Karl Shultz
- Listed as
- architect, authorized agent-others, designer
- Firm
- Shultz & Associates
- Based in
- Fremont
- On San Francisco permits
- Jul 2004 to Mar 2022
18 permits since 2000 (architect on 17 permits, authorized agent-others on 1 permit, designer on 1 permit): 14 completed, 1 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 17, 2022 | Completed final sign-off Apr 2023 | 1600 18th St | Tradequip Corporation | interior t.i. including accessible restroom, non bearing walls, lighting, hvac system ductwork, electrical outlets, four dental chairs. does not include medical gas.Details
interior t.i. including accessible restroom, non bearing walls, lighting, hvac system ductwork, electrical outlets, four dental chairs. does not include medical gas. | $200,000 |
| Sep 28, 2021 | Completed final sign-off May 2023 | 2656 Mission St | Olive Remodeling | revised floor plan, plumbing & mechanical sheets. revision to bpa #202012161089: extend break room to back of building. remove lab #122 & relocate mech room #123 to area adjacent to stairs.Details
revised floor plan, plumbing & mechanical sheets. revision to bpa #202012161089: extend break room to back of building. remove lab #122 & relocate mech room #123 to area adjacent to stairs. | |
| Jun 22, 2021 | Completed final sign-off Dec 2022 | 1185 Vicente St | D B I Contracting Inc | tenant improvement of new dental office on the 1st fl. new non-load bearing partiton walls construcion with new lighting vacuum water, power linesDetails
tenant improvement of new dental office on the 1st fl. new non-load bearing partiton walls construcion with new lighting vacuum water, power lines | $283,350 |
| Dec 16, 2020 | Completed final sign-off May 2023 | 2656 Mission St | J.L. Construction Company, Olive Remodeling | vacant ground floor commercial retail to be a new dental office. improvements include new restroom, non-bearing walls, plumbing, electrical & hvac ductwork from existing roof top units. change of use from m-retail to b-dental office.Details
vacant ground floor commercial retail to be a new dental office. improvements include new restroom, non-bearing walls, plumbing, electrical & hvac ductwork from existing roof top units. change of use from m-retail to b-dental office. | $350,000 |
| Sep 25, 2020 | Completed final sign-off Nov 2021 | 1545 Pine St | Patrick Uniacke | unit #109: interior improvements for new surgery center. work includes lighting, non-bearing & bearing walls, mechanical, electrical, and plumbing work, medical gas plumbing & scavenger venting system. existing building accessibility is up to current access codes.Details
unit #109: interior improvements for new surgery center. work includes lighting, non-bearing & bearing walls, mechanical, electrical, and plumbing work, medical gas plumbing & scavenger venting system. existing building accessibility is up to current access codes. | $138,000 |
| Sep 1, 2020 | Completed final sign-off Oct 2021 | 1545 Pine St | Patrick Uniacke | #108: interior improvement for new office with breakroom & restroom. work includes electrical for lighting, plumbing, mechanical for new vay and interior finishes. accessibility up to current code.Details
#108: interior improvement for new office with breakroom & restroom. work includes electrical for lighting, plumbing, mechanical for new vay and interior finishes. accessibility up to current code. | $60,000 |
| Aug 23, 2019 | Completed final sign-off Oct 2020 | 1130 Folsom St | Cogent Construction & Consulting Inc | interior improvements with in a suite non bearing walls, accessible restroom, 4 dental treatment rooms, supporting roomd, hvac, plm, ele work from (e) ele panelDetails
interior improvements with in a suite non bearing walls, accessible restroom, 4 dental treatment rooms, supporting roomd, hvac, plm, ele work from (e) ele panel | $251,550 |
| Dec 3, 2018 | Expired or cancelled withdrawn May 2019 | 2450 Taraval St | new orthodontics office ti (e) grnd flr retail space of mixed use bld. demo (e) non load bearing wall construction new non load bearing walls. install power, water drain, vaccum lines to locations shown. provide new susp t-par clg & lighting provide new floor & wall finishesDetails
new orthodontics office ti (e) grnd flr retail space of mixed use bld. demo (e) non load bearing wall construction new non load bearing walls. install power, water drain, vaccum lines to locations shown. provide new susp t-par clg & lighting provide new floor & wall finishes | $90,000 | |
| Feb 20, 2018 | Completed final sign-off Mar 2019 | 1355 03rd St | San Francisco Commercial Builders Inc | new dental office ti @ ground fl retail space of mixed use bldg: install new conc floor over metal deck; new partition walls, fixtures, finishes, mep. fire protection under sep permit. maher naDetails
new dental office ti @ ground fl retail space of mixed use bldg: install new conc floor over metal deck; new partition walls, fixtures, finishes, mep. fire protection under sep permit. maher na | $185,000 |
| Nov 29, 2016 | Expired or cancelled cancelled Jan 2026 | 324 Clement St | lighting, counter, restroom upgrade. remove non bearing walls, new rooms. mechanical system duct work. new storefront doorDetails
lighting, counter, restroom upgrade. remove non bearing walls, new rooms. mechanical system duct work. new storefront door | $70,000 | |
| Nov 10, 2016 | Never finaled issued Mar 2018, no final | 324 Clement St | Sonomarin Inc | chg of use from retail to service restaurant, demo wall, build new metal stud walls. install 5 new sinks, install new 200 amp panel, install 20 new outlets, install cabinets, new lighting, new water heater, new mechanical system duct, furnaceDetails
chg of use from retail to service restaurant, demo wall, build new metal stud walls. install 5 new sinks, install new 200 amp panel, install 20 new outlets, install cabinets, new lighting, new water heater, new mechanical system duct, furnace | $70,000 |
| May 11, 2015 | Completed final sign-off Jan 2016 | 3251 20th Av | Sonomarin Inc | construction of beverage kiosk within stonestown mall (plumbing & electrical to the location to be provided by landlord under separate permit)- install kiosk structure, plumb, elect, outlets & finishes. plumb. and elect to location under sep permit.Details
construction of beverage kiosk within stonestown mall (plumbing & electrical to the location to be provided by landlord under separate permit)- install kiosk structure, plumb, elect, outlets & finishes. plumb. and elect to location under sep permit. | $35,000 |
| Mar 8, 2012 | Completed final sign-off Jul 2012 | 135 04th St | space #fc-10 - remodel a space in metreon food court to become a filipino food kitchen. hood & duct fire suppression system separate permit.Details
space #fc-10 - remodel a space in metreon food court to become a filipino food kitchen. hood & duct fire suppression system separate permit. | $160,000 | |
| Aug 1, 2006 | Completed final sign-off Mar 2007 | 500 Howard St | 1st floor, unit #101 - new dental office in ground floor suite. work includes non-bearing walls, electrical, plumbing & mechanical work for 1 accessible bathroom 4 dental chairs and realated service areas.Details
1st floor, unit #101 - new dental office in ground floor suite. work includes non-bearing walls, electrical, plumbing & mechanical work for 1 accessible bathroom 4 dental chairs and realated service areas. | $120,000 | |
| Apr 24, 2006 | Completed final sign-off Dec 2006 | 3012 Steiner St | New West Construction Co**See Note** | switching the exam rcom with the steric room. create meogac gas storage. replace (e) wood floor framing with new. revision to pa# 2004/11/10/8970.Details
switching the exam rcom with the steric room. create meogac gas storage. replace (e) wood floor framing with new. revision to pa# 2004/11/10/8970. | $10,000 |
| Dec 1, 2004 | Completed final sign-off Jun 2006 | 786 Haight St | remodel g/f medical office to become dental officeDetails
remodel g/f medical office to become dental office | $80,000 | |
| Jul 28, 2004 | Expired or cancelled expired Aug 2006 | 691 Marina Bl | Robert B Lewis Const. | add new 3 stop elev,add 150sf living space on 2nd fl for hallway to reach (n) elev,(n) powder room&.Details
add new 3 stop elev,add 150sf living space on 2nd fl for hallway to reach (n) elev,(n) powder room&. | $175,000 |
| Jul 22, 2004 | Completed final sign-off Apr 2005 | 3995 Alemany Bl | Westridge Builders, Inc. | construct non-load bearing partitions/install power water drain vaccum lines to location indicatedDetails
construct non-load bearing partitions/install power water drain vaccum lines to location indicated | $80,000 |