Block 0313, lot 005
39 Grant Ave
- City’s use
- Commercial Retail
- Built
- 1909
- Stories
- 4
- Units
- 3
- Rooms
- 5 bathrooms
- Building
- 9,505 sq ft
- Lot
- 2,117 sq ft
- Zoning
- C3R
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 7, 2014 | Completed final sign-off Oct 2014 | 39 Grant Av | Bogart Construction Inc . | retail store, work includes (n) casework, finishes, lighting, cashwrap, lighting, mechanical, floors, etc. no structural work, no exterior work, sprinklers under seperate permit.Details
retail store, work includes (n) casework, finishes, lighting, cashwrap, lighting, mechanical, floors, etc. no structural work, no exterior work, sprinklers under seperate permit. | $98,000 |
| Feb 7, 2011 | Never finaled issued Feb 2011, no final | 41 Grant Av | add suite numbers for existing floors #200, #300, #400.Details
add suite numbers for existing floors #200, #300, #400. | ||
| Nov 17, 2010 | Never finaled issued Nov 2010, no final | 41 Grant Av | Tyco Integrated Security | install strobe light in the restroom and tie to existing circuit due to the addition of new restroom on the 3rd floor. adt security.Details
install strobe light in the restroom and tie to existing circuit due to the addition of new restroom on the 3rd floor. adt security. | $1,300 |
| Oct 22, 2010 | Completed final sign-off Nov 2010 | 41 Grant Av | Ward Alan Emery Construction Inc. | revision to 201006305630. add power door openerDetails
revision to 201006305630. add power door opener | $2,000 |
| Jun 30, 2010 | Completed final sign-off Nov 2010 | 41 Grant Av | Ward Alan Emery Construction Inc. | office ti on floor 3. new accessible restroom (barrier removal). me under separate permit. add new accesible counter and sink on floor 2.Details
office ti on floor 3. new accessible restroom (barrier removal). me under separate permit. add new accesible counter and sink on floor 2. | $30,000 |
| Feb 25, 2008 | Never finaled issued Feb 2008, no final | 39 Grant Av | street spaceDetails
street space | ||
| Dec 3, 2007 | Completed final sign-off May 2008 | 39 Grant Av | Nabi Construction & Engineering Inc | install moment frame at west wall under 2nd floor. provide (n) support under (e) beam at basement at east wall. building retrofitted under appl. # 9600337.Details
install moment frame at west wall under 2nd floor. provide (n) support under (e) beam at basement at east wall. building retrofitted under appl. # 9600337. | $120,000 |
| Jan 20, 2004 | Expired or cancelled expired Jan 2007 | 41 Grant Av | California Roof Management | reroofingDetails
reroofing | $900 |
| Jan 10, 2002 | Expired or cancelled expired Mar 2004 | 39 Grant Av | Plant Construction | to renew app#2001/30/0877 & 2000/02/22/2368 for final inspection only.Details
to renew app#2001/30/0877 & 2000/02/22/2368 for final inspection only. | |
| Jan 10, 2002 | Expired or cancelled expired Mar 2004 | 39 Grant Av | Plant Construction | to renew app#9924323,9924322,2001/03/23/5046 for final inspection only.Details
to renew app#9924323,9924322,2001/03/23/5046 for final inspection only. | |
| Dec 5, 2001 | Completed final sign-off Jan 2002 | 39 Grant Av | remove (e)store display light boxes prep & paint ewall & ceiling, etc.Details
remove (e)store display light boxes prep & paint ewall & ceiling, etc. | $15,150 | |
| Mar 23, 2001 | Expired or cancelled expired Jul 2001 | 39 Grant Av | Decker Electric Co Inc Electrical Contra | install new puill station & storage on 2nd floor, relocate 2 horn strobe devicesDetails
install new puill station & storage on 2nd floor, relocate 2 horn strobe devices | $1,400 |
| Jan 30, 2001 | Expired or cancelled expired May 2001 | 39 Grant Av | Decker Electric Co Inc Electrical Contra | install life safety devices 34d and rth floorDetails
install life safety devices 34d and rth floor | $4,000 |
| Jan 16, 2001 | Completed final sign-off Jan 2002 | 39 Grant Av | Plant Construction | renew app #9915872/9916598/9918729/9923100/9921348Details
renew app #9915872/9916598/9918729/9923100/9921348 | |
| Feb 22, 2000 | Expired or cancelled expired Jun 2000 | 39 Grant Av | revision to pa #9921348 per inspector 2 sd to be removed mot necessaryDetails
revision to pa #9921348 per inspector 2 sd to be removed mot necessary | ||
| Feb 22, 2000 | Expired or cancelled expired Nov 2001 | 39 Grant Av | Plant Construction | tenant build out, 3rd & 4th fl, minor structural-addng walls&partition-see a2Details
tenant build out, 3rd & 4th fl, minor structural-addng walls&partition-see a2 | $84,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Plant Construction (4), Decker Electric Co Inc Electrical Contra (2), Ward Alan Emery Construction Inc. (2), Bogart Construction Inc ., California Roof Management, Nabi Construction & Engineering Inc, Tyco Integrated Security
- Architects
- Harvey Hacker, Michael Thomas
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.