Lorin Hill
- Listed as
- architect, authorized agent-others
- Firm
- Lorin Hill, Architect
- Based in
- Oakland
- On San Francisco permits
- Apr 2004 to Mar 2026
31 permits since 2000 (architect on 30 permits, authorized agent-others on 1 permit): 20 completed, 3 in progress, 5 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 6, 2026 | In progress issued Mar 2026 | 16 Sloat Bl | Modern Craft Construction | revision to issued permit # 202505075965. minor changes to windows at sides and skylights. structural updates per plans.Details
revision to issued permit # 202505075965. minor changes to windows at sides and skylights. structural updates per plans. | |
| Sep 30, 2025 | Completed final sign-off Mar 2026 | 2151 Filbert St | Arc Builders & Development Inc | removal of unauthorized dwelling unit to comply with nov 202427911 - remove cooking appliance and electric wall heater to revert space to unconditioned for common use by tenantsDetails
removal of unauthorized dwelling unit to comply with nov 202427911 - remove cooking appliance and electric wall heater to revert space to unconditioned for common use by tenants | $500 |
| Jul 8, 2025 | In progress issued Jul 2025 | 43 Whitney St | Blackline Construction | infill 533 sf ground floor, below existing deck to include new primary suite with bedroom, bathroom, 2 closets, and direct garden access. relocate existing deck stair with new fire rated wall at property line. waterproof existing main floor terrace & relocate associated stair. create new serviceDetails
infill 533 sf ground floor, below existing deck to include new primary suite with bedroom, bathroom, 2 closets, and direct garden access. relocate existing deck stair with new fire rated wall at property line. waterproof existing main floor terrace & relocate associated stair. create new service | $200,000 |
| May 7, 2025 | In progress issued Jul 2025 | 16 Sloat Bl | Modern Craft Construction | expand living space into part of garage add new code compliant interior stair to conncet floors reconfigure bedrooms and kitchen as needed and bathrooms at both levels remove fireplace and cantilevered masonry chimneyDetails
expand living space into part of garage add new code compliant interior stair to conncet floors reconfigure bedrooms and kitchen as needed and bathrooms at both levels remove fireplace and cantilevered masonry chimney | $240,000 |
| Feb 27, 2020 | Completed final sign-off Jul 2021 | 1460 Willard St | De Brus Construction Inc | dining room renovations with new wall openings, new gas fireplace, new property line fire rated windows.Details
dining room renovations with new wall openings, new gas fireplace, new property line fire rated windows. | $70,000 |
| Feb 27, 2020 | Never finaled issued Mar 2022, no final | 319 Bosworth St | renovation to (e) single family two-story dwelling. a new guest bedroom/bathroom at 1st flr. a new interior stair. renovations to (e) dwelling include a kitchen renovation, new roofing and new skylights.Details
renovation to (e) single family two-story dwelling. a new guest bedroom/bathroom at 1st flr. a new interior stair. renovations to (e) dwelling include a kitchen renovation, new roofing and new skylights. | $150,000 | |
| Oct 15, 2019 | Expired or cancelled cancelled Jun 2021 | 2766 39th Av | Bradford Construction | horizontal rear yard addition on 2 levels, (n) slab foundation w/ partial excavation & retaining walls. demolition of (e) bathroom and kitchen. (n) kitchen, (2) bathrooms and (1) half-bath.Details
horizontal rear yard addition on 2 levels, (n) slab foundation w/ partial excavation & retaining walls. demolition of (e) bathroom and kitchen. (n) kitchen, (2) bathrooms and (1) half-bath. | $500,000 |
| Sep 18, 2018 | Never finaled issued Aug 2019, no final | 814 Noe St | Insight Construction Partners Inc | renovations to an (e) sfh converting sub-standard areas(ground flr garage) to (n) habitable space. a (n) foundation & slab w/ partial excavation & retaining for an 8'-0" ceiling height @ ground level. (n) media room w/ full bathroom @ground level. (n) interior stair to upper level entry.Details
renovations to an (e) sfh converting sub-standard areas(ground flr garage) to (n) habitable space. a (n) foundation & slab w/ partial excavation & retaining for an 8'-0" ceiling height @ ground level. (n) media room w/ full bathroom @ground level. (n) interior stair to upper level entry. | $165,000 |
| Jun 8, 2018 | Completed final sign-off Sep 2018 | 2151 Filbert St | Yiu's Construction Co | all work is in unit #2153 filbert street: remodel kitchen & remove (e) wall, remodel (e) bathroom, and add (n) bathroom. new footings at ground level. replace exterior french doors in kind. n/a maherDetails
all work is in unit #2153 filbert street: remodel kitchen & remove (e) wall, remodel (e) bathroom, and add (n) bathroom. new footings at ground level. replace exterior french doors in kind. n/a maher | $55,000 |
| Apr 25, 2017 | Expired or cancelled expired Nov 2022 | 2523 Harrison St | Kalix Inc Dbalara Construction | renovate (e) single family dwelling convert substandard areas to legitimate habitable space. new foundation & slab with partial excavation & retaining for 8'-0" ceiling height @ ground level. new stair to upper floor with roof dormer additions. kitchen & bathroom renovation.Details
renovate (e) single family dwelling convert substandard areas to legitimate habitable space. new foundation & slab with partial excavation & retaining for 8'-0" ceiling height @ ground level. new stair to upper floor with roof dormer additions. kitchen & bathroom renovation. | $300,000 |
| Mar 14, 2017 | Completed final sign-off Oct 2020 | 2153 Sacramento St | De Brus Construction Inc | six(6) units #2,3,4,5,7,& 11 - reovations w/ new kitchens (enlarge) & bathrms. units 2 & 5 have 1 bathrm. units 3,4,7,11 get a 2nd (new) bathrm from converted closets. replace kitchen lightwell windows (not visible from street).merge hallway w/ bedrms , g/ 1 hr corridor n/a maher ordinanceDetails
six(6) units #2,3,4,5,7,& 11 - reovations w/ new kitchens (enlarge) & bathrms. units 2 & 5 have 1 bathrm. units 3,4,7,11 get a 2nd (new) bathrm from converted closets. replace kitchen lightwell windows (not visible from street).merge hallway w/ bedrms , g/ 1 hr corridor n/a maher ordinance | $450,000 |
| Nov 6, 2015 | Never finaled issued Jun 2016, no final | 2591 26th Av | S Mc Cann Construction Inc | coverting rear portion of 1st flr into conditioned space, 2 bedrooms, bath, laundry & 1 hr rated corridor to public way. enclose private lightwell at second flr and add two skylights. all changes are within the building footprint. + rear deck @ gradeDetails
coverting rear portion of 1st flr into conditioned space, 2 bedrooms, bath, laundry & 1 hr rated corridor to public way. enclose private lightwell at second flr and add two skylights. all changes are within the building footprint. + rear deck @ grade | $155,000 |
| Nov 20, 2014 | Completed final sign-off Jun 2015 | 723 Clayton St | Philip Going Inc. | bathroom renovation with small expansion into adjacent closet, replace one window at lightwell. not visible from streetDetails
bathroom renovation with small expansion into adjacent closet, replace one window at lightwell. not visible from street | $14,500 |
| Aug 21, 2014 | Never finaled issued Aug 2015, no final | 2423 Green St | S Mc Cann Construction Inc | horizontal rear yard addition on one level: new one bedroom. remodel one bathroom. maher ord not applicable.Details
horizontal rear yard addition on one level: new one bedroom. remodel one bathroom. maher ord not applicable. | $71,500 |
| Feb 11, 2014 | Completed final sign-off Jun 2014 | 58 Cumberland St | comply w/nov #201309531 - in-kind replacement of rear exterior stair - common area. required 2nd means of egress.Details
comply w/nov #201309531 - in-kind replacement of rear exterior stair - common area. required 2nd means of egress. | $21,000 | |
| Nov 26, 2013 | Completed final sign-off Dec 2013 | 1630 Clay St | Kalix Inc Dbalara Construction | #5: remove one property line window, infill with rated wall assembly. add one skylight.Details
#5: remove one property line window, infill with rated wall assembly. add one skylight. | $2,900 |
| Aug 9, 2013 | Completed final sign-off Jul 2015 | 18 Whitney St | Bradford Construction | horiz. rear yard addition on 3 levels, with renovations to (e) bldg add 2 bathrms, remodel 1 bathrm, relocate 1/2 bath. rear yard deck and stairs, add 2 bedrms, new kitchenDetails
horiz. rear yard addition on 3 levels, with renovations to (e) bldg add 2 bathrms, remodel 1 bathrm, relocate 1/2 bath. rear yard deck and stairs, add 2 bedrms, new kitchen | $370,000 |
| Jan 3, 2013 | Completed final sign-off Mar 2013 | 2325 Filbert St | Armand Proulx | replace (e) exterior service stair in kind.Details
replace (e) exterior service stair in kind. | $4,500 |
| Jun 25, 2012 | Completed final sign-off Apr 2014 | 85 Manchester St | Gil Construction & Assoc Inc., Elliott Build Remodel Llc | construct rear yard decks (2 levels) and stairs. modify 1 window replace w/ door and window. add one window. variance app#20120749.Details
construct rear yard decks (2 levels) and stairs. modify 1 window replace w/ door and window. add one window. variance app#20120749. | $15,000 |
| Nov 14, 2011 | Completed final sign-off Jul 2012 | 1370 Clayton St | Philip Going Inc. | interior renovations, kitchen & bathroom at 1st floor floor, new stair connecting 1st & 2nd floor, kitchen renovation oat 2nd floor, kitchen renovation at 2nd floor, metge two bathrooms to make master bath & add bath on 3rd floor. no structural work.Details
interior renovations, kitchen & bathroom at 1st floor floor, new stair connecting 1st & 2nd floor, kitchen renovation oat 2nd floor, kitchen renovation at 2nd floor, metge two bathrooms to make master bath & add bath on 3rd floor. no structural work. | $95,000 |
| Jul 14, 2011 | Completed final sign-off Apr 2012 | 31 Casa Wy | Golden West Construction | revision to approved pa# 2010/06/09/4193. add spiral stair with fire wall to roof terrace. move outdoor fireplace to south wall of 4th floor terrace. move elec panel/meter to southeast corner of bldg. delete rooftop mech penthouse. change to radiant heat with boiler at ground floor.Details
revision to approved pa# 2010/06/09/4193. add spiral stair with fire wall to roof terrace. move outdoor fireplace to south wall of 4th floor terrace. move elec panel/meter to southeast corner of bldg. delete rooftop mech penthouse. change to radiant heat with boiler at ground floor. | $11,500 |
| Jun 21, 2011 | Completed final sign-off Apr 2012 | 31 Casa Wy | Golden West Construction | revision to appl #201006094193-s1/r1: substitute fire -treated ply roof decking for parapets.Details
revision to appl #201006094193-s1/r1: substitute fire -treated ply roof decking for parapets. | |
| May 12, 2011 | Completed final sign-off Nov 2011 | 1567 Shrader St | Altmann & Associates, Inc | revision to appl #201012086337: move laundry closet, delete wet bar, expand ground floor mud room, relocate garage door to original location at front of bldg. steam shower @ master bath (modify existing shower).Details
revision to appl #201012086337: move laundry closet, delete wet bar, expand ground floor mud room, relocate garage door to original location at front of bldg. steam shower @ master bath (modify existing shower). | $5,000 |
| Apr 8, 2011 | Completed final sign-off Mar 2013 | 325 Bosworth St | H Construction Co | rear yard horizontal addition to create family room, den, laundray and bathroom at ground level. 2nd story infill additon at stairs only.Details
rear yard horizontal addition to create family room, den, laundray and bathroom at ground level. 2nd story infill additon at stairs only. | $120,000 |
| Aug 12, 2009 | Completed final sign-off Nov 2009 | 1630 Clay St | Kalix Inc Dbalara Construction | interior renovations in unit 1, 2nd floor. remodel kitchen, bathroom, closet, infill one window on prop line. new header, posts and beams for wall opening between living room and bedroom on 2nd floor.Details
interior renovations in unit 1, 2nd floor. remodel kitchen, bathroom, closet, infill one window on prop line. new header, posts and beams for wall opening between living room and bedroom on 2nd floor. | $29,000 |
| Mar 13, 2009 | Completed final sign-off May 2011 | 764 Ulloa St | Bradford Construction | horizontal addition to 3rd floor-add 2 bedrooms, 1 bathroom & laundry. remodel master bathroom, kitchen & family room. add deck & stairs to rear yard. add 1 bathroom & remodel 1 bathroom to 2nd floor.Details
horizontal addition to 3rd floor-add 2 bedrooms, 1 bathroom & laundry. remodel master bathroom, kitchen & family room. add deck & stairs to rear yard. add 1 bathroom & remodel 1 bathroom to 2nd floor. | $180,000 |
| Mar 26, 2007 | Completed final sign-off Sep 2008 | 451 Ulloa St | vertical addition to add 3 bedrooms 1 bath, 1 play areaDetails
vertical addition to add 3 bedrooms 1 bath, 1 play area | $175,000 | |
| Dec 22, 2005 | Completed final sign-off Mar 2006 | 1630 Clay St | Kalix Inc Dbalara Construction | interior renovation to units #3 and #5/remodel kchn bath, closets/replace 18 front wndws/no structural work/2 kchn/2 bth total/wndw facing street/marvin painted wood tilt pac units in all 3 units facing streetDetails
interior renovation to units #3 and #5/remodel kchn bath, closets/replace 18 front wndws/no structural work/2 kchn/2 bth total/wndw facing street/marvin painted wood tilt pac units in all 3 units facing street | $58,000 |
| Nov 23, 2005 | Completed final sign-off Mar 2007 | 199 Chestnut St | 4th floor, unit 6 - proposed addition of private elevator serving owners unit at fourth floor.Details
4th floor, unit 6 - proposed addition of private elevator serving owners unit at fourth floor. | $60,000 | |
| Apr 5, 2005 | Never finaled issued Apr 2005, no final | 469 Guerrero St | renovate three kitchens, create 3 new bathrm, one in each unit, and 1/2 bath at ground floor commonDetails
renovate three kitchens, create 3 new bathrm, one in each unit, and 1/2 bath at ground floor common | $100,000 | |
| Apr 23, 2004 | Expired or cancelled withdrawn Nov 2004 | 3772 21st St | rear yard horizontal addition at first and second floors: master bedroom, bathroom, interior stair,Details
rear yard horizontal addition at first and second floors: master bedroom, bathroom, interior stair, | $75,000 |