Permit GraphShortlistSan Francisco building permits since 2000

Karl Shultz

License
C13762
Architect
About the California Architects Board
Look the license up with the state (Architects Board)
Listed as
architect, authorized agent-others, designer
Firm
Shultz & Associates
Based in
Fremont
On San Francisco permits
Jul 2004 to Mar 2022

18 permits since 2000 (architect on 17 permits, authorized agent-others on 1 permit, designer on 1 permit): 14 completed, 4 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Olive Remodeling (2), Patrick Uniacke (2), Sonomarin Inc (2), Cogent Construction & Consulting Inc, D B I Contracting Inc, J.L. Construction Company, New West Construction Co**See Note**, Robert Lewis Construction Inc, San Francisco Commercial Builders Inc, Tradequip Corporation, Westridge Builders, Inc.
Authorized agents
Tony Fong

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Mar 17, 2022Completed
final sign-off Apr 2023
1600 18th StTradequip Corporationinterior t.i. including accessible restroom, non bearing walls, lighting, hvac system ductwork, electrical outlets, four dental chairs. does not include medical gas.
Details
Permit
202203170250
Permit issued
Apr 15, 2022
Final sign-off
Apr 19, 2023

interior t.i. including accessible restroom, non bearing walls, lighting, hvac system ductwork, electrical outlets, four dental chairs. does not include medical gas.

Open the permit page

$200,000
Sep 28, 2021Completed
final sign-off May 2023
2656 Mission StOlive Remodelingrevised floor plan, plumbing & mechanical sheets. revision to bpa #202012161089: extend break room to back of building. remove lab #122 & relocate mech room #123 to area adjacent to stairs.
Details
Permit
202109289345
Permit issued
Dec 24, 2021
Final sign-off
May 2, 2023

revised floor plan, plumbing & mechanical sheets. revision to bpa #202012161089: extend break room to back of building. remove lab #122 & relocate mech room #123 to area adjacent to stairs.

Open the permit page

Jun 22, 2021Completed
final sign-off Dec 2022
1185 Vicente StD B I Contracting Inctenant improvement of new dental office on the 1st fl. new non-load bearing partiton walls construcion with new lighting vacuum water, power lines
Details
Permit
202106222997
Permit issued
Sep 2, 2021
Final sign-off
Dec 7, 2022

tenant improvement of new dental office on the 1st fl. new non-load bearing partiton walls construcion with new lighting vacuum water, power lines

Open the permit page

$283,350
Dec 16, 2020Completed
final sign-off May 2023
2656 Mission StJ.L. Construction Company, Olive Remodelingvacant ground floor commercial retail to be a new dental office. improvements include new restroom, non-bearing walls, plumbing, electrical & hvac ductwork from existing roof top units. change of use from m-retail to b-dental office.
Details
Permit
202012161089
Permit issued
Apr 6, 2021
Final sign-off
May 2, 2023

vacant ground floor commercial retail to be a new dental office. improvements include new restroom, non-bearing walls, plumbing, electrical & hvac ductwork from existing roof top units. change of use from m-retail to b-dental office.

Open the permit page

$350,000
Sep 25, 2020Completed
final sign-off Nov 2021
1545 Pine StPatrick Uniackeunit #109: interior improvements for new surgery center. work includes lighting, non-bearing & bearing walls, mechanical, electrical, and plumbing work, medical gas plumbing & scavenger venting system. existing building accessibility is up to current access codes.
Details
Permit
202009255013
Permit issued
Mar 17, 2021
Final sign-off
Nov 10, 2021

unit #109: interior improvements for new surgery center. work includes lighting, non-bearing & bearing walls, mechanical, electrical, and plumbing work, medical gas plumbing & scavenger venting system. existing building accessibility is up to current access codes.

Open the permit page

$138,000
Sep 1, 2020Completed
final sign-off Oct 2021
1545 Pine StPatrick Uniacke#108: interior improvement for new office with breakroom & restroom. work includes electrical for lighting, plumbing, mechanical for new vay and interior finishes. accessibility up to current code.
Details
Permit
202009013154
Permit issued
Dec 21, 2020
Final sign-off
Oct 7, 2021

#108: interior improvement for new office with breakroom & restroom. work includes electrical for lighting, plumbing, mechanical for new vay and interior finishes. accessibility up to current code.

Open the permit page

$60,000
Aug 23, 2019Completed
final sign-off Oct 2020
1130 Folsom StCogent Construction & Consulting Incinterior improvements with in a suite non bearing walls, accessible restroom, 4 dental treatment rooms, supporting roomd, hvac, plm, ele work from (e) ele panel
Details
Permit
201908239675
Permit issued
Aug 27, 2019
Final sign-off
Oct 16, 2020

interior improvements with in a suite non bearing walls, accessible restroom, 4 dental treatment rooms, supporting roomd, hvac, plm, ele work from (e) ele panel

Open the permit page

$251,550
Dec 3, 2018Expired or cancelled
withdrawn May 2019
2450 Taraval Stnew orthodontics office ti (e) grnd flr retail space of mixed use bld. demo (e) non load bearing wall construction new non load bearing walls. install power, water drain, vaccum lines to locations shown. provide new susp t-par clg & lighting provide new floor & wall finishes
Details
Permit
201812037295

new orthodontics office ti (e) grnd flr retail space of mixed use bld. demo (e) non load bearing wall construction new non load bearing walls. install power, water drain, vaccum lines to locations shown. provide new susp t-par clg & lighting provide new floor & wall finishes

Open the permit page

$90,000
Feb 20, 2018Completed
final sign-off Mar 2019
1355 03rd StSan Francisco Commercial Builders Incnew dental office ti @ ground fl retail space of mixed use bldg: install new conc floor over metal deck; new partition walls, fixtures, finishes, mep. fire protection under sep permit. maher na
Details
Permit
201802201731
Permit issued
May 22, 2018
Final sign-off
Mar 21, 2019

new dental office ti @ ground fl retail space of mixed use bldg: install new conc floor over metal deck; new partition walls, fixtures, finishes, mep. fire protection under sep permit. maher na

Open the permit page

$185,000
Nov 29, 2016Expired or cancelled
cancelled Jan 2026
324 Clement Stlighting, counter, restroom upgrade. remove non bearing walls, new rooms. mechanical system duct work. new storefront door
Details
Permit
201611293660

lighting, counter, restroom upgrade. remove non bearing walls, new rooms. mechanical system duct work. new storefront door

Open the permit page

$70,000
Nov 10, 2016Expired or cancelled
expired Oct 2026
324 Clement StSonomarin Incchg of use from retail to service restaurant, demo wall, build new metal stud walls. install 5 new sinks, install new 200 amp panel, install 20 new outlets, install cabinets, new lighting, new water heater, new mechanical system duct, furnace
Details
Permit
201611102464
Permit issued
Mar 16, 2018

chg of use from retail to service restaurant, demo wall, build new metal stud walls. install 5 new sinks, install new 200 amp panel, install 20 new outlets, install cabinets, new lighting, new water heater, new mechanical system duct, furnace

Open the permit page

$70,000
May 11, 2015Completed
final sign-off Jan 2016
3251 20th AvSonomarin Incconstruction of beverage kiosk within stonestown mall (plumbing & electrical to the location to be provided by landlord under separate permit)- install kiosk structure, plumb, elect, outlets & finishes. plumb. and elect to location under sep permit.
Details
Permit
201505115932
Permit issued
Nov 30, 2015
Final sign-off
Jan 11, 2016

construction of beverage kiosk within stonestown mall (plumbing & electrical to the location to be provided by landlord under separate permit)- install kiosk structure, plumb, elect, outlets & finishes. plumb. and elect to location under sep permit.

Open the permit page

$35,000
Mar 8, 2012Completed
final sign-off Jul 2012
135 04th Stspace #fc-10 - remodel a space in metreon food court to become a filipino food kitchen. hood & duct fire suppression system separate permit.
Details
Permit
201203085645
Permit issued
Apr 13, 2012
Final sign-off
Jul 11, 2012

space #fc-10 - remodel a space in metreon food court to become a filipino food kitchen. hood & duct fire suppression system separate permit.

Open the permit page

$160,000
Aug 1, 2006Completed
final sign-off Mar 2007
500 Howard St1st floor, unit #101 - new dental office in ground floor suite. work includes non-bearing walls, electrical, plumbing & mechanical work for 1 accessible bathroom 4 dental chairs and realated service areas.
Details
Permit
200608018193
Permit issued
Nov 21, 2006
Final sign-off
Mar 12, 2007

1st floor, unit #101 - new dental office in ground floor suite. work includes non-bearing walls, electrical, plumbing & mechanical work for 1 accessible bathroom 4 dental chairs and realated service areas.

Open the permit page

$120,000
Apr 24, 2006Completed
final sign-off Dec 2006
3012 Steiner StNew West Construction Co**See Note**switching the exam rcom with the steric room. create meogac gas storage. replace (e) wood floor framing with new. revision to pa# 2004/11/10/8970.
Details
Permit
200604249701
Permit issued
Apr 24, 2006
Final sign-off
Dec 19, 2006

switching the exam rcom with the steric room. create meogac gas storage. replace (e) wood floor framing with new. revision to pa# 2004/11/10/8970.

Open the permit page

$10,000
Dec 1, 2004Completed
final sign-off Jun 2006
786 Haight Stremodel g/f medical office to become dental office
Details
Permit
200412010429
Permit issued
Mar 23, 2005
Final sign-off
Jun 20, 2006

remodel g/f medical office to become dental office

Open the permit page

$80,000
Jul 28, 2004Expired or cancelled
expired Aug 2006
691 Marina BlRobert B Lewis Const.add new 3 stop elev,add 150sf living space on 2nd fl for hallway to reach (n) elev,(n) powder room&.
Details
Permit
200407289979
Permit issued
Sep 20, 2005

add new 3 stop elev,add 150sf living space on 2nd fl for hallway to reach (n) elev,(n) powder room&.

Open the permit page

$175,000
Jul 22, 2004Completed
final sign-off Apr 2005
3995 Alemany BlWestridge Builders, Inc.construct non-load bearing partitions/install power water drain vaccum lines to location indicated
Details
Permit
200407229528
Permit issued
Dec 1, 2004
Final sign-off
Apr 26, 2005

construct non-load bearing partitions/install power water drain vaccum lines to location indicated

Open the permit page

$80,000