Kevin Kramer
- License
- C54780
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C54780 at the Board for Professional Engineers
- Listed as
- architect, authorized agent-others, engineer
- Firm
- K K Engineering
- On San Francisco permits
- Dec 2001 to Dec 2025
13 permits since 2000 (engineer on 9 permits, architect on 3 permits, authorized agent-others on 1 permit): 12 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Bill Walsh Construction, Brendan Lalor Construction, Fog Horn Builders Inc, James O'neill Construction, Mc Cormick Construction, Swanson Construction
Where they worked
- Single-family 8
- Multi-family (2-family, apartments) 4
- Commercial 0
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 18, 2025 | Completed final sign-off Apr 2026 | 520 Monterey Bl | Brendan Lalor Construction | remove wall between kitchen and living room to install new beam. remodel kitchen and bath in like kind. replace 8 window with milgard vinyl rear and lightwell, max u factor 0.3 for all windows.Details
remove wall between kitchen and living room to install new beam. remodel kitchen and bath in like kind. replace 8 window with milgard vinyl rear and lightwell, max u factor 0.3 for all windows. | $60,000 |
| Aug 28, 2025 | In progress filed Aug 2025, not yet issued | 2519 47th Av | comply with nov 202423676: construction of deck on rear of house deck to be less than 10 feet above grade and meet all planning setback.Details
comply with nov 202423676: construction of deck on rear of house deck to be less than 10 feet above grade and meet all planning setback. | $5,000 | |
| Jan 16, 2024 | Completed final sign-off Jan 2024 | 305 Arlington St | James O'neill Construction | revision to pa 202312082208 replace in kind dryrot over 50%. comply with nov 202315857 item #2 nov for requiree means of egress.Details
revision to pa 202312082208 replace in kind dryrot over 50%. comply with nov 202315857 item #2 nov for requiree means of egress. | $1,000 |
| Apr 20, 2022 | Completed final sign-off Sep 2022 | 17 Montcalm St | to comply with nov# 202052642. obtain permit for previously built ground level deck and replace railing to code. one hour fire rated wall at property lineDetails
to comply with nov# 202052642. obtain permit for previously built ground level deck and replace railing to code. one hour fire rated wall at property line | $2,500 | |
| May 20, 2016 | Completed final sign-off Jul 2016 | 4601 25th St | Mc Cormick Construction | #4 - 3rd floor - add 2 x 10 pt joists at balcony, partial sheetrock interior ceiling.Details
#4 - 3rd floor - add 2 x 10 pt joists at balcony, partial sheetrock interior ceiling. | $2,900 |
| Aug 29, 2014 | Completed final sign-off Feb 2015 | 19 Lopez Av | revision to appl #2014.0718.1648 - demo entry stair & replace in kind.Details
revision to appl #2014.0718.1648 - demo entry stair & replace in kind. | ||
| Mar 21, 2012 | Completed final sign-off May 2012 | 1351 Polk St | Swanson Construction | revision to appl #2012.01.04.1705 - milden damaged sheetrock replaced, bar floors resurfaced, bar counter repaired per health code violatios #3,4,5 on report.Details
revision to appl #2012.01.04.1705 - milden damaged sheetrock replaced, bar floors resurfaced, bar counter repaired per health code violatios #3,4,5 on report. | $2,000 |
| Oct 15, 2010 | Completed final sign-off Oct 2011 | 2380 16th Av | demo center patio. ren0vate kitchen.Details
demo center patio. ren0vate kitchen. | $25,000 | |
| Sep 23, 2009 | Completed final sign-off Feb 2010 | 2666 15th Av | Bill Walsh Construction | remove existing post in rear of 1st floor. replace with new beam, posts, and footings. no other changesDetails
remove existing post in rear of 1st floor. replace with new beam, posts, and footings. no other changes | $18,000 |
| Aug 18, 2006 | Completed final sign-off Sep 2006 | 180 Haight St | upgrade foundation with curb wallattached to (e) brick foundation. rear of building and left side.Details
upgrade foundation with curb wallattached to (e) brick foundation. rear of building and left side. | $10,000 | |
| Feb 13, 2006 | Completed final sign-off May 2006 | 2522 17th Av | Fog Horn Builders Inc | renforce concrete reaining wall. upgrade in kind at rear of yard. 22' wide, max height 6'. e retaining wall to remainDetails
renforce concrete reaining wall. upgrade in kind at rear of yard. 22' wide, max height 6'. e retaining wall to remain | $5,000 |
| Dec 10, 2004 | Completed final sign-off Feb 2005 | 454 Point Lobos Av | legalize deck and retaining wallsDetails
legalize deck and retaining walls | $8,000 | |
| Dec 26, 2001 | Completed final sign-off Feb 2003 | 1515 18th Av | deck and staircase additionDetails
deck and staircase addition | $1,600 |