Permit GraphShortlistSan Francisco building permits since 2000

Katherine Hallal

License
C25737
Look the license up with the state
Listed as
architect
Based in
Mill Valley
On San Francisco permits
May 2015 to Feb 2024

9 permits since 2000 (architect on 9 permits): 8 completed, 1 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Feb 6, 2024Completed
final sign-off Mar 2024
917 Central AvCp/M Company Inc.revision to pa# 2015-1223-5837 fill-in living space under approved 2nd fl deck. revised bathroom layout on 1st fl. no structural changes
Details
Permit
202402065360
Status
complete
Filed
Feb 6, 2024
Permit issued
Feb 13, 2024
Final sign-off
Mar 15, 2024
Declared cost
$25,000
Address
917 Central Av

revision to pa# 2015-1223-5837 fill-in living space under approved 2nd fl deck. revised bathroom layout on 1st fl. no structural changes

Open the permit page

$25,000
Jun 12, 2023Completed
final sign-off Sep 2026
778 27th Avremodel (e) 2nd floor kitchen, baths (2) enclose entry and add (n) bath @ 1st floor; drywall to (e) garage and remodel (e) living, dining. seismic upgrade
Details
Permit
202306129848
Status
complete
Filed
Jun 12, 2023
Permit issued
Nov 14, 2023
Final sign-off
Sep 10, 2026
Declared cost
$275,000
Address
778 27th Av

remodel (e) 2nd floor kitchen, baths (2) enclose entry and add (n) bath @ 1st floor; drywall to (e) garage and remodel (e) living, dining. seismic upgrade

Open the permit page

$275,000
Aug 17, 2022Completed
final sign-off Oct 2023
636 04th Avremodel (e) 1-1/2 bath into 4 bathrooms, add 1 window. move(e) door. remodel (e) 2 rooms to office on g/f. sheetrock (e) garage to provide fire separation.
Details
Permit
202208170740
Status
complete
Filed
Aug 17, 2022
Permit issued
Aug 31, 2022
Final sign-off
Oct 5, 2023
Declared cost
$80,000
Address
636 04th Av

remodel (e) 1-1/2 bath into 4 bathrooms, add 1 window. move(e) door. remodel (e) 2 rooms to office on g/f. sheetrock (e) garage to provide fire separation.

Open the permit page

$80,000
Mar 4, 2022Completed
final sign-off Sep 2022
280 Spear StBbc Construction Inc.commercial space 1a: t.i. for new optometry: 3 exam rooms, lab,pantry and retail. electrical, life/safety,mechanical, plumbing and sprinkler work under sep permit.
Details
Permit
202203049293
Status
complete
Filed
Mar 4, 2022
Permit issued
Mar 28, 2022
Final sign-off
Sep 28, 2022
Declared cost
$175,000
Address
280 Spear St

commercial space 1a: t.i. for new optometry: 3 exam rooms, lab,pantry and retail. electrical, life/safety,mechanical, plumbing and sprinkler work under sep permit.

Open the permit page

$175,000
Mar 5, 2021Completed
final sign-off Nov 2021
1163 Tennessee StSure, Inc.new bathroom with soaking tub & tempered sliding door, toilet, base cabinet and paint grade wood shelves. demolition on non-loading vent shaft and remove abandoned vents from lower floors. gc to confirm existing smoke alarm & carbon monoxide alarm per crc 315 & 315.
Details
Permit
202103055953
Status
complete
Filed
Mar 5, 2021
Permit issued
May 12, 2021
Final sign-off
Nov 17, 2021
Declared cost
$8,000
Address
1163 Tennessee St

new bathroom with soaking tub & tempered sliding door, toilet, base cabinet and paint grade wood shelves. demolition on non-loading vent shaft and remove abandoned vents from lower floors. gc to confirm existing smoke alarm & carbon monoxide alarm per crc 315 & 315.

Open the permit page

$8,000
May 7, 2018Completed
final sign-off Nov 2018
777 Florida StB W H Builder Inc.construct 2 new accessible restrooms and pantry for common area 201, 203 and 205
Details
Permit
201805078422
Status
complete
Filed
May 7, 2018
Permit issued
Aug 30, 2018
Final sign-off
Nov 6, 2018
Declared cost
$20,000
Address
777 Florida St

construct 2 new accessible restrooms and pantry for common area 201, 203 and 205

Open the permit page

$20,000
Jan 2, 2018Completed
final sign-off Sep 2018
777 Florida StRoebuck Constructiontenant improvement with new accessible restrooms, 1 new 1 hr rated common corridor, mech, elec, plumbing, sprinkler work under sep permit. combine suites 200, 202, 204, 206 and 208. maher na
Details
Permit
201801027654
Status
complete
Filed
Jan 2, 2018
Permit issued
Jan 24, 2018
Final sign-off
Sep 17, 2018
Declared cost
$200,000
Address
777 Florida St

tenant improvement with new accessible restrooms, 1 new 1 hr rated common corridor, mech, elec, plumbing, sprinkler work under sep permit. combine suites 200, 202, 204, 206 and 208. maher na

Open the permit page

$200,000
Aug 2, 2017Never finaled
issued Aug 2017, no final
177 Post StGolden Gate Glass And Mirror Co Inc9th fl: suite #900 - replace (e) 45 min fire rated door and frame with new 45 min fire rated metal door frame with firelite nt glazing.
Details
Permit
201708023627
Status
issued
Filed
Aug 2, 2017
Permit issued
Aug 30, 2017
Declared cost
$15,000
Address
177 Post St

9th fl: suite #900 - replace (e) 45 min fire rated door and frame with new 45 min fire rated metal door frame with firelite nt glazing.

Open the permit page

$15,000
May 28, 2015Completed
final sign-off May 2016
1320 Taylor StUpscale Construction Inc.convert storage to new meditation room. add laundry and 1/2 bath to exiting ground fl room. new electrical and plumbinb. sprinklers under separate permit lights low efficacy
Details
Permit
201505287409
Status
complete
Filed
May 28, 2015
Permit issued
Nov 12, 2015
Final sign-off
May 25, 2016
Declared cost
$83,000
Address
1320 Taylor St

convert storage to new meditation room. add laundry and 1/2 bath to exiting ground fl room. new electrical and plumbinb. sprinklers under separate permit lights low efficacy

Open the permit page

$83,000