John Bailey
- Listed as
- authorized agent-others, engineer
- Firm
- Bailey Engineer
- Based in
- San Leandro
- On San Francisco permits
- Jul 2002 to Dec 2025
9 permits since 2000 (engineer on 8 permits, authorized agent-others on 1 permit): 9 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 23, 2025 | Completed final sign-off Jul 2026 | 290 Channel St | Javier Mendoza | prop h: new coffee bar service counter, cafe fixtures & equipment incl. hand sink,dishwashing sink, offee equipment, refrigeration. upgrade hot water system w/ tank heater; 2 floor sinks.move/change/add elect branch ckts. install health code compliant finishes. change of occupancy from a-3 to a-2Details
prop h: new coffee bar service counter, cafe fixtures & equipment incl. hand sink,dishwashing sink, offee equipment, refrigeration. upgrade hot water system w/ tank heater; 2 floor sinks.move/change/add elect branch ckts. install health code compliant finishes. change of occupancy from a-3 to a-2 | $9,500 |
| Sep 4, 2015 | Completed final sign-off Nov 2018 | 258 Divisadero St | neighborhood notification per section 312. change of use from limited retaurant to restaurant. no proposed construction or alterations under this permitDetails
neighborhood notification per section 312. change of use from limited retaurant to restaurant. no proposed construction or alterations under this permit | ||
| Sep 3, 2014 | Completed final sign-off Nov 2015 | 550 18th Av | 1st level: new restroom, new flooirng, new shear wall. 2nd level: relocate powder room, new openings, replacing new kitchen cabs, struct. fram & new deck. 3rd level: new 2nd bathroom, remodel (e) bath. 4th level: minor renovation to non load bearing walls.Details
1st level: new restroom, new flooirng, new shear wall. 2nd level: relocate powder room, new openings, replacing new kitchen cabs, struct. fram & new deck. 3rd level: new 2nd bathroom, remodel (e) bath. 4th level: minor renovation to non load bearing walls. | $100,000 | |
| Jan 22, 2014 | Completed final sign-off Feb 2015 | 2706 24th St | J. Ho Construction Inc, J L General Construction Inc | change of use b to a. ground floor - new restaurant, minor non-structural demolitoin, new kitchen, dish washing station, walk-in cooler, office, bar, lighting, hvac, structural framing. life safety under separate permits. ** maher: compliance with ordinance no# 155-13 not required **Details
change of use b to a. ground floor - new restaurant, minor non-structural demolitoin, new kitchen, dish washing station, walk-in cooler, office, bar, lighting, hvac, structural framing. life safety under separate permits. ** maher: compliance with ordinance no# 155-13 not required ** | $65,000 |
| Sep 28, 2011 | Completed final sign-off Jan 2012 | 833 26th Av | Keen Construction Incorporated | rebuild existing interior stairs in-kind in same location. voluntary seismic retrofit with shearwalls and grade beam at the ground floor level.Details
rebuild existing interior stairs in-kind in same location. voluntary seismic retrofit with shearwalls and grade beam at the ground floor level. | $15,000 |
| Jul 2, 2009 | Completed final sign-off May 2010 | 3770 21st St | Santilli & Forster Construction | revision to appl #200905138322 - front stair & porch repair, w/structural detail. new siding & replace aluminum porch windows & replace wooden gate with wooden door on front of house.Details
revision to appl #200905138322 - front stair & porch repair, w/structural detail. new siding & replace aluminum porch windows & replace wooden gate with wooden door on front of house. | $15,000 |
| Nov 24, 2008 | Completed final sign-off Feb 2009 | 2601 Union St | Keen Construction Incorporated | additional work to application #2008-10-20-4651; structural work in kitchen.Details
additional work to application #2008-10-20-4651; structural work in kitchen. | $2,500 |
| Sep 30, 2005 | Completed final sign-off Jul 2007 | 2311 Scott St | Keen Construction Incorporated | remodel new kitchen cabinets, pass through, replace range and oven.master bath:enlarge, relocate shower. tv room: relocate 1 wall. new hallway layout,relocate closet,rehang front door,new hardwood floors throughout except bathroom (tile), new lightingDetails
remodel new kitchen cabinets, pass through, replace range and oven.master bath:enlarge, relocate shower. tv room: relocate 1 wall. new hallway layout,relocate closet,rehang front door,new hardwood floors throughout except bathroom (tile), new lighting | $100,000 |
| Jul 31, 2002 | Completed final sign-off Aug 2002 | 1920 Broderick St | remove & replace exist shear component. disconnect & reconnect plumbing as required.Details
remove & replace exist shear component. disconnect & reconnect plumbing as required. | $2,500 |