A R Construction
- Based in
- South San Francisco
- On San Francisco permits
- Nov 2024 to May 2026
- Last 24 months
- 2 permits filed
2 permits since 2000: 1 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 1, 2026 | In progress issued Jul 2026 | 717 Castro St | replace existing front stairs - like for like -the existing stair will be replaced in-kind with a new wood stair. the design, material, and detailing will match the photos provided on the architectural plans.Details
replace existing front stairs - like for like -the existing stair will be replaced in-kind with a new wood stair. the design, material, and detailing will match the photos provided on the architectural plans. | $50,000 |
| Nov 8, 2024 | Completed final sign-off Feb 2025 | 121 Dalewood Wy | replace all current windows with same size windows and one newly constructed window at dining room.Details
replace all current windows with same size windows and one newly constructed window at dining room. | $25,000 |