Michael Kaszpurenko
- Listed as
- architect, engineer
- Firm
- Structural Eng.Collaborative
- Based in
- San Francisco
- On San Francisco permits
- Oct 2012 to Feb 2022
21 permits since 2000 (engineer on 18 permits, architect on 3 permits): 17 completed, 3 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 24, 2022 | Completed final sign-off Sep 2023 | 74 Webster St | Steelcore Builders Inc | replace portion of existing brick foundation and adjoinin floor. voluntarily add plywood wall sheating in work area for good measure.Details
replace portion of existing brick foundation and adjoinin floor. voluntarily add plywood wall sheating in work area for good measure. | $80,000 |
| Oct 31, 2020 | Completed final sign-off Mar 2021 | 1555 Lombard St | Lyons Building & Associates Inc. | to comply with nov 202058652 - replacement of (e) deckDetails
to comply with nov 202058652 - replacement of (e) deck | $5,000 |
| Aug 10, 2020 | Completed final sign-off Jan 2021 | 200 Cashmere St | Buhler Commercial | structutral for new metal stair. ref pa #201912300899Details
structutral for new metal stair. ref pa #201912300899 | $5,000 |
| Oct 18, 2019 | Completed final sign-off Dec 2019 | 2200 Hyde St | Nabi Construction & Engineering Inc | rev to pa# 20171143881; new curb foundation additional plywoodDetails
rev to pa# 20171143881; new curb foundation additional plywood | |
| Oct 16, 2019 | Never finaled issued Nov 2019, no final | 16 Belmont Av | Fergal Poole Construction | partial replacement of retaining wallDetails
partial replacement of retaining wall | $55,000 |
| Oct 2, 2019 | Completed final sign-off Nov 2019 | 1520 Larkin St | De Brus Construction Inc | rev to pa# 201803264570; use brackets instead of original anchor bolt and holdown, replace dry rot wall, build new concrete footingDetails
rev to pa# 201803264570; use brackets instead of original anchor bolt and holdown, replace dry rot wall, build new concrete footing | |
| Sep 20, 2019 | Completed final sign-off Nov 2020 | 195 Urbano Dr | Mullan Enterprises Inc | reframe existing exterior sunroom walls (upper level). apply plywood sheathing to exteior walls and some new concrete curb to existing footings. windows and stucco work per permit 2019-0807-8180 & door pa 2019-0829-0222Details
reframe existing exterior sunroom walls (upper level). apply plywood sheathing to exteior walls and some new concrete curb to existing footings. windows and stucco work per permit 2019-0807-8180 & door pa 2019-0829-0222 | $15,000 |
| Sep 19, 2019 | Never finaled issued Oct 2019, no final | 1539 Folsom St | Andonian Construction | voluntary roof anchorage and splling column reinforcement. all interior work, no exterior work.Details
voluntary roof anchorage and splling column reinforcement. all interior work, no exterior work. | $45,000 |
| Apr 17, 2019 | Completed final sign-off Dec 2019 | 461 Noriega St | Steelcore Builders Inc | voluntary structural strengthening steel frame shearwall, foundation reinforceDetails
voluntary structural strengthening steel frame shearwall, foundation reinforce | $70,000 |
| Nov 13, 2018 | Completed final sign-off Jan 2020 | 298 Gough St | Steelcore Builders Inc | (e) restaurant - voluntary soft story wood frame seismic retrofit ab-094, barrier removal & ada compliant restroomDetails
(e) restaurant - voluntary soft story wood frame seismic retrofit ab-094, barrier removal & ada compliant restroom | $200,000 |
| May 22, 2018 | Completed final sign-off Dec 2018 | 321 Taraval St | Alpha Restoration & Wateproof | voluntary interim structural repairs to church sanctuary. add structural bracing to support south wallDetails
voluntary interim structural repairs to church sanctuary. add structural bracing to support south wall | $30,000 |
| Mar 26, 2018 | Completed final sign-off Nov 2019 | 1520 Larkin St | De Brus Construction Inc | mandatory soft story retrofit per sfebc chapter 4d, 2016 cebc app a4. to comply with nov#201714704Details
mandatory soft story retrofit per sfebc chapter 4d, 2016 cebc app a4. to comply with nov#201714704 | $72,000 |
| Nov 14, 2017 | Completed final sign-off Dec 2019 | 2200 Hyde St | Nabi Construction & Engineering Inc | soft story retrofit per sfebc chapter 4d engineering criteria.... to comply with nov 201711951Details
soft story retrofit per sfebc chapter 4d engineering criteria.... to comply with nov 201711951 | $40,000 |
| Oct 10, 2017 | Never finaled issued Nov 2017, no final | 40 Cervantes Bl | mandatory soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. maher not reqDetails
mandatory soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. maher not req | $55,000 | |
| Aug 23, 2017 | Completed final sign-off Jan 2019 | 3040 Franklin St | retrofit of bottom (basement level) floor. seismic bracing of lowest level of structural system to comply with the soft story rules building code iebc ch a4Details
retrofit of bottom (basement level) floor. seismic bracing of lowest level of structural system to comply with the soft story rules building code iebc ch a4 | $100,000 | |
| May 8, 2017 | Completed final sign-off Nov 2017 | 1335 Union St | Steelcore Builders Inc | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $168,500 |
| Sep 9, 2016 | Completed final sign-off Mar 2017 | 747 Lyon St | Steelcore Builders Inc | common area- soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4Details
common area- soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 | $118,406 |
| Oct 1, 2015 | Completed final sign-off Oct 2016 | 1710 19th Av | Andonian Construction | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. mandatory seismic retrofit, 3 moment frames, sheer walls.Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. mandatory seismic retrofit, 3 moment frames, sheer walls. | $120,000 |
| Jun 8, 2015 | Completed final sign-off Oct 2015 | 2901 Buchanan St | Trush Construction Company Inc. | revision to pa# 201407100879 dated 6/1/2015 (2) (1) (3). move moment frame on grid line "d" between 2 & 3 to line "d" between 1 & 2 on plan set.Details
revision to pa# 201407100879 dated 6/1/2015 (2) (1) (3). move moment frame on grid line "d" between 2 & 3 to line "d" between 1 & 2 on plan set. | $12,000 |
| Jul 10, 2014 | Completed final sign-off Oct 2015 | 2901 Buchanan St | soft story retrofit of lowest level; 2012 iebc appendix a-4Details
soft story retrofit of lowest level; 2012 iebc appendix a-4 | $50,000 | |
| Oct 5, 2012 | Expired or cancelled expired Jan 2020 | 195 Urbano Dr | comply with nov# 201268441-remodel kitchen/family room, take down 3 walls in kitchen & family room area. remove stucco from 2 bedrooms & replace with sheetrock. move laundry from 1/f to 2/f. reconfigure/remodel master bathroom & downstairs bathroom, replace windows with french door facing rear yardDetails
comply with nov# 201268441-remodel kitchen/family room, take down 3 walls in kitchen & family room area. remove stucco from 2 bedrooms & replace with sheetrock. move laundry from 1/f to 2/f. reconfigure/remodel master bathroom & downstairs bathroom, replace windows with french door facing rear yard | $50,000 |