Anthony Pantaleoni
- Listed as
- architect
- Firm
- Kotas Pantaleoni Arch.
- Based in
- Sf
- On San Francisco permits
- Jan 2005 to Nov 2025
9 permits since 2000 (architect on 9 permits): 6 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 25, 2025 | Expired or cancelled suspend Dec 2025 | 850 Corbett Av | unit#2: correct nov#202546349, legalize an (e) 7'7" tall wood fence at the rear terrace at the 1st floor.fence lenght 13' 6"Details
unit#2: correct nov#202546349, legalize an (e) 7'7" tall wood fence at the rear terrace at the 1st floor.fence lenght 13' 6" | $1,750 | |
| Nov 25, 2025 | Expired or cancelled suspend Dec 2025 | 850 Corbett Av | unit#1: correct nov #202545537 & #202545865, legalize an existing 7'7" tsll wood fence at the rear terraces at the 1st floor. correcting unpermitted electrical lighting installed in common areas. fence lenght 13' 6"Details
unit#1: correct nov #202545537 & #202545865, legalize an existing 7'7" tsll wood fence at the rear terraces at the 1st floor. correcting unpermitted electrical lighting installed in common areas. fence lenght 13' 6" | $1,750 | |
| Aug 6, 2024 | Expired or cancelled expired May 2026 | 95 Nordhoff St | E. Grelli Construction | revision to pa# 201811145858, structural upgrades necessary for rebuilding existing front exterior stairs. rebuild in-kind. install new pre-manufactured metal & glass awning over front door.Details
revision to pa# 201811145858, structural upgrades necessary for rebuilding existing front exterior stairs. rebuild in-kind. install new pre-manufactured metal & glass awning over front door. | $15,000 |
| Nov 7, 2017 | Completed final sign-off Jan 2018 | 364 Page St | Sure, Inc. | interior remodel of 1st fl studio unit 2. relocate existing kitchen to create 1 bedroom. no structural work or window alteration. plumbing and elec work to be performedDetails
interior remodel of 1st fl studio unit 2. relocate existing kitchen to create 1 bedroom. no structural work or window alteration. plumbing and elec work to be performed | $30,000 |
| Jul 28, 2017 | Completed final sign-off Nov 2024 | 1168 Clay St | 1st floor - interior remodel of kitchen, living room, dining room, master bedroom & master bathroom, add 1/2 bath.Details
1st floor - interior remodel of kitchen, living room, dining room, master bedroom & master bathroom, add 1/2 bath. | $90,000 | |
| Mar 10, 2006 | Completed final sign-off Mar 2009 | 899 North Point St | bldg #b - to erect 4 stories, 3 family condominium units building.Details
bldg #b - to erect 4 stories, 3 family condominium units building. | $600,000 | |
| Mar 10, 2006 | Completed final sign-off Mar 2009 | 889 North Point St | to erect 4 stories, 3 family condominium units building.Details
to erect 4 stories, 3 family condominium units building. | $600,000 | |
| May 9, 2005 | Completed final sign-off May 2005 | 51 Vicksburg St | revision to app #200111022416 s1/scope of revision reduces originally approved scope of workDetails
revision to app #200111022416 s1/scope of revision reduces originally approved scope of work | ||
| Jan 28, 2005 | Completed final sign-off Aug 2005 | 1 Arkansas St | build out of non-rated partitions,ada bathroom & new storefront entrance in (e)opening on g/f.Details
build out of non-rated partitions,ada bathroom & new storefront entrance in (e)opening on g/f. | $53,000 |