Michael Comaroto
- Listed as
- engineer
- Firm
- M.A. Engineering
- Based in
- San Ramon
- On San Francisco permits
- Nov 2015 to Dec 2025
12 permits since 2000 (engineer on 12 permits): 8 completed, 2 in progress, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 3, 2025 | In progress issued Dec 2025 | 235 Coleridge St | partial replacement of existing brick foundation with new reinforced concrete footing and stem wall per engineer plans. revision to pa#2025-0918-5649Details
partial replacement of existing brick foundation with new reinforced concrete footing and stem wall per engineer plans. revision to pa#2025-0918-5649 | $48,000 | |
| Oct 7, 2024 | In progress issued Apr 2025 | 200 Joost Av | Cs Construction Co | 2/f: interior remodel, add new street side window and (2) new dormer windows, new skylight at rear. (2) new bathrooms, convert attic space to conditional space. 1/f: replace one street side window and one not visible from street. add new exterior door to the backyard. basement: (2) new windows visibDetails
2/f: interior remodel, add new street side window and (2) new dormer windows, new skylight at rear. (2) new bathrooms, convert attic space to conditional space. 1/f: replace one street side window and one not visible from street. add new exterior door to the backyard. basement: (2) new windows visib | $185,200 |
| May 3, 2018 | Completed final sign-off Oct 2019 | 527 Peralta Av | new door at rear 2nd fl, new deck at rear 2nd fl, kitchen remodel, infill at (e) lightwell.Details
new door at rear 2nd fl, new deck at rear 2nd fl, kitchen remodel, infill at (e) lightwell. | $50,000 | |
| Jan 26, 2018 | Completed final sign-off May 2018 | 142 Langton St | Kevin Llorente Construction | rebuild deck in-kind at rear at ground fl. maher naDetails
rebuild deck in-kind at rear at ground fl. maher na | $8,000 |
| Nov 20, 2017 | Never finaled issued Nov 2017, no final | 295 Yerba Buena Av | Macrobuild Corporation | revision to app#201709229352 extg foundation to support 8" ground floor excavation for new slab and new interior foundation with plywood sheathed wall at media room.Details
revision to app#201709229352 extg foundation to support 8" ground floor excavation for new slab and new interior foundation with plywood sheathed wall at media room. | $8,000 |
| Aug 2, 2017 | Completed final sign-off Dec 2018 | 4924 California St | Kevin Llorente Construction | convert (e) 610sf workshop area & part of garage to 758sf bedroom, bath with wet bar. 944sf alteration at entry level to kitchen, bath & add bath & laundry. add 272sf deck at 1st level 3. 379sf alteration at 2nd fl level, remodel bath and add bathroom.Details
convert (e) 610sf workshop area & part of garage to 758sf bedroom, bath with wet bar. 944sf alteration at entry level to kitchen, bath & add bath & laundry. add 272sf deck at 1st level 3. 379sf alteration at 2nd fl level, remodel bath and add bathroom. | $180,000 |
| Mar 16, 2017 | Completed final sign-off May 2019 | 220 Gates St | Remy's Quality Construction Inc. | structural revision to pa# 2013/11/27/3023.Details
structural revision to pa# 2013/11/27/3023. | |
| Dec 7, 2016 | Completed final sign-off Feb 2019 | 1855 Alabama St | create retaining wall in backyard. maintain (e) gradeDetails
create retaining wall in backyard. maintain (e) grade | $50,000 | |
| Aug 5, 2016 | Expired or cancelled cancelled Jun 2017 | 493 Eddy St | M H M Construction | cafe remodel.upgrade plumbing and electrical and remodel commercial kitchen and restroom. n/a for maherDetails
cafe remodel.upgrade plumbing and electrical and remodel commercial kitchen and restroom. n/a for maher | $35,000 |
| Jul 8, 2016 | Completed final sign-off Feb 2017 | 355 Head St | Bailey General Contracting Co Inc | remodel kitchen - replace in-kind. open up entryway leading into kitchen by installing new beam & posts.Details
remodel kitchen - replace in-kind. open up entryway leading into kitchen by installing new beam & posts. | $30,000 |
| Apr 1, 2016 | Completed final sign-off Jul 2017 | 149 Laidley St | ground level: re-paint front exterior wall, add recess led light in kitchen, dining rm, living rm, retrofit (e) north-east wall & remove one post from kitchen area. lower level 1: add recess led lighting at hallway. lower level 2: add led lighting & new wall & (n) structural beam @ bedroom.Details
ground level: re-paint front exterior wall, add recess led light in kitchen, dining rm, living rm, retrofit (e) north-east wall & remove one post from kitchen area. lower level 1: add recess led lighting at hallway. lower level 2: add led lighting & new wall & (n) structural beam @ bedroom. | $30,000 | |
| Nov 19, 2015 | Completed final sign-off Feb 2016 | 155 Steuart St | Solano Construction | in kind replacement of existing steel service stairs: demo existing steel service stairs, install new steel service stair to match existing. n/a ordinance #155-13Details
in kind replacement of existing steel service stairs: demo existing steel service stairs, install new steel service stair to match existing. n/a ordinance #155-13 | $25,000 |