Gelber Ramirez
- Listed as
- authorized agent-others, contractor
- Firm
- Star Waterproofing And Roofing
- Based in
- Walnut Creek
- On San Francisco permits
- Jun 2019 to Sep 2026
87 permits since 2000 (contractor on 87 permits, authorized agent-others on 3 permits): 73 completed, 10 in progress, 2 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 25, 2026 | In progress issued Sep 2026 | 1306 Montgomery St | Star Waterproofing And Roofing | unit 2: response to dbi inspector request repair & replace decayed wall-notvisible from the street. ref. permit #202606123131Details
unit 2: response to dbi inspector request repair & replace decayed wall-notvisible from the street. ref. permit #202606123131 | $5,000 |
| Aug 4, 2026 | In progress issued Aug 2026 | 435 Euclid Av | Star Waterproofing And Roofing | install 1/2" cdx plywood on roof. ref bldg-26-1465 reroofing permit.Details
install 1/2" cdx plywood on roof. ref bldg-26-1465 reroofing permit. | $9,000 |
| Jul 9, 2026 | In progress issued Jul 2026 | 940 Guerrero St | Star Waterproofing And Roofing | revision to 202605010481: 1st floor only, waterproof grind cracks, break stucco 10" up on wall to install flashings. detail cracks apply enduro waterproofing system and replace broken out stucco. all work in kind all exterior. 240 sq ftDetails
revision to 202605010481: 1st floor only, waterproof grind cracks, break stucco 10" up on wall to install flashings. detail cracks apply enduro waterproofing system and replace broken out stucco. all work in kind all exterior. 240 sq ft | $8,000 |
| Jun 12, 2026 | In progress issued Jun 2026 | 1306 Montgomery St | Star Waterproofing And Roofing | unit 2: exterior shear wall dry rot exploration and repair as needed. wall is in back of bldg non street facing. approximately 320 sq. ft.Details
unit 2: exterior shear wall dry rot exploration and repair as needed. wall is in back of bldg non street facing. approximately 320 sq. ft. | $3,000 |
| May 21, 2026 | Completed final sign-off Jun 2026 | 600 Laurel St | Star Waterproofing And Roofing | dry rot explorationDetails
dry rot exploration | $3,000 |
| May 20, 2026 | Completed final sign-off Jul 2026 | 1306 Montgomery St | Star Waterproofing And Roofing | tear off (e) plywood install 3/4 in cdx plywood and apply water proofing coatDetails
tear off (e) plywood install 3/4 in cdx plywood and apply water proofing coat | $24,000 |
| May 1, 2026 | In progress issued May 2026 | 940 Guerrero St | Star Waterproofing And Roofing | waterproof 5 walkways. grind cracks, break stucco 10" up on wall to install flashings. detail cracks apply enduro waterproofing system and replace broken out stucco. all work in kind all exterior. 1,580 sqft.Details
waterproof 5 walkways. grind cracks, break stucco 10" up on wall to install flashings. detail cracks apply enduro waterproofing system and replace broken out stucco. all work in kind all exterior. 1,580 sqft. | $45,000 |
| Apr 22, 2026 | Completed final sign-off May 2026 | 167 21st Av | Star Waterproofing And Roofing | tear off existing tar and gravel roof and install a 3-ply modified bitumen roof system, 2,600 sq ft. (with hotwork)Details
tear off existing tar and gravel roof and install a 3-ply modified bitumen roof system, 2,600 sq ft. (with hotwork) | $50,000 |
| Mar 23, 2026 | Completed final sign-off Jun 2026 | 911 Bryant St | Star Waterproofing And Roofing | concrete deck: tear off waterproofing membrane to concrete clean concrete apply liquid waterproofing gaco ub6421 on top of concrete deck at rear yard. no change to deck, not visible from street. 369 sqft.Details
concrete deck: tear off waterproofing membrane to concrete clean concrete apply liquid waterproofing gaco ub6421 on top of concrete deck at rear yard. no change to deck, not visible from street. 369 sqft. | $40,000 |
| Mar 5, 2026 | Completed final sign-off Jun 2026 | 600 Laurel St | Star Waterproofing And Roofing | revision to pa#202601294836: unit 5, unit 11, and unit 18: remove existing (9) windows with milgrad fiberglass windows, like for like and in-kind in front of the building. all windows will be fiberglass windows, not aluminum windows.Details
revision to pa#202601294836: unit 5, unit 11, and unit 18: remove existing (9) windows with milgrad fiberglass windows, like for like and in-kind in front of the building. all windows will be fiberglass windows, not aluminum windows. | |
| Jan 30, 2026 | In progress issued Jan 2026 | 3955 17th St | Star Waterproofing And Roofing | reroofing: tear-off (e) roof system and installl 3ply modified bitumen roof system. torch down. 800 sq ft.Details
reroofing: tear-off (e) roof system and installl 3ply modified bitumen roof system. torch down. 800 sq ft. | $85,000 |
| Jan 29, 2026 | In progress issued Jan 2026 | 600 Laurel St | Star Waterproofing And Roofing | unit 5, unit 11, and unit 18: remove and replace (9) a-250 thermally improved aluminum windows per like and in-kind in front of the building. 3 windows per unit.Details
unit 5, unit 11, and unit 18: remove and replace (9) a-250 thermally improved aluminum windows per like and in-kind in front of the building. 3 windows per unit. | $35,000 |
| Jan 28, 2026 | Completed final sign-off Mar 2026 | 1615 Gough St | Star Waterproofing And Roofing | reroofing hot worksDetails
reroofing hot works | $32,000 |
| Jan 28, 2026 | Completed final sign-off Mar 2026 | 1619 Gough St | Star Waterproofing And Roofing | re roofing hot worksDetails
re roofing hot works | $32,000 |
| Dec 15, 2025 | Completed final sign-off Feb 2026 | 780 Treat Av | Star Waterproofing And Roofing | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $58,000 |
| Dec 10, 2025 | Completed final sign-off Jan 2026 | 16 Linda St | Star Waterproofing And Roofing | reroofing hot works.Details
reroofing hot works. | $26,000 |
| Dec 10, 2025 | Completed final sign-off Jan 2026 | 1700 Filbert St | Star Waterproofing And Roofing | reroofing hot works.Details
reroofing hot works. | $42,000 |
| Oct 14, 2025 | Completed final sign-off Nov 2025 | 3440 24th St | Star Waterproofing And Roofing | re-roofing: tear off the existing roof and install a new modified bitumen 3-ply roof system 5,750 sq ft, torch downDetails
re-roofing: tear off the existing roof and install a new modified bitumen 3-ply roof system 5,750 sq ft, torch down | $70,000 |
| Sep 26, 2025 | Completed final sign-off Oct 2025 | 440 Hyde St | Star Waterproofing And Roofing | re roofing: no hot works.Details
re roofing: no hot works. | $49,000 |
| Sep 3, 2025 | Completed final sign-off Oct 2025 | 490 31st Av | Star Waterproofing And Roofing | follow on to 202508193417.decay repair of rear siding,replace sheathing in kind, exterior wall, about 100 sq ft. rear of building.Details
follow on to 202508193417.decay repair of rear siding,replace sheathing in kind, exterior wall, about 100 sq ft. rear of building. | $11,000 |
| Aug 22, 2025 | Completed final sign-off Dec 2025 | 2027 Market St | Star Waterproofing And Roofing | replace rear facade window like for like. rot repair at window framing as needed like for like.Details
replace rear facade window like for like. rot repair at window framing as needed like for like. | $10,000 |
| Aug 19, 2025 | Completed final sign-off Oct 2025 | 490 31st Av | Star Waterproofing And Roofing | exterior restoration- rechaulk of all exterior surfaces, partial stucco remove and replace (crack repair), replace wood siding at rear. complete exterior paint. repair in kind.Details
exterior restoration- rechaulk of all exterior surfaces, partial stucco remove and replace (crack repair), replace wood siding at rear. complete exterior paint. repair in kind. | $25,000 |
| Aug 8, 2025 | Completed final sign-off Sep 2025 | 524 Ashbury St | Star Waterproofing And Roofing | re-roof. hot work. tear off existing composition shingles and modified bitumen roof systems and install new composition shingles and modified roof system. sloped roof composition shingles 1,990 sq. ft. flat roof modified bitumen 155 sq. ft. torch down.Details
re-roof. hot work. tear off existing composition shingles and modified bitumen roof systems and install new composition shingles and modified roof system. sloped roof composition shingles 1,990 sq. ft. flat roof modified bitumen 155 sq. ft. torch down. | $30,000 |
| Jul 10, 2025 | Completed final sign-off Jan 2026 | 1000 Van Ness Av | Star Waterproofing And Roofing | re-roofing w/ hot works: tear off existing roofing and insulation system. intall poly iso, install a tapered insulation system and a new cool roof modified bitumen. using certain feed flintlatic coolstar. sr=.70, te=.85. 44,400 sq ft.Details
re-roofing w/ hot works: tear off existing roofing and insulation system. intall poly iso, install a tapered insulation system and a new cool roof modified bitumen. using certain feed flintlatic coolstar. sr=.70, te=.85. 44,400 sq ft. | $1,250,000 |
| Jun 17, 2025 | Completed final sign-off Aug 2025 | 1306 10th Av | Star Waterproofing And Roofing | revision to pa # 202506037775. dry rot repair permit for rear façadeDetails
revision to pa # 202506037775. dry rot repair permit for rear façade | $7,500 |
| Jun 11, 2025 | Completed final sign-off Jun 2025 | 600 Head St | Star Waterproofing And Roofing | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $15,000 |
| Jun 3, 2025 | Completed final sign-off Aug 2025 | 1306 10th Av | Star Waterproofing And Roofing | remove + replace siding back wall of structure. (e) wood lap siding, to proposed hardie lap siding.Details
remove + replace siding back wall of structure. (e) wood lap siding, to proposed hardie lap siding. | $30,000 |
| Apr 28, 2025 | In progress issued Apr 2025 | 940 Guerrero St | Star Waterproofing And Roofing | re-roofing w/ hot works. to comply with nov 202432079 violation #1.Details
re-roofing w/ hot works. to comply with nov 202432079 violation #1. | $95,000 |
| Mar 25, 2025 | Completed final sign-off Apr 2025 | 1955 Franklin St | Star Waterproofing And Roofing | re-roofing with hot work.Details
re-roofing with hot work. | $29,000 |
| Mar 25, 2025 | Completed final sign-off Apr 2025 | 3010 Fulton St | Star Waterproofing And Roofing | re-roofing with hot work.Details
re-roofing with hot work. | $52,000 |
| Mar 18, 2025 | Completed final sign-off May 2025 | 95 Cervantes Bl | Star Waterproofing And Roofing | re-roofing - add second layer overlay. no hot work.Details
re-roofing - add second layer overlay. no hot work. | $30,000 |
| Mar 18, 2025 | Completed final sign-off May 2025 | 455 Warren Dr | Star Waterproofing And Roofing | re-roofing with hot works. no work to (e) roof structural sheathing.Details
re-roofing with hot works. no work to (e) roof structural sheathing. | $60,000 |
| Feb 18, 2025 | Completed final sign-off Mar 2025 | 721 Brannan St | Star Waterproofing And Roofing | install new 3/4" cdx plywood to roof framing.Details
install new 3/4" cdx plywood to roof framing. | $18,500 |
| Feb 18, 2025 | Completed final sign-off Mar 2025 | 721 Brannan St | Star Waterproofing And Roofing | re-roofing no hot works. not working on the flat roof that was completed in 2020.Details
re-roofing no hot works. not working on the flat roof that was completed in 2020. | $56,500 |
| Jan 22, 2025 | Completed final sign-off Mar 2025 | 600 17th Av | Star Waterproofing And Roofing | we were removing the siding and following description of work on existing permit (#202501077843). we came upon dry rotted framing. we will remove damaged framing and replace with new framing.Details
we were removing the siding and following description of work on existing permit (#202501077843). we came upon dry rotted framing. we will remove damaged framing and replace with new framing. | $20,000 |
| Jan 19, 2025 | Completed final sign-off Feb 2025 | 734 32nd Av | Star Waterproofing And Roofing | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $24,000 |
| Jan 7, 2025 | Completed final sign-off Mar 2025 | 600 17th Av | Star Waterproofing And Roofing | remove existing siding and dispose of it. install new fire rated flame block 1/2 odb sheer wall. install tyvek membrane. install new hardie artisan siding v-groove and trim. (back right side of building, not street visible).Details
remove existing siding and dispose of it. install new fire rated flame block 1/2 odb sheer wall. install tyvek membrane. install new hardie artisan siding v-groove and trim. (back right side of building, not street visible). | $24,000 |
| Dec 30, 2024 | Completed final sign-off Jan 2025 | 330 Chattanooga St | Star Waterproofing And Roofing | reroofing torch downDetails
reroofing torch down | $21,500 |
| Dec 17, 2024 | Completed final sign-off Jan 2025 | 995 Sanchez St | Star Waterproofing And Roofing | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $29,000 |
| Oct 22, 2024 | Completed final sign-off Jan 2025 | 1226 19th Av | Star Waterproofing And Roofing | remove more stucco from aroud two windows for exploration of dry rot (rear of building); fix dry rot; patch back in kind. ref pa# 2024-1001-2037Details
remove more stucco from aroud two windows for exploration of dry rot (rear of building); fix dry rot; patch back in kind. ref pa# 2024-1001-2037 | $9,000 |
| Oct 1, 2024 | Completed final sign-off Jan 2025 | 1226 19th Av | Star Waterproofing And Roofing | replace (2) windows at rear of building. repair stucco around windows.Details
replace (2) windows at rear of building. repair stucco around windows. | $8,500 |
| Sep 9, 2024 | Completed final sign-off Sep 2024 | 1690 Broadway | Star Waterproofing And Roofing | roof system replace comply w/ #2 of nov202420029Details
roof system replace comply w/ #2 of nov202420029 | $5,000 |
| Jun 26, 2024 | Completed final sign-off Jul 2024 | 58 Ellsworth St | Star Waterproofing And Roofing | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $15,000 |
| Apr 10, 2024 | Completed final sign-off May 2024 | 1841 Hyde St | Star Waterproofing And Roofing | re-roofingDetails
re-roofing | $15,000 |
| Mar 21, 2024 | Completed final sign-off Apr 2024 | 254 12th Av | Star Waterproofing And Roofing | re-roofing; install 1/2 cdx plywood on top of existing skip sheeting is under 202403218331Details
re-roofing; install 1/2 cdx plywood on top of existing skip sheeting is under 202403218331 | $20,000 |
| Mar 21, 2024 | Completed final sign-off Apr 2024 | 192 Yerba Buena Av | Star Waterproofing And Roofing | re-roofing; install 1/2 cdx plywood on top of existing skip sheeting under pa#: 202403218332Details
re-roofing; install 1/2 cdx plywood on top of existing skip sheeting under pa#: 202403218332 | $25,000 |
| Mar 4, 2024 | In progress issued Mar 2024 | 1519 Oak St | Star Waterproofing And Roofing | reroofing at lightwell. to comply with nov 202419758 item #3. all other items on nov remain outstanding. no work to (e) roof structural sheathing - (e) roof structural sheathing to remain.Details
reroofing at lightwell. to comply with nov 202419758 item #3. all other items on nov remain outstanding. no work to (e) roof structural sheathing - (e) roof structural sheathing to remain. | $10,975 |
| Jan 9, 2024 | In progress issued Jan 2024 | 1330 Howard St | Star Waterproofing And Roofing | reroofingDetails
reroofing | $80,000 |
| Oct 26, 2023 | Completed final sign-off Mar 2024 | 1269 Hyde St | Star Waterproofing And Roofing | reroofing: 1255 hyde not a legal address-Details
reroofing: 1255 hyde not a legal address- | $75,000 |
| Aug 25, 2023 | Completed final sign-off Sep 2023 | 50 Vienna St | Star Waterproofing And Roofing | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $14,000 |
| Aug 14, 2023 | Completed final sign-off Aug 2023 | 155 26th Av | Star Waterproofing And Roofing | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $15,000 |
| Aug 7, 2023 | Completed final sign-off Nov 2023 | 2390 Mission St | Star Waterproofing And Roofing | re-roofing. tear off existing roof system and install a new 3" iso insulation, and install gta fr coolstar modified bitumen roof system. approximately 6,122 sq.ft. will comply with cool roof requirements.Details
re-roofing. tear off existing roof system and install a new 3" iso insulation, and install gta fr coolstar modified bitumen roof system. approximately 6,122 sq.ft. will comply with cool roof requirements. | $97,000 |
| Jul 21, 2023 | Completed final sign-off Aug 2023 | 1572 Noe St | Star Waterproofing And Roofing | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $19,000 |
| Jun 23, 2023 | Completed final sign-off Oct 2023 | 111 New Montgomery St | Star Waterproofing And Roofing | reroofingDetails
reroofing | $90,000 |
| Jun 23, 2023 | Completed final sign-off Jul 2023 | 300 Prague St | Star Waterproofing And Roofing | reroofingDetails
reroofing | $36,750 |
| Jun 23, 2023 | Completed final sign-off Jul 2023 | 451 16th Av | Star Waterproofing And Roofing | reroofingDetails
reroofing | $19,000 |
| Jun 14, 2023 | Completed final sign-off Jul 2023 | 811 26th Av | Star Waterproofing And Roofing | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $18,000 |
| May 26, 2023 | Completed final sign-off Jul 2023 | 511 Waller St | Star Waterproofing And Roofing | reroofing. tear off (e) tar/gravel roof, install 3-ply modified bitumen roof system, 1,952 sq. ft.Details
reroofing. tear off (e) tar/gravel roof, install 3-ply modified bitumen roof system, 1,952 sq. ft. | $26,000 |
| Apr 18, 2023 | Completed final sign-off Jun 2023 | 4220 Cesar Chavez St | Star Waterproofing And Roofing | reroofingDetails
reroofing | $65,000 |
| Apr 3, 2023 | Completed final sign-off Apr 2023 | 118 Shotwell St | Star Waterproofing And Roofing | reroofing. tear off existing roofing system and install a 3 ply modified bitumen roof system. no removal of roof structural plywood sheathing (to be submitted under a separate permit application - pa 202304034921).Details
reroofing. tear off existing roofing system and install a 3 ply modified bitumen roof system. no removal of roof structural plywood sheathing (to be submitted under a separate permit application - pa 202304034921). | $22,000 |
| Mar 23, 2023 | Completed final sign-off May 2023 | 3100 Fulton St | Star Waterproofing And Roofing | reroofingDetails
reroofing | $85,000 |
| Mar 13, 2023 | Completed final sign-off Apr 2023 | 1847 10th Av | Star Waterproofing And Roofing | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $15,000 |
| Dec 14, 2022 | Completed final sign-off Dec 2022 | 71 Lisbon St | Star Waterproofing And Roofing | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $18,000 |
| Oct 24, 2022 | Completed final sign-off Nov 2022 | 2235 Beach St | Star Waterproofing And Roofing | tear off existing plywood and install new 1/2 inch cdx plywood. 3532 sqftDetails
tear off existing plywood and install new 1/2 inch cdx plywood. 3532 sqft | $10,000 |
| Oct 13, 2022 | Completed final sign-off Nov 2022 | 2235 Beach St | Star Waterproofing And Roofing | reroofingDetails
reroofing | $45,000 |
| Sep 14, 2022 | Never finaled issued Sep 2022, no final | 47 Dartmouth St | Star Waterproofing And Roofing | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $16,000 |
| Aug 24, 2022 | Completed final sign-off Feb 2023 | 2425 Mission St | Star Waterproofing And Roofing | reroofingDetails
reroofing | $36,200 |
| Aug 24, 2022 | Completed final sign-off Feb 2023 | 2423 Mission St | Star Waterproofing And Roofing | reroofing tear off existing gravel roof and install a modified bitumen roof system (3-ply) 2150 sqftDetails
reroofing tear off existing gravel roof and install a modified bitumen roof system (3-ply) 2150 sqft | $34,000 |
| May 5, 2022 | Completed final sign-off Jun 2022 | 2050 Beach St | Star Waterproofing And Roofing | reroofingDetails
reroofing | $15,000 |
| Apr 18, 2022 | Completed final sign-off Jul 2022 | 103 Carl St | Star Waterproofing And Roofing | reroofingDetails
reroofing | $60,000 |
| Mar 4, 2022 | Completed final sign-off Apr 2022 | 556 Waller St | Star Waterproofing And Roofing | reroofingDetails
reroofing | $39,000 |
| Feb 25, 2022 | Never finaled issued Feb 2022, no final | 2245 Beach St | Star Waterproofing And Roofing | reroofingDetails
reroofing | $3,000 |
| Feb 18, 2022 | Completed final sign-off Mar 2022 | 3830 Divisadero St | Star Waterproofing And Roofing | reroofingDetails
reroofing | $49,000 |
| Jan 14, 2022 | Completed final sign-off Feb 2022 | 1015 Shotwell St | Star Waterproofing And Roofing | reroofingDetails
reroofing | $20,000 |
| Jan 14, 2022 | Completed final sign-off Feb 2022 | 63 Woodward St | Star Waterproofing And Roofing | reroofingDetails
reroofing | $17,000 |
| Nov 8, 2021 | Expired or cancelled cancelled Jan 2026 | 3472 Mission St | Star Waterproofing And Roofing | reroofing: revison for bpa# 202111011558: remove existing plywood and replace with new cdx 1/2" plywood.Details
reroofing: revison for bpa# 202111011558: remove existing plywood and replace with new cdx 1/2" plywood. | $5,000 |
| Nov 1, 2021 | Completed final sign-off Jan 2022 | 3472 Mission St | Star Waterproofing And Roofing | reroofing.Details
reroofing. | $28,000 |
| Oct 7, 2021 | Completed final sign-off Nov 2021 | 14 Saturn St | Star Waterproofing And Roofing | reroofingDetails
reroofing | $15,000 |
| Apr 14, 2021 | Completed final sign-off Apr 2021 | 3435 Clay St | Star Waterproofing And Roofing | roofing remove and replace 2300 sq ft; remove tart and gravel; replace 3 ply mod bitDetails
roofing remove and replace 2300 sq ft; remove tart and gravel; replace 3 ply mod bit | $28,000 |
| Apr 1, 2021 | Completed final sign-off Apr 2021 | 1419 Kansas St | Star Waterproofing And Roofing | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $16,000 |
| Mar 3, 2021 | Completed final sign-off Mar 2021 | 359 Waller St | Star Waterproofing And Roofing | reroofingDetails
reroofing | $4,000 |
| Jun 10, 2020 | Expired or cancelled cancelled Jan 2026 | 721 Brannan St | Star Waterproofing And Roofing | reroofing. building a. tear off existing roof system and install a new modified bitumen roof system. 4,800 sq. ft.Details
reroofing. building a. tear off existing roof system and install a new modified bitumen roof system. 4,800 sq. ft. | $32,000 |
| Jun 5, 2020 | Completed final sign-off Jun 2020 | 333 Green St | Star Waterproofing And Roofing | reroofingDetails
reroofing | $16,000 |
| Oct 1, 2019 | Completed final sign-off Oct 2019 | 140 Shawnee Av | Star Waterproofing And Roofing | reroofingDetails
reroofing | $13,000 |
| Jul 29, 2019 | Completed final sign-off Sep 2019 | 1680 Evans Av | Star Waterproofing And Roofing | reroofingDetails
reroofing | $130,000 |
| Jun 20, 2019 | Completed final sign-off Jun 2019 | 4228 Geary Bl | Star Waterproofing And Roofing | ref pa #201906203933 (reroofing) - install new 1/2" cdx plywood 12 o.c., 6" spacingDetails
ref pa #201906203933 (reroofing) - install new 1/2" cdx plywood 12 o.c., 6" spacing | $10,000 |
| Jun 20, 2019 | Completed final sign-off Jul 2019 | 4228 Geary Bl | Star Waterproofing And Roofing | reroofingDetails
reroofing | $38,000 |