Joseph Xiao He Xu
- Listed as
- architect, designer, engineer
- Firm
- Xu Engineering
- Based in
- Fremont
- On San Francisco permits
- Apr 2007 to Nov 2020
74 permits since 2000 (engineer on 64 permits, architect on 9 permits, designer on 1 permit): 58 completed, 3 never finaled, 13 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 21, 2020 | Completed final sign-off Mar 2021 | 18 Lucky St | H Q Construction | to comply with nov# 201965391. revision to no plan pa# 201909121494. replace existing damaged exterior stairway at rear side of building. for 2nd mean of egress.Details
to comply with nov# 201965391. revision to no plan pa# 201909121494. replace existing damaged exterior stairway at rear side of building. for 2nd mean of egress. | $7,000 |
| Jul 24, 2019 | Completed final sign-off May 2020 | 508 Sanchez St | revision to pa #201803012589, moving (1) post.Details
revision to pa #201803012589, moving (1) post. | $500 | |
| Feb 26, 2019 | Completed final sign-off Apr 2021 | 1470 12th Av | Heaven's Earth Co Inc | legalize (e) unpermitted unit @ groundd floor per ord# 43-14 with 2 bedrooms & 1 bath. to comply with violation# 201875066. add 4th adu under separate permit.Details
legalize (e) unpermitted unit @ groundd floor per ord# 43-14 with 2 bedrooms & 1 bath. to comply with violation# 201875066. add 4th adu under separate permit. | $5,000 |
| May 16, 2018 | Completed final sign-off Jul 2018 | 642 Natoma St | voluntary strengthening: add new plywood sheathing and sill plate anchor to basement cripple wallDetails
voluntary strengthening: add new plywood sheathing and sill plate anchor to basement cripple wall | $19,000 | |
| Oct 5, 2017 | Completed final sign-off Apr 2018 | 45 Venus St | Golden Bay Remodeling Inc | ground fl: add one full bath and converting (e) storage into bedroom. approx 220 sq ft.Details
ground fl: add one full bath and converting (e) storage into bedroom. approx 220 sq ft. | $5,000 |
| Sep 6, 2017 | Completed final sign-off May 2018 | 12 Minerva St | B And D Excavation And Construction | new landscape retaining wall at the rear yard.Details
new landscape retaining wall at the rear yard. | $5,000 |
| Sep 6, 2017 | Completed final sign-off May 2018 | 16 Minerva St | B And D Excavation And Construction | new landscape retaining wall at the rear yard.Details
new landscape retaining wall at the rear yard. | $5,000 |
| Jun 13, 2016 | Completed final sign-off Aug 2016 | 50 Hearst Av | add new shear wall & holdown at two sides of garage door.Details
add new shear wall & holdown at two sides of garage door. | $2,000 | |
| May 8, 2015 | Expired or cancelled expired Mar 2019 | 277 Marietta Dr | Chateau Renovations Inc | add new exterior deck and stair case of 2nd & 1st floor. in the back of the existing house.Details
add new exterior deck and stair case of 2nd & 1st floor. in the back of the existing house. | $8,000 |
| May 7, 2015 | Completed final sign-off Jul 2015 | 45 Venus St | All Star Construction | to comply with nov # 201544361 -1)remodel kitchen and bathroom one on upper floor. 2) remove exisitng non-conforming bathroom #2 on main floor. retile entry.Details
to comply with nov # 201544361 -1)remodel kitchen and bathroom one on upper floor. 2) remove exisitng non-conforming bathroom #2 on main floor. retile entry. | $23,000 |
| Feb 9, 2015 | Completed final sign-off Mar 2015 | 3187 Mission St | Y D Construction Co. Inc. | add three tankless water heater. revision to extg permit #201310038435.Details
add three tankless water heater. revision to extg permit #201310038435. | $3,000 |
| Oct 16, 2014 | Never finaled issued Jun 2015, no final | 1475 Haight St | J.W.D. Construction | add new 2-story deck with new stair case at 2nd & 3rd floor in back of the existing house.Details
add new 2-story deck with new stair case at 2nd & 3rd floor in back of the existing house. | $18,000 |
| Aug 1, 2014 | Expired or cancelled cancelled Jan 2026 | 368 Dolores St | enclose existing lightwell & convert into garage space. remove (e) post at middle of garage & re-support w/new beam & footing. relocate (e) furnaces, voluntary strengthening, add new steel moment frame & plywood shear wall. work in common area. n/a maher ordinanceDetails
enclose existing lightwell & convert into garage space. remove (e) post at middle of garage & re-support w/new beam & footing. relocate (e) furnaces, voluntary strengthening, add new steel moment frame & plywood shear wall. work in common area. n/a maher ordinance | $20,000 | |
| Jul 17, 2014 | Completed final sign-off Apr 2015 | 1627 18th Av | Stone Ink Construction | rear foundation replacementDetails
rear foundation replacement | $5,000 |
| Jun 27, 2014 | Completed final sign-off Oct 2014 | 654 Cayuga Av | Niland Builders | convert e space on 1st floor to have a family room, storage, full bath, for single family useDetails
convert e space on 1st floor to have a family room, storage, full bath, for single family use | $48,000 |
| May 23, 2014 | Completed final sign-off Jun 2015 | 57 Springfield Dr | J.W.D. Construction | 2 stories rear addition @ the back of (e) house with 337.5 sq. f.t of each floor. addition will be 1 bedroom & 1 family romm. convert (e) bedroom into bathroom & office. remodel (e) kitchen & bathroom.Details
2 stories rear addition @ the back of (e) house with 337.5 sq. f.t of each floor. addition will be 1 bedroom & 1 family romm. convert (e) bedroom into bathroom & office. remodel (e) kitchen & bathroom. | $70,000 |
| Apr 22, 2014 | Completed final sign-off Mar 2019 | 133 Blake St | Y D Construction Co. Inc. | convert existing 1st floor storage into habitable space (540 sq ft). the addition to include two bedroom & one bathroom & a staircase.Details
convert existing 1st floor storage into habitable space (540 sq ft). the addition to include two bedroom & one bathroom & a staircase. | $30,000 |
| Feb 4, 2014 | Completed final sign-off Oct 2014 | 3163 Sacramento St | Y D Construction Co. Inc. | revision to appl #201401176595 - interior remodel-#3165: kitchen remodel, reconfigure (e) bathroom, add new bathroom. remove (e) wall at kitchen. #3167: bathroom remodel.Details
revision to appl #201401176595 - interior remodel-#3165: kitchen remodel, reconfigure (e) bathroom, add new bathroom. remove (e) wall at kitchen. #3167: bathroom remodel. | $5,000 |
| Jan 21, 2014 | Expired or cancelled expired May 2018 | 1326 Larkin St | revision to 201210091530. interior remodel unit 1326: add new bath in e bedroom. new study in e bedroom. relocate furnace, change spiral stairs to straight stairs. relocate e bath. convert e bath into office. 1328: add new bath in e bedroom, add new study in e bedroom. relocate furnace.Details
revision to 201210091530. interior remodel unit 1326: add new bath in e bedroom. new study in e bedroom. relocate furnace, change spiral stairs to straight stairs. relocate e bath. convert e bath into office. 1328: add new bath in e bedroom, add new study in e bedroom. relocate furnace. | $15,000 | |
| Dec 6, 2013 | Expired or cancelled expired Oct 2019 | 1111 Green St | Y D Construction Co. Inc. | interior remodel of all 11 units. unit 1111 and 1115 convert extg living room into 2 bedrooms. unit 1119 and 1117 convert extg dining room into office and study. unit 1123 convert extg master bedroom into 2 bedrooms. convert extg living room into 2 bedrooms. unit 1125 and 1127 convert extg livingDetails
interior remodel of all 11 units. unit 1111 and 1115 convert extg living room into 2 bedrooms. unit 1119 and 1117 convert extg dining room into office and study. unit 1123 convert extg master bedroom into 2 bedrooms. convert extg living room into 2 bedrooms. unit 1125 and 1127 convert extg living | $20,000 |
| Oct 18, 2013 | Expired or cancelled expired Sep 2020 | 1714 Lake St | Y D Construction Co. Inc. | lower floor addition:add 1056 sq ft at lower floor(2 bedroom, 3 bath, laundry, entertainment room). 1st floor remodel: kitchen and bathroom remodel. 2nd floor remodel:bathroom.Details
lower floor addition:add 1056 sq ft at lower floor(2 bedroom, 3 bath, laundry, entertainment room). 1st floor remodel: kitchen and bathroom remodel. 2nd floor remodel:bathroom. | $85,000 |
| Oct 3, 2013 | Completed final sign-off Mar 2015 | 3187 Mission St | Y D Construction Co. Inc. | interior remodel, unit 1:relocate/remodel e kitchen, convert portion of e living rm into bedroom 3, new bath in bedrm 2. remodel e bath. unit 2: remodel e kitchen, new bath, add bath, relocate e bath. unit 3: remodel e kitchen, new 1/2 bath, convert e bath into den, add full bathDetails
interior remodel, unit 1:relocate/remodel e kitchen, convert portion of e living rm into bedroom 3, new bath in bedrm 2. remodel e bath. unit 2: remodel e kitchen, new bath, add bath, relocate e bath. unit 3: remodel e kitchen, new 1/2 bath, convert e bath into den, add full bath | $20,000 |
| Aug 27, 2013 | Expired or cancelled cancelled Jan 2026 | 4773 18th St | convert (e) lower floor basement into habitable space. the addition to include two study, two bathrooms, a hallway & office. convert (e) laundry into media room & (e) playroom into bedroom.Details
convert (e) lower floor basement into habitable space. the addition to include two study, two bathrooms, a hallway & office. convert (e) laundry into media room & (e) playroom into bedroom. | $10,000 | |
| Jul 2, 2013 | Completed final sign-off Oct 2013 | 2006 16th Av | Evergreen Flooring And Gc | convert (e) bathroom into 2 full bathrooms. replace (e) roof with new roofDetails
convert (e) bathroom into 2 full bathrooms. replace (e) roof with new roof | $2,000 |
| Jun 12, 2013 | Completed final sign-off Nov 2013 | 2639 14th Av | Pn Construction | remodel (e) ktichen, add new sink at powder room, widen (e) opening between living room & dining room. add 3 new skylights at kitchen areaDetails
remodel (e) ktichen, add new sink at powder room, widen (e) opening between living room & dining room. add 3 new skylights at kitchen area | $31,243 |
| Apr 19, 2013 | Completed final sign-off Jun 2019 | 477 14th St | Y D Construction Co. Inc. | convert (e) first floor storage into habitable space, the additoin to include two bedrooms, two study rooms & two bathrooms. add new internal stairs from 2nd to 1st floor. sprinklers required under seperate permit, per sffd.Details
convert (e) first floor storage into habitable space, the additoin to include two bedrooms, two study rooms & two bathrooms. add new internal stairs from 2nd to 1st floor. sprinklers required under seperate permit, per sffd. | $50,000 |
| Apr 9, 2013 | Completed final sign-off Oct 2025 | 208 Girard St | H Construction Co | 2 story horizontal addition. 682 sq. ft. @ 2nd floor & 672 at 1st floor. raise (e) house 2' & add new 615 sq. ft. basement garage. add 3 bedrooms, 2 study, 3 new bathrooms, 1 kitchen & 1 living room.Details
2 story horizontal addition. 682 sq. ft. @ 2nd floor & 672 at 1st floor. raise (e) house 2' & add new 615 sq. ft. basement garage. add 3 bedrooms, 2 study, 3 new bathrooms, 1 kitchen & 1 living room. | $80,000 |
| Feb 12, 2013 | Completed final sign-off May 2013 | 2332 Fulton St | Kin Fai Construction Co. | remodel (e) bathroom, convert existing closet into new bathroom, add new window @ existing family room.Details
remodel (e) bathroom, convert existing closet into new bathroom, add new window @ existing family room. | $5,000 |
| Jan 31, 2013 | Completed final sign-off Mar 2013 | 1101 Green St | Goodman Construction & Design Co | new 8ft tall fence with 4ft gateDetails
new 8ft tall fence with 4ft gate | $1,000 |
| Jan 7, 2013 | Completed final sign-off Apr 2013 | 3735 Anza St | Kin Fai Construction Co. | unit #3-interior remodel-kitchen remodel, add new living room between (e) bedrooms. add new study at 9e) kitchen. add new bathroomDetails
unit #3-interior remodel-kitchen remodel, add new living room between (e) bedrooms. add new study at 9e) kitchen. add new bathroom | $20,000 |
| Jan 7, 2013 | Completed final sign-off Mar 2013 | 1111 Green St | new 8ft tall fence with 4ft gateDetails
new 8ft tall fence with 4ft gate | $1,000 | |
| Dec 21, 2012 | Completed final sign-off Aug 2013 | 167 Fair Oaks St | Jian Lou Construction Co. | revision to existing pa# 201204027383 per field inspector comments. 1. revision wall detail at skylight. rise floor at proposed bathroom.Details
revision to existing pa# 201204027383 per field inspector comments. 1. revision wall detail at skylight. rise floor at proposed bathroom. | |
| Dec 6, 2012 | Completed final sign-off Dec 2012 | 1111 Green St | Hing Wah Construction Inc | add new metal guard rails at patio. pave existing patio with new permeable brick paver. add new metal stairDetails
add new metal guard rails at patio. pave existing patio with new permeable brick paver. add new metal stair | $3,000 |
| Nov 2, 2012 | Completed final sign-off Aug 2013 | 1500 Newcomb Av | construction of rear deckDetails
construction of rear deck | $10,000 | |
| Oct 19, 2012 | Completed final sign-off Jan 2014 | 2821 Broderick St | replace extg wood fence wall with concrete wall.Details
replace extg wood fence wall with concrete wall. | $5,000 | |
| Sep 25, 2012 | Completed final sign-off Jul 2014 | 1618 Mcallister St | Y D Construction Co. Inc. | 1st fl-remodel (e) kitchen, add 1 bathroom, 2nd fl-remodel (e) kitchen, add 1 bathroom, relocate (e) attic stairs, attic fl-convert (e) attic into habitable space, addition to inlcude 1 bedroom, 2 bathrooms, 1 music room & 1 study. add 6 dormersDetails
1st fl-remodel (e) kitchen, add 1 bathroom, 2nd fl-remodel (e) kitchen, add 1 bathroom, relocate (e) attic stairs, attic fl-convert (e) attic into habitable space, addition to inlcude 1 bedroom, 2 bathrooms, 1 music room & 1 study. add 6 dormers | $80,000 |
| Aug 6, 2012 | Completed final sign-off Mar 2013 | 176 Parker Av | Y D Construction Co. Inc. | int remodel-1st flr (e) garage: 2 new bedrooms & 2 bathrooms, add new int stairs. 2nd flr:relocate (e) kitchen, convert (e) closet into bath, convert (e) kitchen into bedroom, convert nook into studyroom. 3rd flr:convert (e) closet into bath, relcoate (e) kitchen, convert (e) kitchen into bedroom.Details
int remodel-1st flr (e) garage: 2 new bedrooms & 2 bathrooms, add new int stairs. 2nd flr:relocate (e) kitchen, convert (e) closet into bath, convert (e) kitchen into bedroom, convert nook into studyroom. 3rd flr:convert (e) closet into bath, relcoate (e) kitchen, convert (e) kitchen into bedroom. | $20,000 |
| Aug 6, 2012 | Expired or cancelled cancelled Jan 2026 | 765 Ofarrell St | unit #28 interior remodel: relcoate & remodel existing kitchen & bathroom, add new bedroom & study.Details
unit #28 interior remodel: relcoate & remodel existing kitchen & bathroom, add new bedroom & study. | $5,000 | |
| Jul 19, 2012 | Completed final sign-off Nov 2012 | 1086 Post St | Kin Fai Construction Co. | unit #316-interior remodel-relocate & remodel (e) kitchen, relocate & remodel bathroom. add new bedroom in (e) living roomDetails
unit #316-interior remodel-relocate & remodel (e) kitchen, relocate & remodel bathroom. add new bedroom in (e) living room | $5,000 |
| Jul 19, 2012 | Expired or cancelled cancelled Jan 2026 | 765 Ofarrell St | unit #44-interior remodel-relocate & remodel (e) kitchen & bathroom. add new study roomDetails
unit #44-interior remodel-relocate & remodel (e) kitchen & bathroom. add new study room | $5,000 | |
| Jun 7, 2012 | Expired or cancelled cancelled Jan 2026 | 388 Capp St | interior remodel. convert exiting dining room into bedroom and study. add new bath. remove existing kitchenDetails
interior remodel. convert exiting dining room into bedroom and study. add new bath. remove existing kitchen | $10,000 | |
| May 15, 2012 | Never finaled issued May 2012, no final | 1500 Newcomb Av | revision to show as built conditions relating to pa #2011.0715.0380, 2011.0914.4655, 2011.0928.5711, 2011.1104.8320, 2012.0405.7747 & 2012.0420.8791 - re-labelling of second parking garage to storage @ ground floor & sunroom to bedroom on 3rd floor. no construction under this permit.Details
revision to show as built conditions relating to pa #2011.0715.0380, 2011.0914.4655, 2011.0928.5711, 2011.1104.8320, 2012.0405.7747 & 2012.0420.8791 - re-labelling of second parking garage to storage @ ground floor & sunroom to bedroom on 3rd floor. no construction under this permit. | ||
| May 1, 2012 | Completed final sign-off Aug 2012 | 1086 Post St | Kin Fai Construction Co. | unit 304, 3rd floor interior remodel. remodel existing kitchen, relocate existing bath, add new bedroom, and study in e living room area.Details
unit 304, 3rd floor interior remodel. remodel existing kitchen, relocate existing bath, add new bedroom, and study in e living room area. | $13,000 |
| Apr 2, 2012 | Completed final sign-off Dec 2012 | 3158 Mission St | Jian Lou Construction Co. | #1- revision to exiting approved pa# 201202033553. relocate proposed half bath to closet area. partial compliance of open code enforcement cases.Details
#1- revision to exiting approved pa# 201202033553. relocate proposed half bath to closet area. partial compliance of open code enforcement cases. | $5,000 |
| Feb 3, 2012 | Completed final sign-off Dec 2012 | 3158 Mission St | Jian Lou Construction Co. | #1 - comply w/nov# 201159467 dated 11/14/2001-2nd floor (front unit)-interior remodel, remodel (e) kitchen, convert (e) living room into bedroom & office. convert (e) laundry room into bedroom. add new powder room (half bathroom). remodel (e) bahtroomDetails
#1 - comply w/nov# 201159467 dated 11/14/2001-2nd floor (front unit)-interior remodel, remodel (e) kitchen, convert (e) living room into bedroom & office. convert (e) laundry room into bedroom. add new powder room (half bathroom). remodel (e) bahtroom | $60,000 |
| Jan 25, 2012 | Completed final sign-off Aug 2012 | 6909 Geary Bl | remodel to crepe store. plumbing & counter installtion. for change of use from retail to restaurant. two sinks & 3 electrical receptacle outlet.Details
remodel to crepe store. plumbing & counter installtion. for change of use from retail to restaurant. two sinks & 3 electrical receptacle outlet. | $3,000 | |
| Jan 20, 2012 | Completed final sign-off Jun 2012 | 33 Hemway Tr | Kin Fai Construction Co. | comply with nov# 201282294-convert (e) living room into bedrooms, convert (e) hallway & portion of (e) kitchen into living room. enlarge & remodel (e) kitchen @ 2nd floor only.Details
comply with nov# 201282294-convert (e) living room into bedrooms, convert (e) hallway & portion of (e) kitchen into living room. enlarge & remodel (e) kitchen @ 2nd floor only. | $8,000 |
| Nov 4, 2011 | Completed final sign-off May 2012 | 1500 Newcomb Av | M D Construction | revision of permit app#201109285711. add platform on floor of family room. recess beam into ceiling of family room.Details
revision of permit app#201109285711. add platform on floor of family room. recess beam into ceiling of family room. | $2,000 |
| Sep 28, 2011 | Completed final sign-off May 2012 | 1500 Newcomb Av | add new bathroom and mech room at basement level. add family room at gr fl, remove existing 6x6 postsDetails
add new bathroom and mech room at basement level. add family room at gr fl, remove existing 6x6 posts | $5,000 | |
| Sep 7, 2011 | Never finaled issued Mar 2013, no final | 2910 Franklin St | Y D Construction Co. Inc. | lower existing basement 2ft approx, convert into habitable space. add 4 bedrrooms, 1 family rm, 3 full baths. 1st floor remodel kitchen, 3 new baths. 2nd fl remodel, add kitchen remodel, add 1 bath.Details
lower existing basement 2ft approx, convert into habitable space. add 4 bedrrooms, 1 family rm, 3 full baths. 1st floor remodel kitchen, 3 new baths. 2nd fl remodel, add kitchen remodel, add 1 bath. | $30,000 |
| Aug 25, 2011 | Completed final sign-off Oct 2011 | 1240 17th St | Ken Leung Construction Inc | enclose existing mezzanine for storage. new lever hardware at front door. no exterior work.Details
enclose existing mezzanine for storage. new lever hardware at front door. no exterior work. | $1,000 |
| Aug 1, 2011 | Completed final sign-off Jan 2012 | 15 Leroy Pl | Hing Wah Construction Inc | unit #15 only -revision to constr. appl.#201003087762: convert (e) pantry into half bathroom. convert (e) living rm. to study, replace (e) front window. add (n) door to lightwell. reconfigure master bedroom.Details
unit #15 only -revision to constr. appl.#201003087762: convert (e) pantry into half bathroom. convert (e) living rm. to study, replace (e) front window. add (n) door to lightwell. reconfigure master bedroom. | $1,000 |
| May 18, 2011 | Completed final sign-off Jan 2014 | 1468 Masonic Av | P F Construction Co | replace existing brick foundation with new reinforced concrete foundation. remove e brick chimney. floor framing revision to e permit pa #201003228630.Details
replace existing brick foundation with new reinforced concrete foundation. remove e brick chimney. floor framing revision to e permit pa #201003228630. | $20,000 |
| May 3, 2011 | Completed final sign-off Jun 2011 | 133 Jules Av | revision to 20100604388: revise approved office to bedroom, enlarge window at rear. max u-factor .40 @ window.Details
revision to 20100604388: revise approved office to bedroom, enlarge window at rear. max u-factor .40 @ window. | $100 | |
| Apr 22, 2011 | Completed final sign-off Sep 2011 | 9 Leroy Pl | Kin Fai Construction Co. | comply with nov# 201190066-convert (e) pantry into half bathroom & build partition for a dent. remodel kitchen.Details
comply with nov# 201190066-convert (e) pantry into half bathroom & build partition for a dent. remodel kitchen. | $3,000 |
| Apr 5, 2011 | Completed final sign-off Jun 2011 | 823 Alvarado St | Martin Paul Duggan Contracting | replace e brick foundation with new concrete foundation. new slab at garage. add n plywood sheathing at 1st level. remove e post at garge, new beamDetails
replace e brick foundation with new concrete foundation. new slab at garage. add n plywood sheathing at 1st level. remove e post at garge, new beam | $20,000 |
| Oct 8, 2010 | Completed final sign-off Feb 2011 | 25 Almaden Ct | Goodman Construction & Design Co | revision to appl #201007166774: framing revision, eliminate steel detail @ sink half wall, drywall repair & restucco @ front wall.Details
revision to appl #201007166774: framing revision, eliminate steel detail @ sink half wall, drywall repair & restucco @ front wall. | $2,000 |
| Oct 7, 2010 | Completed final sign-off Mar 2011 | 190 Miraloma Dr | Goodman Construction & Design Co | remove (e) 6x6 post. add (n) continous lvl beam, add plywd. sheathing at interior walls.Details
remove (e) 6x6 post. add (n) continous lvl beam, add plywd. sheathing at interior walls. | $2,000 |
| Jul 23, 2010 | Completed final sign-off Dec 2011 | 3156 Mission St | Dmsquare Construction | to comply with complaint case #200920422 & 200928663; fire rate existing hallway for exiting passageway, replace existing doors with new fire-rated doors.Details
to comply with complaint case #200920422 & 200928663; fire rate existing hallway for exiting passageway, replace existing doors with new fire-rated doors. | $10,000 |
| Jul 23, 2010 | Completed final sign-off Dec 2011 | 3158 Mission St | Dmsquare Construction | to comply w/ nov complaint #200917441 & 200919361 & 200920421; fire rate existing hallway for exiting passageway. replace existing doors with new fire-rated door.Details
to comply w/ nov complaint #200917441 & 200919361 & 200920421; fire rate existing hallway for exiting passageway. replace existing doors with new fire-rated door. | $10,000 |
| May 5, 2010 | Completed final sign-off Dec 2011 | 17 Capp St | repair existing fire damaged area and add on more square footage. application to comply with abatement complaints# 200667107 and 200881639. this is for the back unit #17 capp street.Details
repair existing fire damaged area and add on more square footage. application to comply with abatement complaints# 200667107 and 200881639. this is for the back unit #17 capp street. | $25,000 | |
| Apr 23, 2010 | Completed final sign-off Mar 2011 | 19 Capp St | convert closet into kitchen 2nd floor. add 2nd unit. this is for the front building of the lot. (19 capp street.)Details
convert closet into kitchen 2nd floor. add 2nd unit. this is for the front building of the lot. (19 capp street.) | $5,000 | |
| Apr 14, 2010 | Completed final sign-off Apr 2011 | 5570 Mission St | K C Engineering Construction | unit#5 at 2nd fl. remodel (e) kitchen and bathroom. replace water damaged sheet rocks. unit# 11 at 3rd fl. replace (e) 2x6 fire damage ceiling joist on top of kitchen. remodel (e) kitchen and bathrm. replace water damage sheet rocksDetails
unit#5 at 2nd fl. remodel (e) kitchen and bathroom. replace water damaged sheet rocks. unit# 11 at 3rd fl. replace (e) 2x6 fire damage ceiling joist on top of kitchen. remodel (e) kitchen and bathrm. replace water damage sheet rocks | $5,000 |
| Mar 19, 2010 | Completed final sign-off Oct 2010 | 759 09th Av | J. Ho Construction Inc | remodel existing basement floor add one bathroom, one bedroom, one laundry room.Details
remodel existing basement floor add one bathroom, one bedroom, one laundry room. | $10,000 |
| Oct 30, 2009 | Expired or cancelled expired Jan 2012 | 300 Santa Ana Av | Everhome Builder Inc. | revision to 2003041492. reconfigure and remodel master bathroom. add new elec outlets. change sliding door and window to french doors. relocate laundry to e garage. add new exterior deck at rear.Details
revision to 2003041492. reconfigure and remodel master bathroom. add new elec outlets. change sliding door and window to french doors. relocate laundry to e garage. add new exterior deck at rear. | $20,000 |
| Jul 13, 2009 | Completed final sign-off Feb 2010 | 615 Head St | Goodman Construction & Design Co | revision to appl #200906231035 - replace exisitng footing with new retaining wall , add new concrete stem cap over existing footing.Details
revision to appl #200906231035 - replace exisitng footing with new retaining wall , add new concrete stem cap over existing footing. | $5,000 |
| Jul 10, 2009 | Completed final sign-off Jul 2010 | 619 San Jose Av | Goodman Construction & Design Co | framing revision to (e) approved pa# 2005-0628-6293-s1/r1Details
framing revision to (e) approved pa# 2005-0628-6293-s1/r1 | |
| Jun 19, 2009 | Completed final sign-off Apr 2010 | 2189 Pine St | Domus Construction & Design | replace (e) eroded footing at left rear of (e) building. add new footing at catilever floorDetails
replace (e) eroded footing at left rear of (e) building. add new footing at catilever floor | $40,000 |
| Feb 17, 2009 | Completed final sign-off Mar 2011 | 3735 Anza St | Fay Tat Construction Co | revision to pa# 2008-0620-4964-delete proposed interior remodel work at 2nd floor unit #2 & unit #3, delete proposed interior remodel work at 3rd floor unit #6Details
revision to pa# 2008-0620-4964-delete proposed interior remodel work at 2nd floor unit #2 & unit #3, delete proposed interior remodel work at 3rd floor unit #6 | |
| Jan 15, 2009 | Expired or cancelled cancelled Jan 2026 | 3735 Anza St | add electric wall heaters at unit 1, 2, 4, and 5.Details
add electric wall heaters at unit 1, 2, 4, and 5. | $2,000 | |
| Dec 16, 2008 | Expired or cancelled expired Dec 2010 | 1624 Bay St | framing revision to existing permit 200108065413-r1. structural framing and shear wall changesDetails
framing revision to existing permit 200108065413-r1. structural framing and shear wall changes | $5,000 | |
| Sep 23, 2008 | Completed final sign-off Apr 2009 | 675 Teresita Bl | R G K Construction Services | revision to appl #200701101384 -extension of balcony #2 @ 2/f to meet col.line 5. add closet @ north bedroom, add bar sink & utility sink & delete folding partition @ 1st flr. add dble head shower @ basement & relocate sump pump & access panels to garden stor lvl.add extra window along col line 2.Details
revision to appl #200701101384 -extension of balcony #2 @ 2/f to meet col.line 5. add closet @ north bedroom, add bar sink & utility sink & delete folding partition @ 1st flr. add dble head shower @ basement & relocate sump pump & access panels to garden stor lvl.add extra window along col line 2. | $5,000 |
| Jun 20, 2008 | Expired or cancelled expired Jan 2017 | 3735 Anza St | Fay Tat Construction Co | interior remodel: unit#7-relocate kitchen & study rm, add 1 bathrm, master bedrm w/new bathrm, remodel (e) bathrms & bedrms, unit #4,5,6-remodel (e) bathrms & kitchen, relocate entry doors & add 1 door to living rm, unit #1,2,3-remodel (e) bathrm/kitchen, relocate entry doors, non structural partitiDetails
interior remodel: unit#7-relocate kitchen & study rm, add 1 bathrm, master bedrm w/new bathrm, remodel (e) bathrms & bedrms, unit #4,5,6-remodel (e) bathrms & kitchen, relocate entry doors & add 1 door to living rm, unit #1,2,3-remodel (e) bathrm/kitchen, relocate entry doors, non structural partiti | $100,000 |
| Apr 18, 2007 | Completed final sign-off Oct 2007 | 917 Fulton St | remove and replace extg utility room at 2nd and 3rd floor. remove and replace extg exterior stair and new exterior deck. reducing scope of work from application #200508019083Details
remove and replace extg utility room at 2nd and 3rd floor. remove and replace extg exterior stair and new exterior deck. reducing scope of work from application #200508019083 |