P Michael Davies
- Listed as
- architect, engineer
- Firm
- H.J. Brunnier Assoc
- On San Francisco permits
- Mar 2005 to Jan 2012
5 permits since 2000 (engineer on 4 permits, architect on 1 permit): 4 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 30, 2012 | Never finaled issued Jan 2012, no final | 555 California St | Ac3 | roof level-modify turnable unit for future building maintenance unit (bmu)Details
roof level-modify turnable unit for future building maintenance unit (bmu) | $26,950 |
| Jan 11, 2012 | Completed final sign-off Sep 2012 | 1400 Geary Bl | Gonsalves & Stronck Construction Co. | level a-refer to pa# 2011-1208-0346-opening infill at room #14b, conference room.Details
level a-refer to pa# 2011-1208-0346-opening infill at room #14b, conference room. | $2,000 |
| Aug 16, 2010 | Completed final sign-off Sep 2011 | 2288 Broadway | Huntingdon Construction | revision to pa# 2008.12.18.8739. change location of shower and vanity in (e) bathroom at 1st floor of unit # 1sDetails
revision to pa# 2008.12.18.8739. change location of shower and vanity in (e) bathroom at 1st floor of unit # 1s | $2,000 |
| May 25, 2006 | Completed final sign-off Aug 2006 | 50 Forest Side Av | revision appl#200604058321 this is an amended plan due to change in construction method- shotcrete i/o poured in place. strengthen existing retaining wall by adding a n ew 8" reinforced concrete wall in front. retaining wall is at rear of lot near property line and about 30' from house.Details
revision appl#200604058321 this is an amended plan due to change in construction method- shotcrete i/o poured in place. strengthen existing retaining wall by adding a n ew 8" reinforced concrete wall in front. retaining wall is at rear of lot near property line and about 30' from house. | ||
| Mar 9, 2005 | Completed final sign-off Apr 2007 | 1400 Geary Bl | plaza redevelopment phase 3 & 4 parking area. waterproofing, re-paving & grading, new landscaping,Details
plaza redevelopment phase 3 & 4 parking area. waterproofing, re-paving & grading, new landscaping, | $2,000,000 |