Karl Smith
- Listed as
- architect
- Firm
- Karl G Smith Associates
- Based in
- San Francisco
- On San Francisco permits
- Sep 2004 to Sep 2019
18 permits since 2000 (architect on 18 permits): 15 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 27, 2019 | Completed final sign-off Mar 2022 | 990 Green St | Macken Construction | unit # 1: interior remodel of (e) condio - new bathrooms, new kitchen, new lighting, new plumbing fixtures and appliances. selected demoltion.(unit at green st, street level)Details
unit # 1: interior remodel of (e) condio - new bathrooms, new kitchen, new lighting, new plumbing fixtures and appliances. selected demoltion.(unit at green st, street level) | $400,000 |
| Jul 10, 2018 | Completed final sign-off Sep 2020 | 426 Jersey St | Kilrea Construction Inc., Upcycle Builders Inc. | add a 3/f to (e) 2story bldg, 2 story horizontal extension incl. 2/f & 3/f decks. renovation of entire bldg, (n) stairway & addition of master bedrm & bath. another bedrm & bath on the 3/f to accommodate a family of four, fully 13r sprinkler. in an otherwise 2 story tight . quarters.**maher n/a**.Details
add a 3/f to (e) 2story bldg, 2 story horizontal extension incl. 2/f & 3/f decks. renovation of entire bldg, (n) stairway & addition of master bedrm & bath. another bedrm & bath on the 3/f to accommodate a family of four, fully 13r sprinkler. in an otherwise 2 story tight . quarters.**maher n/a**. | $670,000 |
| Aug 17, 2017 | Completed final sign-off Feb 2022 | 298 Alabama St | Brennan Strong Hold Construction Inc | t.i. to add 2 kitchens (non commercial) add partition walls and finishes. add 1 beverage center. revision to app#201412244455. n/a for maherDetails
t.i. to add 2 kitchens (non commercial) add partition walls and finishes. add 1 beverage center. revision to app#201412244455. n/a for maher | $200,000 |
| Aug 10, 2017 | Completed final sign-off Nov 2020 | 2511 Baker St | Jetton Construction | expansion of (e) basement (427 additional sq ft) with (n) media rm, bath & laundry & relocate internal stair. work includs (n) retaining wall & foundation.Details
expansion of (e) basement (427 additional sq ft) with (n) media rm, bath & laundry & relocate internal stair. work includs (n) retaining wall & foundation. | $450,000 |
| Sep 22, 2014 | Completed final sign-off Jul 2016 | 83 Exeter St | legalization of dwelling unit installed without a permit on (e) ground floor as (e) kitchen & one bedroom, (2) storage room, (1) mechanical room, add (1) (n) bath room in the mechanical room. (1) (e) full bath, total are (2) bath room.Details
legalization of dwelling unit installed without a permit on (e) ground floor as (e) kitchen & one bedroom, (2) storage room, (1) mechanical room, add (1) (n) bath room in the mechanical room. (1) (e) full bath, total are (2) bath room. | $15,000 | |
| Sep 3, 2014 | Expired or cancelled expired May 2019 | 2712 Webster St | remodel kitchen. (infill area) . administrative variance. remodel living room. remodel master bedroom. strengthen floor. remodel master bathroom. (infill area of lightwell).Details
remodel kitchen. (infill area) . administrative variance. remodel living room. remodel master bedroom. strengthen floor. remodel master bathroom. (infill area of lightwell). | $300,000 | |
| Jun 5, 2014 | Completed final sign-off Oct 2014 | 2076 Grove St | remodel bathroom of house 3rd floor.same location.Details
remodel bathroom of house 3rd floor.same location. | $45,000 | |
| Apr 29, 2013 | Completed final sign-off Aug 2013 | 241 05th Av | Urban Builder General Contracting Inc | main floor-bathroom remodel, relocate single interior non load bearing wall. no change to building envelope.Details
main floor-bathroom remodel, relocate single interior non load bearing wall. no change to building envelope. | $35,000 |
| Jan 14, 2013 | Completed final sign-off Jun 2013 | 2206 Steiner St | Bbc Construction Inc. | kitchen and family room remodel. replace windows in kind - max u-factor =0.40Details
kitchen and family room remodel. replace windows in kind - max u-factor =0.40 | $68,000 |
| Jun 15, 2006 | Completed final sign-off Jan 2007 | 2707 Laguna St | eliminate the violation. complaint 3359 filed 1/24/2000. planner-j. purvis. remodel existing 2 unit building. provide 2 parking spaces and 1 bedroom unit downstairs. provide living room, kitchen dining room on 1st floor, with 4 bedrooms and 4 bathrooms on 2nd floor. new siding on exterior front bay.Details
eliminate the violation. complaint 3359 filed 1/24/2000. planner-j. purvis. remodel existing 2 unit building. provide 2 parking spaces and 1 bedroom unit downstairs. provide living room, kitchen dining room on 1st floor, with 4 bedrooms and 4 bathrooms on 2nd floor. new siding on exterior front bay. | $190,000 | |
| May 30, 2006 | Completed final sign-off Oct 2006 | 45 Sea View Tr | add 25 sq.ft. bath room to lower floor & sauna 40 sq.ft.Details
add 25 sq.ft. bath room to lower floor & sauna 40 sq.ft. | $25,000 | |
| Apr 14, 2006 | Expired or cancelled withdrawn Jul 2006 | 2712 Pacific Av | remodel existing house, all floors.Details
remodel existing house, all floors. | $500,000 | |
| Nov 28, 2005 | Expired or cancelled expired May 2008 | 22 Jordan Av | provide new garage under house and provide new storage areas. lighting and electrical and plumbing. basement work onlyDetails
provide new garage under house and provide new storage areas. lighting and electrical and plumbing. basement work only | $85,000 | |
| Nov 1, 2005 | Completed final sign-off Jul 2006 | 566 Kansas St | remodel kitchen, all bathrooms, provide two new bedrooms on lower floor, sheet rock garage with type x gyp board. paint interior and exterior of house.Details
remodel kitchen, all bathrooms, provide two new bedrooms on lower floor, sheet rock garage with type x gyp board. paint interior and exterior of house. | $130,000 | |
| Oct 4, 2005 | Completed final sign-off May 2007 | 1023 Vallejo St | addition of deck off east side of building which approximates 225 sqft. deck is on the roof of the second story and exits directly to grade at this level. (e) roof will carry live loads. original deck was demolished when new roofing was installed. deck will have planters and railingDetails
addition of deck off east side of building which approximates 225 sqft. deck is on the roof of the second story and exits directly to grade at this level. (e) roof will carry live loads. original deck was demolished when new roofing was installed. deck will have planters and railing | $35,000 | |
| Aug 17, 2005 | Completed final sign-off Oct 2006 | 45 Sea View Tr | Skip Kleger Inc. | new study room on ground floor and with deck above and modified stairway to ground from kitchen.Details
new study room on ground floor and with deck above and modified stairway to ground from kitchen. | $45,000 |
| Dec 22, 2004 | Completed final sign-off Sep 2005 | 3455 Washington St | relocate the skylight and exhaust vent to above thee islandDetails
relocate the skylight and exhaust vent to above thee island | $3,000 | |
| Sep 14, 2004 | Completed final sign-off Jul 2006 | 181 28th Av | erect a one story private residential garageDetails
erect a one story private residential garage | $45,000 |