Kevin Moore
- License
- S4528
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S4528 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Simpson, Gumphertz, Heger
- Based in
- Oakland
- On San Francisco permits
- Sep 2021 to Aug 2022
2 permits since 2000 (engineer on 2 permits): 1 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Nor-Cal Scaffolding Inc., Rainbow Waterproofing & Restor, Sullivan / Thompson Masonry & Restoratio
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 25, 2022 | Completed final sign-off Dec 2023 | 343 Sansome St | Rainbow Waterproofing & Restor | exterior: reconstruction & repairs of the southwest corner of the brick masonary on the facade. floors 3-5 of the corner are to be reinforced to prevent masonry cracking.floors 6-8 completel removed and replaced with new brick masonary & mortar.new steel shelf angles will be welded in place on 6-8/fDetails
exterior: reconstruction & repairs of the southwest corner of the brick masonary on the facade. floors 3-5 of the corner are to be reinforced to prevent masonry cracking.floors 6-8 completel removed and replaced with new brick masonary & mortar.new steel shelf angles will be welded in place on 6-8/f | $508,496 |
| Sep 10, 2021 | Never finaled issued Feb 2022, no final | 57 Post St | Nor-Cal Scaffolding Inc., Sullivan / Thompson Masonry & Restoratio | in-kind facade masonry repairs of east elevation of historic mechanics institute. full assessment of necessary repair extents via scaffold removal of loose materials, followed by in-kind repair of deteriorated plaster parge coat,loose bride tie backs and lintels. e windows painted in place.Details
in-kind facade masonry repairs of east elevation of historic mechanics institute. full assessment of necessary repair extents via scaffold removal of loose materials, followed by in-kind repair of deteriorated plaster parge coat,loose bride tie backs and lintels. e windows painted in place. | $750,000 |