetails
revision to bpa# 202604229892, add partition wall at (2) door way, remove (2) doors | $1,200 |
| Aug 17, 2026 | In progress issued Aug 2026 | 350 Judah St | Elemental Builders Incorporated | commerical restaurant area: remove tile concrete and soil, to repair plumbing drain, back fill moisture barrier, rebar and pour concrete upon pipe fix. a seperate plumbing permit will be pulled for plumbing work. no electrical to be completed. all work is interior.Details
commerical restaurant area: remove tile concrete and soil, to repair plumbing drain, back fill moisture barrier, rebar and pour concrete upon pipe fix. a seperate plumbing permit will be pulled for plumbing work. no electrical to be completed. all work is interior. | $6,000 |
| Aug 3, 2026 | In progress issued Sep 2026 | 1106 Bush St | Elemental Builders Incorporated | $6,000 | |
| Jun 11, 2026 | Completed final sign-off Aug 2026 | 759 06th Av | Elemental Builders Incorporated | to comply with nov# 202650804 items 2 and 5: stucco replacement at the front of building and staircase repair (less than 50% repair) at the rear.Details
to comply with nov# 202650804 items 2 and 5: stucco replacement at the front of building and staircase repair (less than 50% repair) at the rear. | $10,000 |
| Apr 22, 2026 | In progress issued Apr 2026 | 676 Greenwich St | Elemental Builders Incorporated | interior renovation, new flooring, cabinets, plumbing trim, electrical trim, paint and flooring, renovation to be like for like in same location, new electrical sub panel to be installed.Details
interior renovation, new flooring, cabinets, plumbing trim, electrical trim, paint and flooring, renovation to be like for like in same location, new electrical sub panel to be installed. | $50,000 |
| Oct 20, 2025 | Completed final sign-off Jun 2026 | 621 03rd Av | Elemental Builders Incorporated | construction addendum (revision) to permit 202509094908. add skylight in bathroom and open wall between kitchen and dining room.Details
construction addendum (revision) to permit 202509094908. add skylight in bathroom and open wall between kitchen and dining room. | $10,000 |
| Sep 9, 2025 | Completed final sign-off Jun 2026 | 621 03rd Av | Elemental Builders Incorporated | renovate kitchen and bathrooms. no change to exterior.Details
renovate kitchen and bathrooms. no change to exterior. | $30,000 |
| Aug 25, 2025 | Completed final sign-off Oct 2025 | 2390 Francisco St | Elemental Builders Incorporated | kitchen remodel in kind. approx. 90 sq ft.remove and install new cabinets & flooring. remove drywall for electrical and reinstall.Details
kitchen remodel in kind. approx. 90 sq ft.remove and install new cabinets & flooring. remove drywall for electrical and reinstall. | $35,000 |
| Jun 3, 2025 | Completed final sign-off Sep 2025 | 1555 Chestnut St | Elemental Builders Incorporated | unit #31: remove and replace (1) kitchen cabinetry, (1) bathroom appliances bath valve vanity paint. move electrical sub panel out of closet to common area wall update finishes switch plug lighting.Details
unit #31: remove and replace (1) kitchen cabinetry, (1) bathroom appliances bath valve vanity paint. move electrical sub panel out of closet to common area wall update finishes switch plug lighting. | $30,000 |