Michael Koontz
- License
- C78932
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C78932 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Silicon Valley
- Based in
- Campbell
- On San Francisco permits
- Sep 2025 to May 2026
3 permits since 2000 (engineer on 3 permits): 1 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- A R Construction, The G B Group Inc., Underpinning Specialist Inc.
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 3
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 1, 2026 | In progress issued Jul 2026 | 717 Castro St | A R Construction | replace existing front stairs - like for like -the existing stair will be replaced in-kind with a new wood stair. the design, material, and detailing will match the photos provided on the architectural plans.Details
replace existing front stairs - like for like -the existing stair will be replaced in-kind with a new wood stair. the design, material, and detailing will match the photos provided on the architectural plans. | $50,000 |
| Oct 23, 2025 | Completed final sign-off Jul 2026 | 1310 Scott St | Underpinning Specialist Inc. | retrofit existing foundation with underpinning pits and drilled pins. approximately 36 cubic yards of excavation (less than 50 cubic yards max).Details
retrofit existing foundation with underpinning pits and drilled pins. approximately 36 cubic yards of excavation (less than 50 cubic yards max). | $230,000 |
| Sep 10, 2025 | In progress issued Sep 2025 | 369 18th Av | The G B Group Inc. | revision to pa#2024-0404-9341 roof rafters have been removed and replaced in-kind do to: dry-rotted rafters. revision to remove from scope of work:the trench draw to be installed at lower level garage.Details
revision to pa#2024-0404-9341 roof rafters have been removed and replaced in-kind do to: dry-rotted rafters. revision to remove from scope of work:the trench draw to be installed at lower level garage. |