Javier Mendoza
- Based in
- San Leandro
- On San Francisco permits
- Dec 2025 to Dec 2025
- Last 24 months
- 1 permit filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 23, 2025 | Completed final sign-off Jul 2026 | 290 Channel St | prop h: new coffee bar service counter, cafe fixtures & equipment incl. hand sink,dishwashing sink, offee equipment, refrigeration. upgrade hot water system w/ tank heater; 2 floor sinks.move/change/add elect branch ckts. install health code compliant finishes. change of occupancy from a-3 to a-2Details
prop h: new coffee bar service counter, cafe fixtures & equipment incl. hand sink,dishwashing sink, offee equipment, refrigeration. upgrade hot water system w/ tank heater; 2 floor sinks.move/change/add elect branch ckts. install health code compliant finishes. change of occupancy from a-3 to a-2 | $9,500 |