Joseph Oliveri
- Listed as
- contractor, designer
- Firm
- Pavion Corp
- Based in
- Chantilly
- On San Francisco permits
- Mar 2025 to Dec 2025
5 permits since 2000 (contractor on 5 permits, designer on 1 permit): 4 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Architects
- Neil Kaye
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 4
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 18, 2025 | Completed final sign-off Jun 2026 | 755 Ashbury St | Pavion Corp | fire alarm modification due to kitchen remodel. add new relay to shutdown mav-1. add new horn strobe near cooler in kitchen. add new smoke detectors in library.ref# 2023-0601-8988/2025-1006-6803Details
fire alarm modification due to kitchen remodel. add new relay to shutdown mav-1. add new horn strobe near cooler in kitchen. add new smoke detectors in library.ref# 2023-0601-8988/2025-1006-6803 | $12,672 |
| Jul 22, 2025 | In progress issued Aug 2025 | 101 South Van Ness Av | Pavion Corp | provide replacement of the existing dact with a new csfm listed clss communicator. provide a new power supply for the clss communicatorDetails
provide replacement of the existing dact with a new csfm listed clss communicator. provide a new power supply for the clss communicator | $6,379 |
| Jul 22, 2025 | Completed final sign-off Oct 2025 | 209 Post St | Pavion Corp | fire alarm. to provide the replacement of the pots lines with a new csfm listed clss communicator.Details
fire alarm. to provide the replacement of the pots lines with a new csfm listed clss communicator. | $6,482 |
| Jun 12, 2025 | Completed final sign-off Oct 2025 | 111 Maiden Ln | Pavion Corp | to provide replacement of the pots lines with new csfm listed, clss communicatorDetails
to provide replacement of the pots lines with new csfm listed, clss communicator | $6,747 |
| Mar 10, 2025 | Completed final sign-off Aug 2025 | 303 02nd St | Pavion Corp | suite 400 interior ti: upgrade door hardware. upgrade (e) analog video intercom to a new video digital system and door operator at/for the suite main entry, power supply, back up battery, all associated hardware, conduit & cabling & software installationDetails
suite 400 interior ti: upgrade door hardware. upgrade (e) analog video intercom to a new video digital system and door operator at/for the suite main entry, power supply, back up battery, all associated hardware, conduit & cabling & software installation | $32,104 |