Page & Turnbull
- Listed as
- architect
- On San Francisco permits
- Sep 2021 to Sep 2024
5 permits since 2000 (architect on 5 permits): 2 completed, 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 13, 2024 | Completed final sign-off Mar 2026 | 1075 California St | Giampolini & Co Dba Giampolini/Courtney | exterior repairs including repair and selective replacement of roof level and 3rd level terra cotta balustrades and reinstallation or selective replacement of terra cotta urns. repair facade elements, including treatment of structural steel column in se corner and associated brick repair. selectiveDetails
exterior repairs including repair and selective replacement of roof level and 3rd level terra cotta balustrades and reinstallation or selective replacement of terra cotta urns. repair facade elements, including treatment of structural steel column in se corner and associated brick repair. selective | $1,750,000 |
| Nov 30, 2022 | Never finaled filed Nov 2022, never issued | 555 Post St | priority process - exterior repairs/deferred maintenance in compliance w/facade/inspection ord. remove brick to determine condition of embedded steel. repair/waterproofing of (e) embedded steel elements. replace corroded steel w/in wall. r/r brick as needed. repointing of brick mortar joints.Details
priority process - exterior repairs/deferred maintenance in compliance w/facade/inspection ord. remove brick to determine condition of embedded steel. repair/waterproofing of (e) embedded steel elements. replace corroded steel w/in wall. r/r brick as needed. repointing of brick mortar joints. | $165,000 | |
| Sep 28, 2022 | Completed final sign-off Nov 2023 | 2645 Gough St | Singular Builders | barrier removal work- construction of an accessible concrete ramp on grade at the side of the buiding. replace extg side door.Details
barrier removal work- construction of an accessible concrete ramp on grade at the side of the buiding. replace extg side door. | $20,000 |
| Sep 13, 2021 | Never finaled filed Sep 2021, never issued | 955 Post St | erect a new 8 story,69 dwelling apartment building and retail with parking with 1 basement type 1-bDetails
erect a new 8 story,69 dwelling apartment building and retail with parking with 1 basement type 1-b | $15,000,000 | |
| Sep 13, 2021 | Never finaled filed Sep 2021, never issued | 955 Post St | demolish a 2 story commercial garages.Details
demolish a 2 story commercial garages. | $100,000 |