Sunny Tam
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Studio O2
- Based in
- Campbell
- On San Francisco permits
- Nov 2004 to Aug 2026
23 permits since 2000 (architect on 20 permits, authorized agent-others on 1 permit, designer on 1 permit, engineer on 1 permit): 11 completed, 2 in progress, 3 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 26, 2026 | In progress filed Aug 2026, not yet issued | 1649 Divisadero St | g/f ti. for new boba tea shop.Details
g/f ti. for new boba tea shop. | $125,000 | |
| Sep 26, 2023 | In progress issued Feb 2025 | 4485 Mission St | Kitami | ti: new kitchen equipment, millwork, finishes, restroom, lighting.Details
ti: new kitchen equipment, millwork, finishes, restroom, lighting. | $138,000 |
| Jul 27, 2021 | Expired or cancelled cancelled Jan 2026 | 1139 Taraval St | ti for an (e) tea shop. no change of use but to go only w/no customer seating or access to store interior. (n) partitions, (n) kitchen equipment layout, update (e) storeforont layoutDetails
ti for an (e) tea shop. no change of use but to go only w/no customer seating or access to store interior. (n) partitions, (n) kitchen equipment layout, update (e) storeforont layout | $85,000 | |
| Jan 21, 2021 | Expired or cancelled expired Nov 2025 | 1100 Taraval St | authorization of restaurant use. restaurant ti in an (e) 2 story office/restaurant. new wall partition. rework accessible restrooms. rework liquor bar. new rooftop hvac & exhaust fan. install wheelchair lift. existing type i hood to remain. no change to exterior.Details
authorization of restaurant use. restaurant ti in an (e) 2 story office/restaurant. new wall partition. rework accessible restrooms. rework liquor bar. new rooftop hvac & exhaust fan. install wheelchair lift. existing type i hood to remain. no change to exterior. | $95,000 | |
| Dec 23, 2019 | Completed final sign-off Mar 2022 | 479 Lakeshore Dr | interior remodel to an existing sfd with a garage lower level & upper main level living space. scope of work includes creating an open-concept plan between existing kitchen & living room. remodel to all existing bathrooms, new paint & floor finish, new skylight, sun tunnels, & new bedroomsDetails
interior remodel to an existing sfd with a garage lower level & upper main level living space. scope of work includes creating an open-concept plan between existing kitchen & living room. remodel to all existing bathrooms, new paint & floor finish, new skylight, sun tunnels, & new bedrooms | $95,000 | |
| May 8, 2019 | Completed final sign-off Jun 2020 | 357 Vicente St | Delgado Construction | interior remodel for 3-story residence. work only occuring on 1st & 3rd flrs. mod interior non load-bearing wall. adding jack-n-jill bathroom, replacing plumb fixtures at master bath, (n) paint & finishes, 1 (n) skylight for jack-n-jill. add (n) bedroom at ground flr.Details
interior remodel for 3-story residence. work only occuring on 1st & 3rd flrs. mod interior non load-bearing wall. adding jack-n-jill bathroom, replacing plumb fixtures at master bath, (n) paint & finishes, 1 (n) skylight for jack-n-jill. add (n) bedroom at ground flr. | $30,000 |
| Apr 12, 2019 | Never finaled issued Feb 2020, no final | 920 North Point St | C & C General Engineering Inc. | revision to pa 2018-0905-9186 - install a material lift in lieu of a freight elevator to connect the basement kitchen to the restaurant back of houseDetails
revision to pa 2018-0905-9186 - install a material lift in lieu of a freight elevator to connect the basement kitchen to the restaurant back of house | |
| Sep 5, 2018 | Never finaled issued Apr 2019, no final | 920 North Point St | C & C General Engineering Inc. | revisionto 201803012567 to add a freight elevator to connect the basement kitchen to the restaurant back of house at garage levelDetails
revisionto 201803012567 to add a freight elevator to connect the basement kitchen to the restaurant back of house at garage level | $100,000 |
| Sep 4, 2018 | Completed final sign-off Mar 2019 | 3251 20th Av | Cogent Construction & Consulting Inc | space 172 interior ti work includes kitchen reconfigureation, new service counter, grease eshaust and makeup airDetails
space 172 interior ti work includes kitchen reconfigureation, new service counter, grease eshaust and makeup air | $350,000 |
| Mar 1, 2018 | Completed final sign-off Mar 2019 | 920 North Point St | aka 900 north point street, tenant improvement to an (e) restaurant. the proposed use remains unchanged. interior improvement includes (n) counter, exising wall, equipments. no change to the exterior or rooftop equipment.Details
aka 900 north point street, tenant improvement to an (e) restaurant. the proposed use remains unchanged. interior improvement includes (n) counter, exising wall, equipments. no change to the exterior or rooftop equipment. | $185,000 | |
| Aug 9, 2016 | Completed final sign-off Nov 2016 | 3251 20th Av | Cogent Construction & Consulting Inc | #239: tenant improvement to an existing retail.scope includes new ceiling,lighting,display cases.existing accessible restroom,storefront to remain. new water source heat pump.Details
#239: tenant improvement to an existing retail.scope includes new ceiling,lighting,display cases.existing accessible restroom,storefront to remain. new water source heat pump. | $50,000 |
| May 2, 2016 | Never finaled issued May 2016, no final | 505 Beach St | Able Painting & Construction Co | re-design grease duct route to be installed exposed on rear bldg wall. revision to app#201601257853. ansul submittal separate n/a for maherDetails
re-design grease duct route to be installed exposed on rear bldg wall. revision to app#201601257853. ansul submittal separate n/a for maher | $7,500 |
| Jan 25, 2016 | Completed final sign-off Dec 2016 | 505 Beach St | Able Painting & Construction Co | modify (e) kitchen with new type i hood, new kitchen equipment, grease exhaust & make up air unit. n/a maher ord. 155-13Details
modify (e) kitchen with new type i hood, new kitchen equipment, grease exhaust & make up air unit. n/a maher ord. 155-13 | $75,000 |
| Dec 8, 2011 | Completed final sign-off Jan 2012 | 2125 Polk St | All Applied Construction Inc | change of use. remodel extg yogurt store.Details
change of use. remodel extg yogurt store. | $65,000 |
| Dec 22, 2010 | Expired or cancelled cancelled Jan 2020 | 170 West Portal Av | All Applied Construction Inc | convert a vacant retail card store into a full service restaurant.Details
convert a vacant retail card store into a full service restaurant. | $120,000 |
| Aug 30, 2010 | Completed final sign-off Oct 2010 | 2208 Fillmore St | All Applied Construction Inc | remodel a specialty food store into a yogurt store.Details
remodel a specialty food store into a yogurt store. | $35,000 |
| Oct 19, 2009 | Completed final sign-off Dec 2009 | 50 08th St | revision to application 200904247034. field revision. storefront glass changed. ces 200225043.Details
revision to application 200904247034. field revision. storefront glass changed. ces 200225043. | $5,000 | |
| Jan 9, 2007 | Completed final sign-off Jan 2007 | 800 Bryant St | Guru Electric | renew:200504070957Details
renew:200504070957 | |
| Dec 18, 2006 | Expired or cancelled cancelled Jan 2026 | 1125 Ocean Av | All Applied Construction Inc | remove "m" occupancy to combine with appl # 200505051695, order to comply with "final inspection". there are no changes to the floor plan.Details
remove "m" occupancy to combine with appl # 200505051695, order to comply with "final inspection". there are no changes to the floor plan. | |
| Aug 9, 2005 | Expired or cancelled expired May 2007 | 163 02nd St | Guru Electric | t.i.for new small fast food restaurant -const partition wall between service area & kitchen.Details
t.i.for new small fast food restaurant -const partition wall between service area & kitchen. | $100,000 |
| May 5, 2005 | Completed final sign-off Feb 2007 | 1125 Ocean Av | ground flr tenant improvement to a new raw shell. proposed use is to be full service restaurantDetails
ground flr tenant improvement to a new raw shell. proposed use is to be full service restaurant | $160,000 | |
| Feb 2, 2005 | Expired or cancelled expired Feb 2012 | 2801 Folsom St | remodel (e) mens restroom to new mens restroom on ground floor restaurant.Details
remodel (e) mens restroom to new mens restroom on ground floor restaurant. | $4,000 | |
| Nov 9, 2004 | Expired or cancelled expired Nov 2008 | 279 Columbus Av | Huey Const Mngmt Co Inc - Dba M H Const. | repaint, retile, addition of coffee counter.Details
repaint, retile, addition of coffee counter. | $55,000 |