Julia A. Harberson
- Listed as
- engineer
- Firm
- Csw/Stuber-Stroeh Engineer
- Based in
- Novato
- On San Francisco permits
- Nov 2017 to Aug 2024
6 permits since 2000 (engineer on 6 permits): 4 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 8, 2024 | In progress issued Dec 2024 | 901 Battery St | Richlen Construction | abe ord 51-16 accessible building entry upgrades, relocate door actuator to front facade, exterior sidewalk upgrades. abe 20200492108Details
abe ord 51-16 accessible building entry upgrades, relocate door actuator to front facade, exterior sidewalk upgrades. abe 20200492108 | $147,000 |
| Apr 5, 2021 | Completed final sign-off Sep 2021 | 640 Sacramento St | Bach Construction, Inc. | per accessible building entrance checklist submittal: provide new automatic door opener and accessible sign. roughen surface of (e) sidwalk surface.Details
per accessible building entrance checklist submittal: provide new automatic door opener and accessible sign. roughen surface of (e) sidwalk surface. | $6,000 |
| Apr 5, 2021 | Completed final sign-off Sep 2021 | 637 Commercial St | Bach Construction, Inc. | per accessible building entrance checklist submittal: relocation of (1) automatic door opener. roughen surface of (e) sloped sidewalk surface.Details
per accessible building entrance checklist submittal: relocation of (1) automatic door opener. roughen surface of (e) sloped sidewalk surface. | $2,500 |
| Sep 3, 2020 | Expired or cancelled withdrawn Jan 2021 | 637 Commercial St | per abe checklist submittal: -exterior sidewalk improvement -relocation of one(1) automatic door opener (actuator) bar at one entrance. (accessible business entrance program per ord 51-16)Details
per abe checklist submittal: -exterior sidewalk improvement -relocation of one(1) automatic door opener (actuator) bar at one entrance. (accessible business entrance program per ord 51-16) | $100,000 | |
| Oct 22, 2018 | Completed final sign-off Mar 2019 | 635 14th Av | Hillhouse Construction Company Inc | new ada parking stall, curb and ramp to replace existing, located in private parking lot. ref pa 2017-1031-2729 rev 2Details
new ada parking stall, curb and ramp to replace existing, located in private parking lot. ref pa 2017-1031-2729 rev 2 | $4,500 |
| Nov 8, 2017 | Completed final sign-off Jan 2019 | 4258 26th St | Keen Construction Incorporated | revision to pa#201412093393, storm drainage in rear yard and pumps for (e) gravity drain (side sewer) at the front.Details
revision to pa#201412093393, storm drainage in rear yard and pumps for (e) gravity drain (side sewer) at the front. |