Michael Thomas
- License
- C5924
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C5924 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- Mbh Arhcitects Inc.
- Based in
- Alameda
- On San Francisco permits
- Mar 2013 to Dec 2018
6 permits since 2000 (architect on 5 permits, engineer on 1 permit): 2 completed, 2 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Bogart Construction Inc ., Hathaway Dinwiddie Co.
- Architects
- Warner Schmak
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 3
- Commercial 3
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 20, 2018 | Never finaled filed Dec 2018, never issued | 8 22nd St | mayor's ed 17-02 housing project priority processing. consists design & construction of 7-story,1 basement, type 1a, iiia, 275 dwelling units and commercial, mixed use housing building, in conformance to the pier 70 design for development.Details
mayor's ed 17-02 housing project priority processing. consists design & construction of 7-story,1 basement, type 1a, iiia, 275 dwelling units and commercial, mixed use housing building, in conformance to the pier 70 design for development. | $67,837,000 | |
| Nov 21, 2017 | Expired or cancelled cancelled Dec 2024 | 150 Executive Park Bl | building# 1. to erect 6 stories, 1 basement, type v over iii, 54 units residential building.Details
building# 1. to erect 6 stories, 1 basement, type v over iii, 54 units residential building. | $25,000,000 | |
| Sep 5, 2017 | Expired or cancelled cancelled Aug 2024 | 150 Executive Park Bl | building# 3. to erect 6 stories, 1 basement, type i & iii, 76 units residential building.Details
building# 3. to erect 6 stories, 1 basement, type i & iii, 76 units residential building. | $25,000,000 | |
| Oct 23, 2014 | Never finaled issued Oct 2014, no final | 575 Florida St | revision to appl #2014.1015.8959 - soft demo only per ab-017 scope is to clarify wall heights.Details
revision to appl #2014.1015.8959 - soft demo only per ab-017 scope is to clarify wall heights. | ||
| Jul 7, 2014 | Completed final sign-off Oct 2014 | 39 Grant Av | Bogart Construction Inc . | retail store, work includes (n) casework, finishes, lighting, cashwrap, lighting, mechanical, floors, etc. no structural work, no exterior work, sprinklers under seperate permit.Details
retail store, work includes (n) casework, finishes, lighting, cashwrap, lighting, mechanical, floors, etc. no structural work, no exterior work, sprinklers under seperate permit. | $98,000 |
| Mar 12, 2013 | Completed final sign-off Oct 2013 | 301 Mission St | Hathaway Dinwiddie Co. | suite 132 - t.i. for a (n) bank including (n) partitions, ceilings, finishes & fixtures, (n) accessible restrooms, (n) staff room, no structural or exterior work.Details
suite 132 - t.i. for a (n) bank including (n) partitions, ceilings, finishes & fixtures, (n) accessible restrooms, (n) staff room, no structural or exterior work. | $139,000 |