Larry Paul
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- L.A. Paul & Associates
- Based in
- San Rafael
- On San Francisco permits
- Oct 2001 to Oct 2026
113 permits since 2000 (architect on 102 permits, authorized agent-others on 7 permits, engineer on 4 permits, designer on 1 permit): 76 completed, 12 in progress, 10 never finaled, 15 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 113.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 5 Porter St | remodel & expand (e) 3rd floor to add new bedrooms, bathroos, deck, laundry & stair. remodel (e) 2nd floor to add new living, dining, family room, kitchen, den/library & stair. remodel (e) 1st floor to add new bedroom, media room, bathroom, stair, utility room & garage.Details
remodel & expand (e) 3rd floor to add new bedrooms, bathroos, deck, laundry & stair. remodel (e) 2nd floor to add new living, dining, family room, kitchen, den/library & stair. remodel (e) 1st floor to add new bedroom, media room, bathroom, stair, utility room & garage. | $250,000 | |
| Sep 18, 2026 | In progress filed Sep 2026, not yet issued | 125 Alma St | General Max Construction | existing studio to be legalized as bedroom to respond to notice to verify host compliance. add new entry door, provide natural light and ventilation, add new bar sink counter and minifridge.Details
existing studio to be legalized as bedroom to respond to notice to verify host compliance. add new entry door, provide natural light and ventilation, add new bar sink counter and minifridge. | $15,000 |
| Apr 13, 2026 | In progress issued Oct 2026 | 125 Alma St | General Max Construction | addition to existing 3rd floor to remodel existing rooms & add new bedroom and balcony.Details
addition to existing 3rd floor to remodel existing rooms & add new bedroom and balcony. | $200,000 |
| Apr 2, 2026 | In progress filed Apr 2026, not yet issued | 80 Bronte St | remodel (e) kitchen, living, dining, family rooms and add half bath on 1/f. remodel (e) bedrooms and bathrooms and add bedroom, bath and laundry on 2/f. remodel (e) basement/garage to add bedroom, bath, entry and new stairway.Details
remodel (e) kitchen, living, dining, family rooms and add half bath on 1/f. remodel (e) bedrooms and bathrooms and add bedroom, bath and laundry on 2/f. remodel (e) basement/garage to add bedroom, bath, entry and new stairway. | $150,000 | |
| Feb 2, 2026 | In progress issued May 2026 | 1 Ankeny St | Culligan Construction | convert (e) bedroom, workroom and laundry into a (n) adu and add (n) kitchenDetails
convert (e) bedroom, workroom and laundry into a (n) adu and add (n) kitchen | $50,000 |
| Sep 2, 2025 | Completed final sign-off May 2026 | 67 Clairview Ct | Aero Living Inc, Arkspace Design Build Llc | revision 202507140747- to remove garage door and relocate window. visible from streetDetails
revision 202507140747- to remove garage door and relocate window. visible from street | |
| Aug 15, 2025 | Completed final sign-off Mar 2026 | 9 Clairview Ct | Aero Living Inc | revision to pa # 2025-0627-9675 remove bathroom and add shear walls.Details
revision to pa # 2025-0627-9675 remove bathroom and add shear walls. | |
| Jul 24, 2025 | In progress issued Aug 2025 | 75 Knollview Wy | Aero Living Inc | revision to pa # 202507020067: revise location of lavatory in bathroom on 1/f.Details
revision to pa # 202507020067: revise location of lavatory in bathroom on 1/f. | |
| Jul 14, 2025 | Completed final sign-off May 2026 | 67 Clairview Ct | Aero Living Inc, Arkspace Design Build Llc | add (n) bedroom and bathroom located on first floor.Details
add (n) bedroom and bathroom located on first floor. | $35,000 |
| Jul 14, 2025 | In progress issued Sep 2025 | 75 Knollview Wy | Aero Living Inc | revision 202507020067-replace (e) garage door and relocate (e) window at front.Details
revision 202507020067-replace (e) garage door and relocate (e) window at front. | |
| Jul 2, 2025 | In progress issued Jul 2025 | 75 Knollview Wy | Aero Living Inc | add new bedroom and bath to first floor. non-structural within footprint of building. no excavation or foundation work.Details
add new bedroom and bath to first floor. non-structural within footprint of building. no excavation or foundation work. | $35,000 |
| Jun 27, 2025 | Completed final sign-off Mar 2026 | 9 Clairview Ct | Aero Living Inc | convert portion of garage to habitable space on 1st floor. to add 2 bedrooms, 2 bathrooms, media room and laundry. remodel existing kitchen and bathroom on 2nd floor and add 1 bathroom & closets, remove wall between living room and kitchen.Details
convert portion of garage to habitable space on 1st floor. to add 2 bedrooms, 2 bathrooms, media room and laundry. remodel existing kitchen and bathroom on 2nd floor and add 1 bathroom & closets, remove wall between living room and kitchen. | $100,000 |
| May 23, 2025 | In progress issued Feb 2026 | 2625 San Jose Av | Cepheus Builders Inc | convert garage to new adu per planning code sec.207.2 (state adu) to add unit# 5. add new kitchen.Details
convert garage to new adu per planning code sec.207.2 (state adu) to add unit# 5. add new kitchen. | $50,000 |
| May 15, 2025 | In progress issued Oct 2025 | 667 32nd Av | Culligan Construction | remodel (e) kitchen; convert (e) workroom to 2 burner cooktop on 1st fl; add pergola. remodel existing kitchen on 2/fDetails
remodel (e) kitchen; convert (e) workroom to 2 burner cooktop on 1st fl; add pergola. remodel existing kitchen on 2/f | $25,000 |
| May 9, 2025 | In progress issued Jun 2025 | 75 Knollview Wy | Aero Living Inc | add new deck with spiral stair to rear of existing dwelling.Details
add new deck with spiral stair to rear of existing dwelling. | $20,000 |
| Apr 28, 2025 | Completed final sign-off May 2026 | 67 Clairview Ct | Aero Living Inc, Arkspace Design Build Llc | remodel (e) workroom to convert to rooms down w/ media room, bedroom, bathroom, half bath & laundry. remodel (e) kitchen & 2 bathrooms, remove hall closets & remove wall between living room & kitchen.Details
remodel (e) workroom to convert to rooms down w/ media room, bedroom, bathroom, half bath & laundry. remodel (e) kitchen & 2 bathrooms, remove hall closets & remove wall between living room & kitchen. | $100,000 |
| Jul 24, 2024 | Completed final sign-off Aug 2025 | 35 Buena Vista Tr | Wolfe Painting Co | rev 202404301086- per inspector -to repair and replace less than 50% of (e) deck and stairs in place and in kindDetails
rev 202404301086- per inspector -to repair and replace less than 50% of (e) deck and stairs in place and in kind | |
| Dec 8, 2023 | In progress filed Dec 2023, not yet issued | 3456 Mission St | for complaint with accessible building entrance program abe #201912230174 to provide barrier remediation for accessibe building entrance.Details
for complaint with accessible building entrance program abe #201912230174 to provide barrier remediation for accessibe building entrance. | $5,000 | |
| Sep 27, 2023 | Completed final sign-off Jul 2024 | 125 Alma St | General Max Construction | minor 50sf addition to rear of house to remodel kitchen, dining room & living room.Details
minor 50sf addition to rear of house to remodel kitchen, dining room & living room. | $30,000 |
| Aug 23, 2023 | Completed final sign-off Feb 2025 | 2625 San Jose Av | revise existing permit 201909202292 to add rear deck & utlity closet @ ground floor of existing 4 unit, 3 story apt house.Details
revise existing permit 201909202292 to add rear deck & utlity closet @ ground floor of existing 4 unit, 3 story apt house. | $15,000 | |
| Aug 7, 2023 | Completed final sign-off Jun 2024 | 2 Ankeny St | add new ground level wood deck < 3'h & fence with gates < 10' high.Details
add new ground level wood deck < 3'h & fence with gates < 10' high. | $5,000 | |
| Mar 29, 2023 | Expired or cancelled cancelled Jan 2026 | 1547 Church St | to comply w/ abe program 51-16, abe #201911228661. req approval of technical infeasibility for providing accessible building entrance due to (e) conditions of buildings entrance, steps and adjacent sidewalk, no proposed work on sidewalkDetails
to comply w/ abe program 51-16, abe #201911228661. req approval of technical infeasibility for providing accessible building entrance due to (e) conditions of buildings entrance, steps and adjacent sidewalk, no proposed work on sidewalk | ||
| Nov 7, 2022 | Never finaled issued May 2023, no final | 133 Venus St | Culligan Construction | 1st floor: remodel (e) rec room, bath, garage, add 2 bedrooms & add new 1 bath. 2nd floor: remodel (e) kitchen, dining, and 2 baths. replace (e) front & rear windows & rear siding.Details
1st floor: remodel (e) rec room, bath, garage, add 2 bedrooms & add new 1 bath. 2nd floor: remodel (e) kitchen, dining, and 2 baths. replace (e) front & rear windows & rear siding. | $50,000 |
| Nov 4, 2022 | Expired or cancelled cancelled Jan 2026 | 2 Fallon Pl | install new fence and security gateDetails
install new fence and security gate | $10,000 | |
| Jun 27, 2022 | Completed final sign-off Aug 2023 | 2267 39th Av | remodel 1st floor area (behind garage). area changed to family room and one fully bath. building remains a single family dwelling.Details
remodel 1st floor area (behind garage). area changed to family room and one fully bath. building remains a single family dwelling. | $50,000 | |
| Jun 1, 2022 | Completed final sign-off Jan 2026 | 126 Mullen Av | revision to pa# 201609309329.convert (e) attic to 2nd flr. add (n)opng and 4(n) dormers. add media rm and mudrm. add bathrooom, laundry to basement. enlarge basement in back of building. show requested calc. response to nov #2021008878 enf and 202183506 per sec 317 and 311 demo calc for dcpDetails
revision to pa# 201609309329.convert (e) attic to 2nd flr. add (n)opng and 4(n) dormers. add media rm and mudrm. add bathrooom, laundry to basement. enlarge basement in back of building. show requested calc. response to nov #2021008878 enf and 202183506 per sec 317 and 311 demo calc for dcp | $15,000 | |
| Mar 25, 2022 | Completed final sign-off Feb 2024 | 52 Mars St | Wolfe Painting Co | to comply with nov# 202184996. to document damage repair & replacement of dry-rotted walls, roof & floor with in-kind, in-place construction. work is in rear building. replace existing windows.Details
to comply with nov# 202184996. to document damage repair & replacement of dry-rotted walls, roof & floor with in-kind, in-place construction. work is in rear building. replace existing windows. | $12,000 |
| Oct 22, 2021 | Completed final sign-off May 2022 | 1818 Broadway | repair and replace in-kind, same size, same location, (e) 350 sf roof deck previously built under 8810421Details
repair and replace in-kind, same size, same location, (e) 350 sf roof deck previously built under 8810421 | $50,000 | |
| May 7, 2021 | Completed final sign-off Jun 2021 | 431 Collingwood St | sister damaged studs, replace mudsill & epoxy anchor bolts, patch approximately 12' of concrete, all work is in 12' section, in-kindDetails
sister damaged studs, replace mudsill & epoxy anchor bolts, patch approximately 12' of concrete, all work is in 12' section, in-kind | $8,000 | |
| Dec 9, 2020 | Completed final sign-off Jun 2021 | 125 Alma St | Gadi Construction Inc | 1st floor - remodel existing bathroom. 2nd floor - convert existing pantry to 1/2 bath.Details
1st floor - remodel existing bathroom. 2nd floor - convert existing pantry to 1/2 bath. | $15,000 |
| Dec 9, 2020 | Completed final sign-off Nov 2022 | 667 32nd Av | remodel extg rooms and provide 1-hour separation @ ceiling. 1/f remodel (e) room, laundry, add exercise room, bathroom/closet. 2/f remove non-structural wall between kitchen/dining room.Details
remodel extg rooms and provide 1-hour separation @ ceiling. 1/f remodel (e) room, laundry, add exercise room, bathroom/closet. 2/f remove non-structural wall between kitchen/dining room. | $50,000 | |
| Oct 3, 2020 | Completed final sign-off Mar 2021 | 2130 Harrison St | Cornerstone Dba Ag Construction | rebuild (e) roof decks & walkways, guardrails, gate & lighting in-kind.Details
rebuild (e) roof decks & walkways, guardrails, gate & lighting in-kind. | $50,000 |
| Aug 28, 2020 | Never finaled issued Mar 2021, no final | 2840 Harrison St | Wolfe Painting Co | 1st fl - remodel (e) sunroom, enlarge (e) bedroom & kitchen, replace (e) windows, additional bedroom added; 2nd fl - remodel (e) sunroom; enlarge (e) bedroom & kitchen. replace window, additional bedroom addedDetails
1st fl - remodel (e) sunroom, enlarge (e) bedroom & kitchen, replace (e) windows, additional bedroom added; 2nd fl - remodel (e) sunroom; enlarge (e) bedroom & kitchen. replace window, additional bedroom added | $85,000 |
| Aug 27, 2020 | Completed final sign-off Sep 2021 | 2025 O'farrell St | Velero Inc | revise existing pa 201704053304 to replace gas furnace with electric heating unit for accessory dwelling unit @ 1st floor of existing, 4 story, 6 unit multi-family dwellingDetails
revise existing pa 201704053304 to replace gas furnace with electric heating unit for accessory dwelling unit @ 1st floor of existing, 4 story, 6 unit multi-family dwelling | $800 |
| Mar 2, 2020 | Completed final sign-off Aug 2022 | 2840 Harrison St | Wolfe Painting Co | demo kitchen in both units, demo closets in both units per plan. reinstall kitchen cabinets and new counters, rough plumbing and fixtures. construct 2 baths accordin to plans. convert dining rm to bedroom, expansion into sunroom no exterior work. install new fixture flooring in 2 (e) bathroomDetails
demo kitchen in both units, demo closets in both units per plan. reinstall kitchen cabinets and new counters, rough plumbing and fixtures. construct 2 baths accordin to plans. convert dining rm to bedroom, expansion into sunroom no exterior work. install new fixture flooring in 2 (e) bathroom | $60,000 |
| Sep 20, 2019 | Completed final sign-off Feb 2025 | 2625 San Jose Av | Culligan Construction | per ordinance# 43-14, legalize (e) unpermitted unit @ ground floor of (e) house. 2 bedrooms & 2 baths. ** maher: n/a **Details
per ordinance# 43-14, legalize (e) unpermitted unit @ ground floor of (e) house. 2 bedrooms & 2 baths. ** maher: n/a ** | $45,000 |
| Aug 30, 2019 | Completed final sign-off Oct 2021 | 1742 La Salle Av | Culligan Construction | per ordinance 43-14, legalize (e) unpermitted dwelling unit @ ground fl, originally constructed per appln #200907213063Details
per ordinance 43-14, legalize (e) unpermitted dwelling unit @ ground fl, originally constructed per appln #200907213063 | $15,000 |
| May 23, 2019 | Completed final sign-off Jan 2021 | 57 Peters Av | Culligan Construction | convert (e) rooms to add'l 2nd unit at ground floorDetails
convert (e) rooms to add'l 2nd unit at ground floor | $15,000 |
| Jul 30, 2018 | Completed final sign-off Jun 2020 | 82 Mary St | repair fire damage for current code, provide auto fire sprinkler system per nfpa13 underground deferred submittalDetails
repair fire damage for current code, provide auto fire sprinkler system per nfpa13 underground deferred submittal | $120,000 | |
| Jun 26, 2018 | Completed final sign-off May 2019 | 2 Ankeny St | replace (e) retaining wall w/new retaining wallDetails
replace (e) retaining wall w/new retaining wall | $5,000 | |
| Jun 26, 2018 | Expired or cancelled expired Nov 2025 | 1074 Union St | Rei Build Up Construction Corp | seismic retrofit per prdinance 2016 cebc appendix a-4 for soft storyDetails
seismic retrofit per prdinance 2016 cebc appendix a-4 for soft story | $100,000 |
| Mar 13, 2018 | Completed final sign-off Feb 2019 | 1745 Revere Av | legalization of (e) unit with one bedroom and one bath per ord# 43-14.Details
legalization of (e) unit with one bedroom and one bath per ord# 43-14. | $15,000 | |
| Feb 2, 2018 | Completed final sign-off Apr 2019 | 2807 Bryant St | M & L Construction | replace existing deck and stairs with newDetails
replace existing deck and stairs with new | $15,000 |
| Jan 16, 2018 | Completed final sign-off Jul 2018 | 2275 Market St | Corporate Community Development | new demising partitions to provide existing space with common restroom. remodel restroomDetails
new demising partitions to provide existing space with common restroom. remodel restroom | $15,000 |
| Nov 29, 2017 | Completed final sign-off Jun 2018 | 548 Banks St | revise pa 2017-0216-9536 for replacement of furnace & water heaterDetails
revise pa 2017-0216-9536 for replacement of furnace & water heater | ||
| Nov 14, 2017 | Completed final sign-off Mar 2018 | 2158 Larkin St | rear bldg - remodel existing bedroom, family room & bathroom.Details
rear bldg - remodel existing bedroom, family room & bathroom. | $15,000 | |
| Oct 4, 2017 | Completed final sign-off May 2019 | 917 Alvarado St | Michael C Hargrove Construction | rear addition @ 1st floor. two bedrooms, playroom, bathroom & laundry room. remove & replace (e) interior stair between 1st and 2nd floor. upgrade (e) bathroom and toilet @ 2nd floor with new fixture & finishes. deck addition with new exterior stair to rear yard.Details
rear addition @ 1st floor. two bedrooms, playroom, bathroom & laundry room. remove & replace (e) interior stair between 1st and 2nd floor. upgrade (e) bathroom and toilet @ 2nd floor with new fixture & finishes. deck addition with new exterior stair to rear yard. | $10,000 |
| Sep 13, 2017 | Never finaled issued Aug 2018, no final | 52 Palm Av | (n) roof deck & stair penthouseDetails
(n) roof deck & stair penthouse | $50,000 | |
| Apr 21, 2017 | Completed final sign-off Oct 2018 | 1670 Kirkwood Av | Kadima-Schoepp, Inc | legalize (e) unpermitted dwelling unit under ordinance 43-14.Details
legalize (e) unpermitted dwelling unit under ordinance 43-14. | $4,075 |
| Apr 5, 2017 | Completed final sign-off Sep 2021 | 2025 Ofarrell St | Velero Inc | add unit per ordinance# 162-16. convert (e) rooms into accessory dwelling unit with 1 bedroom & 1 bath.Details
add unit per ordinance# 162-16. convert (e) rooms into accessory dwelling unit with 1 bedroom & 1 bath. | $12,000 |
| Mar 7, 2017 | Completed final sign-off Aug 2020 | 372 Quintara St | legalization of (e) unauthorized dwelling unit under ordinance# 43-14.Details
legalization of (e) unauthorized dwelling unit under ordinance# 43-14. | $8,500 | |
| Feb 16, 2017 | Completed final sign-off Jun 2018 | 548 Banks St | add unit per ordinance no. 162-16, add accessory dwelling unit on ground floor.Details
add unit per ordinance no. 162-16, add accessory dwelling unit on ground floor. | $1,200 | |
| Feb 9, 2017 | Expired or cancelled cancelled Apr 2017 | 1539 Grant Av | to comply nov#201207641 . replacement of (e) windows with new windows. no of windows to be replaced is 32 (20 in front, 10 @ rear, 2 @ light well).Details
to comply nov#201207641 . replacement of (e) windows with new windows. no of windows to be replaced is 32 (20 in front, 10 @ rear, 2 @ light well). | $12,000 | |
| Feb 2, 2017 | Expired or cancelled expired Sep 2019 | 54 Miraloma Dr | Wallace Remodeling Inc. | revision to 201610261199 move laundry & storage roomDetails
revision to 201610261199 move laundry & storage room | |
| Jan 13, 2017 | Completed final sign-off May 2019 | 4 Ankeny St | Culligan Construction | legalization unit @ ground flr per ordinance 43-14. add (2) new class-1 bicycle parking spaces. provide 1-hr rated separation between (n) & (e) units, add bedroom, bathroom & workroom to (e) house.Details
legalization unit @ ground flr per ordinance 43-14. add (2) new class-1 bicycle parking spaces. provide 1-hr rated separation between (n) & (e) units, add bedroom, bathroom & workroom to (e) house. | $25,000 |
| Nov 30, 2016 | Completed final sign-off Oct 2017 | 1802 Mason St | 2nd floor: remodel extg kitchen and bathroom. add closets and doors. new bathroom on 2nd floor.Details
2nd floor: remodel extg kitchen and bathroom. add closets and doors. new bathroom on 2nd floor. | $35,000 | |
| Nov 15, 2016 | Completed final sign-off Mar 2017 | 1938 Scott St | Antonini Construction | revision to app#201605268526. need to alter size and location of full bath and laundry room.Details
revision to app#201605268526. need to alter size and location of full bath and laundry room. | |
| Oct 26, 2016 | Expired or cancelled expired Sep 2019 | 54 Miraloma Dr | Wallace Remodeling Inc. | convert e family room to new bedroom 5. remodel e stairs. replace e window. add new bath 4. add windowDetails
convert e family room to new bedroom 5. remodel e stairs. replace e window. add new bath 4. add window | $50,000 |
| Oct 7, 2016 | Completed final sign-off Jun 2017 | 1940 Scott St | remodel extg workroom to make den and add laundry closet.Details
remodel extg workroom to make den and add laundry closet. | $10,000 | |
| Sep 23, 2016 | Expired or cancelled cancelled Jan 2026 | 2025 Ofarrell St | 1st flr: convert existing rooms down into bedroom, family room & bathroom. space assigned to unit 2.Details
1st flr: convert existing rooms down into bedroom, family room & bathroom. space assigned to unit 2. | $20,000 | |
| Aug 30, 2016 | Never finaled issued Jul 2022, no final | 4547 19th St | add vertical addition @ roof for new master suite with bedroom, bath & roof decks & exit stair.Details
add vertical addition @ roof for new master suite with bedroom, bath & roof decks & exit stair. | $90,000 | |
| Jun 9, 2016 | Expired or cancelled cancelled Feb 2020 | 181 Corbett Av | comply with nov 201498751. legalize 3rd du by adding kitchen per section 207.3 (ord. 43.14) & change occupancy. previous permitted work under pa# 8011064 & #8305024. add fire sprinklers & 1-hr separation between units & garage. ordinance 43-16 (see back for detail).Details
comply with nov 201498751. legalize 3rd du by adding kitchen per section 207.3 (ord. 43.14) & change occupancy. previous permitted work under pa# 8011064 & #8305024. add fire sprinklers & 1-hr separation between units & garage. ordinance 43-16 (see back for detail). | $15,000 | |
| May 26, 2016 | Completed final sign-off Mar 2017 | 1938 Scott St | Antonini Construction | add full room (#3), add mud room, add washer/dryer, new utility room, remodel (e) kitchen, expanding (e) rear bedroom.Details
add full room (#3), add mud room, add washer/dryer, new utility room, remodel (e) kitchen, expanding (e) rear bedroom. | $35,000 |
| May 19, 2016 | Completed final sign-off May 2017 | 14 Macondray Ln | addition of roof deck and spiral stair.Details
addition of roof deck and spiral stair. | $50,000 | |
| Mar 4, 2016 | Completed final sign-off Mar 2024 | 244 30th St | Wolfe Painting Co | legalize existing unauthorized accessory dwelling unit per ordinance 43-14Details
legalize existing unauthorized accessory dwelling unit per ordinance 43-14 | $8,500 |
| Dec 18, 2015 | Completed final sign-off Jan 2017 | 658 Elizabeth St | legalize accessory dwelling unit under ordinance 43-14. automatic sprinkler system at ground floor to be provided under separate permit.Details
legalize accessory dwelling unit under ordinance 43-14. automatic sprinkler system at ground floor to be provided under separate permit. | $10,000 | |
| Sep 18, 2015 | Completed final sign-off Sep 2016 | 1025 Treat Av | to comply w/physical inspection report #cc-7965Details
to comply w/physical inspection report #cc-7965 | $7,500 | |
| Sep 18, 2015 | Completed final sign-off Sep 2016 | 1025 Treat Av | repair and replace existing deck in place, in kind(less than 50%). voluntary installation of floor/ceiling instulation gr fl. voluntary strengthening to fdn walls with anchor bolts and shear plywoodDetails
repair and replace existing deck in place, in kind(less than 50%). voluntary installation of floor/ceiling instulation gr fl. voluntary strengthening to fdn walls with anchor bolts and shear plywood | $7,500 | |
| Jul 10, 2015 | Completed final sign-off Mar 2017 | 53 Douglass St | correct nov 201495141 to remove illegal unit. remove kitchen sink and stove and cap lines. replace interior stairway. enclose laundry closet. install new door. replace front walkway. to comply with his nove #201495141 dated 11/16/2014.Details
correct nov 201495141 to remove illegal unit. remove kitchen sink and stove and cap lines. replace interior stairway. enclose laundry closet. install new door. replace front walkway. to comply with his nove #201495141 dated 11/16/2014. | $7,500 | |
| Jun 18, 2015 | Completed final sign-off Sep 2015 | 658 Elizabeth St | new 8'x8 roof dormer w/ new laundry & closet.Details
new 8'x8 roof dormer w/ new laundry & closet. | $6,500 | |
| May 1, 2015 | Completed final sign-off Jun 2016 | 56 Rockwood Ct | legalization of dwelling units installed without a permit per ordinance no. 43-14; respond to complaint# 201524902 to legalize 2nd dwelling unit under ordinance no# 43-14 to include 1 bedroom & 1 bathroom.Details
legalization of dwelling units installed without a permit per ordinance no. 43-14; respond to complaint# 201524902 to legalize 2nd dwelling unit under ordinance no# 43-14 to include 1 bedroom & 1 bathroom. | $25,000 | |
| Jan 9, 2015 | Completed final sign-off Dec 2023 | 3441 20th St | add 3rd floor (2 apts), remodel basement apts and add 1 apt & 3 parking spaces. (total additions 3 apts.) remodel existing rear stair & add roof deck. sprinkler/alarm deferred.Details
add 3rd floor (2 apts), remodel basement apts and add 1 apt & 3 parking spaces. (total additions 3 apts.) remodel existing rear stair & add roof deck. sprinkler/alarm deferred. | $250,000 | |
| Dec 23, 2014 | Never finaled filed Dec 2014, never issued | 51 Douglass St | comply w/nov#201495141. legalize (e) dwelling unit by installing kitchen & remove (e) stair to upper flat. legalize (e) unpermitted construction in 53a douglass st.Details
comply w/nov#201495141. legalize (e) dwelling unit by installing kitchen & remove (e) stair to upper flat. legalize (e) unpermitted construction in 53a douglass st. | $12,000 | |
| Oct 28, 2014 | Completed final sign-off Mar 2015 | 219 25th Av | to comply with physical inspection report #cc-7304 to retain existing use as storage and remove non conforming unit at first floor, repair existing stair at south light court < 50%, provide structural connections at rear structure, add smoke and co detectorsDetails
to comply with physical inspection report #cc-7304 to retain existing use as storage and remove non conforming unit at first floor, repair existing stair at south light court < 50%, provide structural connections at rear structure, add smoke and co detectors | $10,000 | |
| Oct 14, 2014 | Completed final sign-off Oct 2014 | 218 Mallorca Wy | revise permit application #: 2014-0818-4095. to add (n) wall between garage and storage.Details
revise permit application #: 2014-0818-4095. to add (n) wall between garage and storage. | ||
| Sep 10, 2014 | Never finaled issued May 2016, no final | 1356 Chestnut St | horizontal addition to ground floor rear of sgl. fam. condo unit w/new bedroom & bathroom & enlargement of (e) living dining & remodel (e) kitchen. add new entry, laundry. remodel (e) heating system.Details
horizontal addition to ground floor rear of sgl. fam. condo unit w/new bedroom & bathroom & enlargement of (e) living dining & remodel (e) kitchen. add new entry, laundry. remodel (e) heating system. | $45,000 | |
| Sep 10, 2014 | Completed final sign-off Jan 2015 | 154 Dolores St | for administrative purposes to establish authorized use & occupany a 2 family dwelling per assessor's property card, sanborn maps, water dept record, housing inspection records & field verification by senior bldg inspector.Details
for administrative purposes to establish authorized use & occupany a 2 family dwelling per assessor's property card, sanborn maps, water dept record, housing inspection records & field verification by senior bldg inspector. | ||
| Aug 19, 2014 | Completed final sign-off Jan 2016 | 379 Lisbon St | revise app#201406198871 to legalize dwelling unit installed without permit under ordinance no 43-14Details
revise app#201406198871 to legalize dwelling unit installed without permit under ordinance no 43-14 | ||
| Aug 18, 2014 | Completed final sign-off Oct 2014 | 218 Mallorca Wy | to comply with nov 201477931 remove existing wall and spiral stair at gr fl installed without a permitDetails
to comply with nov 201477931 remove existing wall and spiral stair at gr fl installed without a permit | $10,000 | |
| Aug 15, 2014 | Completed final sign-off Jun 2016 | 1057 Lombard St | North Point Construction | remodel existing kitchen, replace tub with stall shower, remodel existing dressing room and laundry. no structural workDetails
remodel existing kitchen, replace tub with stall shower, remodel existing dressing room and laundry. no structural work | $50,000 |
| Jul 14, 2014 | Expired or cancelled cancelled Jan 2018 | 218 Mallorca Wy | to comply with nov. appl 201477931 and legalize existing as built conditions of room and spiral stair. maher n/a.Details
to comply with nov. appl 201477931 and legalize existing as built conditions of room and spiral stair. maher n/a. | $7,500 | |
| Jun 30, 2014 | Completed final sign-off Jun 2015 | 4448 Mission St | Rivera Builders | new tenant remodel existing deli - provide new accessible restroom & enlarge serving area.Details
new tenant remodel existing deli - provide new accessible restroom & enlarge serving area. | $25,000 |
| Jun 19, 2014 | Completed final sign-off Jan 2016 | 379 Lisbon St | legalize existing as-built conditions to comply w/nov 201447813 & 201449161 - new rec. room, bedroom, bath & laundry on ground floorDetails
legalize existing as-built conditions to comply w/nov 201447813 & 201449161 - new rec. room, bedroom, bath & laundry on ground floor | $10,000 | |
| Dec 5, 2013 | Completed final sign-off Aug 2014 | 163 Avila St | Dennis Webb Construction | remodel existing family room & bathroom. add new bedroom & half bath & hallway, replace windows & heating system. no windows to be replaced on front facade.Details
remodel existing family room & bathroom. add new bedroom & half bath & hallway, replace windows & heating system. no windows to be replaced on front facade. | $50,000 |
| Oct 22, 2013 | Never finaled issued Nov 2016, no final | 1804 Mason St | construct roof deck w/ windscreen & guardrails & stair to unit below.Details
construct roof deck w/ windscreen & guardrails & stair to unit below. | $25,000 | |
| Apr 19, 2013 | Completed final sign-off Jun 2013 | 1938 Scott St | revise scope of work under existing permit pa#2012-0625-3297-eliminate mud room, powder room, laundry room & heating systemDetails
revise scope of work under existing permit pa#2012-0625-3297-eliminate mud room, powder room, laundry room & heating system | ||
| Jan 11, 2012 | Never finaled issued Jan 2012, no final | 850 Van Ness Av | L M Construction Co Inc | remodel existing guardrails and mezzanine. upgrade accessibility.Details
remodel existing guardrails and mezzanine. upgrade accessibility. | $4,000 |
| Dec 23, 2011 | Expired or cancelled disapproved Dec 2018 | 585 Marina Bl | add horizontal addition @ 1st floor rear. add breakfast area addition to 2nd floor rear. add vertical addition @ 4th floor w/ deck @ front. remodel interiors. add elevator.Details
add horizontal addition @ 1st floor rear. add breakfast area addition to 2nd floor rear. add vertical addition @ 4th floor w/ deck @ front. remodel interiors. add elevator. | $250,000 | |
| Sep 12, 2011 | Completed final sign-off Jan 2012 | 281 States St | revise 201105025143 to legalize e bath rooms down for unit 283 and add connecting stair to 2nd fl to comply with physical inspection reprot cc5783Details
revise 201105025143 to legalize e bath rooms down for unit 283 and add connecting stair to 2nd fl to comply with physical inspection reprot cc5783 | ||
| Jul 27, 2011 | Completed final sign-off Oct 2011 | 850 Van Ness Av | L M Construction Co Inc | rehab existing mezzanine floor and stair handrails. remove wall around stairway. upgrade accessibility to restroomDetails
rehab existing mezzanine floor and stair handrails. remove wall around stairway. upgrade accessibility to restroom | $10,000 |
| Jul 11, 2011 | Completed final sign-off Jul 2011 | 49 Liberty St | administrative permit to correct public records to show legal use as four dwelling units where records state six units, and to issue certificate of occupancy as four units, and correct & issue new 3-r report showing four units. note: 1982 lot split did not update actual number of units for this bldgDetails
administrative permit to correct public records to show legal use as four dwelling units where records state six units, and to issue certificate of occupancy as four units, and correct & issue new 3-r report showing four units. note: 1982 lot split did not update actual number of units for this bldg | ||
| May 2, 2011 | Completed final sign-off Jan 2012 | 281 States St | unit #283 - legalize extg bath and kitchen. to comply with physical inspection report #cc-5783Details
unit #283 - legalize extg bath and kitchen. to comply with physical inspection report #cc-5783 | $10,000 | |
| May 3, 2010 | Completed final sign-off May 2010 | 1170 South Van Ness Av | rev. to pa# 2010.04.06.9724. corrections on 1st floor, 2nd fl, and 3rd fl plans to reflect (e) conditions in filed including (e) windows , doors and closets. no work done.Details
rev. to pa# 2010.04.06.9724. corrections on 1st floor, 2nd fl, and 3rd fl plans to reflect (e) conditions in filed including (e) windows , doors and closets. no work done. | ||
| Jun 5, 2009 | Completed final sign-off Jul 2010 | 1827 Union St | new structural tenant improvements to install new restroom, dressing rooms & finishes. no change to existing business name or use.Details
new structural tenant improvements to install new restroom, dressing rooms & finishes. no change to existing business name or use. | $35,000 | |
| Jul 18, 2008 | Completed final sign-off Dec 2008 | 1346 Polk St | Lindsay & Wilson Construction Services I | tenant improvements to provide new accessible restrooms. demo (e) improvements, provide new finishes, demo mezzanine and stairsDetails
tenant improvements to provide new accessible restrooms. demo (e) improvements, provide new finishes, demo mezzanine and stairs | $25,000 |
| Aug 9, 2007 | Expired or cancelled expired Nov 2009 | 656 Elizabeth St | rear deck replacement in - kind w/ rear steel frame addition for structural improvement.Details
rear deck replacement in - kind w/ rear steel frame addition for structural improvement. | $25,000 | |
| May 24, 2007 | Completed final sign-off Jul 2007 | 1262 Plymouth Av | H M W Development Inc | per nov# 200703772 replace driveway & front yard with new concrete. (legalize work of 12' x 20') remove concrete in front set back.Details
per nov# 200703772 replace driveway & front yard with new concrete. (legalize work of 12' x 20') remove concrete in front set back. | $750 |
| Feb 15, 2007 | Expired or cancelled expired Oct 2007 | 990 Geary St | revise permit applications: 200007135063, 200704050417, 200603066033, 200603063061 &200701242485 for minor changes to floor plan arrangement of rooms revision and clouded on plans.Details
revise permit applications: 200007135063, 200704050417, 200603066033, 200603063061 &200701242485 for minor changes to floor plan arrangement of rooms revision and clouded on plans. | ||
| Jan 10, 2007 | Completed final sign-off Oct 2007 | 3880 Sacramento St | revise current permit app#200606053233 to eliminate work on o upper floor and reinforce (e) fireplace at foundation only.Details
revise current permit app#200606053233 to eliminate work on o upper floor and reinforce (e) fireplace at foundation only. | ||
| Mar 6, 2006 | Expired or cancelled expired Oct 2007 | 990 Geary St | revise permit applications #200007135063/200404050417 for minor changes to floor plan arrangement of rooms/add new toilet in apt 007 and remodel in apt 001 and eliminate stairs in apt 101/revisions are clouded on plansDetails
revise permit applications #200007135063/200404050417 for minor changes to floor plan arrangement of rooms/add new toilet in apt 007 and remodel in apt 001 and eliminate stairs in apt 101/revisions are clouded on plans |