Permit GraphShortlistSan Francisco building permits since 2000

Block 0852, lot 010

180 Haight St

The city’s assessor roll has no record for this parcel.

Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

13 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Mar 10, 2014Completed
final sign-off Apr 2014
180 Haight StMartin Paul Duggan Contractingto comply with physical inspection report # cc-7518
Details
Permit
201403100309
Status
complete
Filed
Mar 10, 2014
Permit issued
Mar 10, 2014
Final sign-off
Apr 22, 2014
Declared cost
$4,000
Address
180 Haight St

to comply with physical inspection report # cc-7518

Open the permit page

$4,000
Sep 17, 2013Completed
final sign-off Feb 2014
184 Haight Stremodel kitchen and bath in kind.
Details
Permit
201309176996
Status
complete
Filed
Sep 17, 2013
Permit issued
Sep 17, 2013
Final sign-off
Feb 3, 2014
Declared cost
$8,000
Address
184 Haight St

remodel kitchen and bath in kind.

Open the permit page

$8,000
Nov 15, 2010Completed
final sign-off Nov 2010
180 Haight StHighland Construction S F Inc.reroofing
Details
Permit
201011154913
Status
complete
Filed
Nov 15, 2010
Permit issued
Nov 17, 2010
Final sign-off
Nov 19, 2010
Declared cost
$8,650
Address
180 Haight St

reroofing

Open the permit page

$8,650
Nov 6, 2009Expired or cancelled
withdrawn Sep 2013
184 Haight Stadding master bathroom, moving storage room, adding pantry and making main bath smaller
Details
Permit
200911060760
Status
withdrawn
Filed
Nov 6, 2009
Declared cost
$45,000
Address
184 Haight St

adding master bathroom, moving storage room, adding pantry and making main bath smaller

Open the permit page

$45,000
Jun 27, 2008Never finaled
issued Jun 2008, no final
180 Haight Stsidewalk permit
Details
Permit
M124109
Status
issued
Filed
Jun 27, 2008
Permit issued
Jun 27, 2008
Address
180 Haight St

sidewalk permit

Open the permit page

Jun 12, 2008Never finaled
issued Jun 2008, no final
180 Haight Ststreet space & sidewalk
Details
Permit
M122487
Status
issued
Filed
Jun 12, 2008
Permit issued
Jun 12, 2008
Address
180 Haight St

street space & sidewalk

Open the permit page

Aug 18, 2006Completed
final sign-off Sep 2006
180 Haight Stupgrade foundation with curb wallattached to (e) brick foundation. rear of building and left side.
Details
Permit
200608189873
Status
complete
Filed
Aug 18, 2006
Permit issued
Aug 18, 2006
Final sign-off
Sep 20, 2006
Declared cost
$10,000
Address
180 Haight St

upgrade foundation with curb wallattached to (e) brick foundation. rear of building and left side.

Open the permit page

$10,000
Mar 16, 2006Completed
final sign-off Nov 2006
180 Haight Stincrease cost of work by $150,000.00 under application #200601273243.
Details
Permit
200603166804
Status
complete
Filed
Mar 16, 2006
Permit issued
Mar 16, 2006
Final sign-off
Nov 30, 2006
Declared cost
$150,000
Address
180 Haight St

increase cost of work by $150,000.00 under application #200601273243.

Open the permit page

$150,000
Mar 16, 2006Completed
final sign-off Sep 2006
180 Haight Streplace master bathroom windows to 180 & 182 haught st. (total of 2 property line windows in same location, same size, in kind)
Details
Permit
200603166799
Status
complete
Filed
Mar 16, 2006
Permit issued
Mar 16, 2006
Final sign-off
Sep 20, 2006
Declared cost
$1,000
Address
180 Haight St

replace master bathroom windows to 180 & 182 haught st. (total of 2 property line windows in same location, same size, in kind)

Open the permit page

$1,000
Jan 27, 2006Completed
final sign-off Sep 2006
180 Haight Stremodel extg kchn and new bathroom at 2nd floor/relocate extg kchn per plan remodel extg bath room and new bathroom/change extg kchn room to new bed room/new skylight at extg bath and kchn room per plan
Details
Permit
200601273243
Status
complete
Filed
Jan 27, 2006
Permit issued
Jan 27, 2006
Final sign-off
Sep 20, 2006
Declared cost
$50,000
Address
180 Haight St

remodel extg kchn and new bathroom at 2nd floor/relocate extg kchn per plan remodel extg bath room and new bathroom/change extg kchn room to new bed room/new skylight at extg bath and kchn room per plan

Open the permit page

$50,000
Oct 7, 2004Completed
final sign-off Nov 2004
180 Haight Strepair and/or replace dry rotted floor joists for existing deck this is a revision to pa 20040415143
Details
Permit
200410076286
Status
complete
Filed
Oct 7, 2004
Permit issued
Oct 7, 2004
Final sign-off
Nov 15, 2004
Declared cost
$500
Address
180 Haight St

repair and/or replace dry rotted floor joists for existing deck this is a revision to pa 20040415143

Open the permit page

$500
Apr 15, 2004Completed
final sign-off Oct 2004
180 Haight Stremove enclosure of rear deck to abate nov 200230084
Details
Permit
200404151437
Status
complete
Filed
Apr 15, 2004
Permit issued
Jun 1, 2004
Final sign-off
Oct 18, 2004
Declared cost
$1,000
Address
180 Haight St

remove enclosure of rear deck to abate nov 200230084

Open the permit page

$1,000
Aug 16, 2002Completed
final sign-off Dec 2002
180 Haight Stinstall handrail on top half of rear stairway located 34"-38" above tread nosing.repair front stairs
Details
Permit
200208164242
Status
complete
Filed
Aug 16, 2002
Permit issued
Aug 16, 2002
Final sign-off
Dec 5, 2002
Declared cost
$2,100
Address
180 Haight St

install handrail on top half of rear stairway located 34"-38" above tread nosing.repair front stairs

Open the permit page

$2,100

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Highland Construction S F Inc., Martin Paul Duggan Contracting
Architects
Kevin Kramer

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.