John Hulett Jones
- Listed as
- architect, authorized agent-others
- Firm
- Jones/Haydu
- Based in
- San Francisco
- On San Francisco permits
- Dec 2006 to Jun 2026
34 permits since 2000 (architect on 33 permits, authorized agent-others on 1 permit): 20 completed, 2 in progress, 5 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 28, 2026 | In progress issued Oct 2026 | 1325 11th Av | De Jong Construction | remodel (e) kitchen, bonus storage room and construct a new bathroom, laundry room, interior stairs and additoin of a new office under (e) 2nd story projection. demo includes removal of a portion of exterior walls, interior structural posts, exterior doors and windows, an interior partition walls..Details
remodel (e) kitchen, bonus storage room and construct a new bathroom, laundry room, interior stairs and additoin of a new office under (e) 2nd story projection. demo includes removal of a portion of exterior walls, interior structural posts, exterior doors and windows, an interior partition walls.. | $210,000 |
| Jun 3, 2026 | Completed final sign-off Sep 2026 | 2840 Broadway | Dowbuilt Inc. | interior addition of an unconditioned water closet in existing garage.Details
interior addition of an unconditioned water closet in existing garage. | $2,000 |
| Jun 26, 2025 | In progress issued Oct 2025 | 674 03rd Av | Mccowan Berrones & Company Llc | revision to pa 202409350153. previous facade was wood siding, as shown in goole earth images. permit is to install wood siding and details with elements shown (cornice, reshape upper bay winwow roof)Details
revision to pa 202409350153. previous facade was wood siding, as shown in goole earth images. permit is to install wood siding and details with elements shown (cornice, reshape upper bay winwow roof) | |
| Apr 15, 2025 | Completed final sign-off Apr 2026 | 2840 Broadway | Dowbuilt Inc. | replacement of (e) guardrail @ ground floor & roof and roof decking and removal of roof hot tubDetails
replacement of (e) guardrail @ ground floor & roof and roof decking and removal of roof hot tub | $50,000 |
| Jul 10, 2024 | Completed final sign-off May 2025 | 160 Bernard St | install ornamental metal panels & gate at fron facade per/as shown in original permit pa # 201706280572,Details
install ornamental metal panels & gate at fron facade per/as shown in original permit pa # 201706280572, | ||
| Apr 27, 2022 | Completed final sign-off Sep 2022 | 1325 11th Av | Diaz Construction | bathroom 1 - move sink vanity; add toilet; replace all fixtures; bathroom 2 - move partition wall; add sink; replace toilet; kitchen - replace refrigerator; replace hood (stove) and upgrade electrical and plumbing to codeDetails
bathroom 1 - move sink vanity; add toilet; replace all fixtures; bathroom 2 - move partition wall; add sink; replace toilet; kitchen - replace refrigerator; replace hood (stove) and upgrade electrical and plumbing to code | $21,000 |
| Oct 28, 2019 | Completed final sign-off Jun 2021 | 335 Diamond St | Jeff King And Company Inc | this is a revision to permit #2016-0317-2404 s1. changes to exterior materials & glazing configuration only.Details
this is a revision to permit #2016-0317-2404 s1. changes to exterior materials & glazing configuration only. | |
| Jun 21, 2019 | Completed final sign-off Jun 2021 | 335 Diamond St | Jeff King And Company Inc | reconfigure of sidewalk, planters and entry gates. addition of steps, one of which encroaches into public right of way. revision to app#201603172404(s1)Details
reconfigure of sidewalk, planters and entry gates. addition of steps, one of which encroaches into public right of way. revision to app#201603172404(s1) | |
| May 6, 2019 | Completed final sign-off Jun 2019 | 160 Bernard St | Barker-O'donoghue Master Bldrs | revistion to pa 201408133730 s1. title 24 changes only. elimination of qii.Details
revistion to pa 201408133730 s1. title 24 changes only. elimination of qii. | |
| Nov 9, 2018 | Never finaled filed Nov 2018, never issued | 199 Valmar Tr | addition of detached 3 story accessory dwelling unit to an existing two story house per ordinance 95-17Details
addition of detached 3 story accessory dwelling unit to an existing two story house per ordinance 95-17 | $300,000 | |
| May 30, 2018 | Completed final sign-off Jun 2019 | 160 Bernard St | Barker-O'donoghue Master Bldrs | revisionto 201408133730 s1 - skylight /roof hatch clarificationsDetails
revisionto 201408133730 s1 - skylight /roof hatch clarifications | |
| Jan 16, 2018 | Completed final sign-off Jun 2018 | 1234 10th Av | Double E D Construction Inc | revision to app#201711214474. revision scope for 3 new bathrooms.Details
revision to app#201711214474. revision scope for 3 new bathrooms. | $90,000 |
| Nov 7, 2017 | Expired or cancelled cancelled Jun 2020 | 1351 15th Av | interior remodel, partial demo, addition at rear. minor changes to front facade.Details
interior remodel, partial demo, addition at rear. minor changes to front facade. | $750,000 | |
| May 17, 2017 | Completed final sign-off Jun 2018 | 1234 10th Av | Double E D Construction Inc | accessibility upgrades to comply with cbc 11b. renovation of office and manager's unit, 6 new non-accessible bathrooms. landscape changes.Details
accessibility upgrades to comply with cbc 11b. renovation of office and manager's unit, 6 new non-accessible bathrooms. landscape changes. | $155,000 |
| Mar 17, 2016 | Completed final sign-off Jun 2021 | 335 Diamond St | Jeff King And Company Inc | horizontal addition at upper levels and addition of 963 s.f. of conditioned space. enlargement of garage & curb cut to accommodate 2nd parking space. remodel of (e) sfr. new doors, windows & exterior finishes. new site work (decks, stairs, gate & landscaping) to replace (e).Details
horizontal addition at upper levels and addition of 963 s.f. of conditioned space. enlargement of garage & curb cut to accommodate 2nd parking space. remodel of (e) sfr. new doors, windows & exterior finishes. new site work (decks, stairs, gate & landscaping) to replace (e). | $168,450 |
| Mar 18, 2015 | Never finaled issued Mar 2015, no final | 1160 Battery St | Source Planning And Construction Inc | revision to appl #2015.0108.5217 - removal of door at elevator, guardrail repair. n/a maher ordinanceDetails
revision to appl #2015.0108.5217 - removal of door at elevator, guardrail repair. n/a maher ordinance | |
| Aug 26, 2014 | Completed final sign-off Jan 2015 | 101 Greenwich St | Richlen Construction | revision to permit 201406027210; request by field inspector, added sheets a12.02 and a12.03; to clarify the removal of fire-proofing on the primary structural at the lobby only. maher n/aDetails
revision to permit 201406027210; request by field inspector, added sheets a12.02 and a12.03; to clarify the removal of fire-proofing on the primary structural at the lobby only. maher n/a | |
| Aug 13, 2014 | Completed final sign-off Jun 2019 | 160 Bernard St | Barker-O'donoghue Master Bldrs | erect 4 stories for 2 dwelling units.Details
erect 4 stories for 2 dwelling units. | $675,000 |
| Aug 13, 2014 | Completed final sign-off Jun 2019 | 160 Bernard St | Barker-O'donoghue Master Bldrs | demolish one story of private garageDetails
demolish one story of private garage | $1,000 |
| Aug 11, 2014 | Expired or cancelled cancelled Jan 2020 | 162 Bernard St | 2 story addition to (e) residence. 2 total units. interior alteration to (e) residence. unit# 1: 1 bedroom & 1 bath. unit# 2: 4 bedrooms & 2 baths. extend bldg to match adjacent front setback. new 2 car garag with lift. new driveway & curb cut.Details
2 story addition to (e) residence. 2 total units. interior alteration to (e) residence. unit# 1: 1 bedroom & 1 bath. unit# 2: 4 bedrooms & 2 baths. extend bldg to match adjacent front setback. new 2 car garag with lift. new driveway & curb cut. | $390,000 | |
| Jun 2, 2014 | Completed final sign-off Feb 2015 | 101 Greenwich St | Richlen Construction | ground floor lobby remodel of approx 1300 sf work consists of minor non-structural demo, construction of non-structural partitions, cabinetry finishes & furnishes, very minor mech & elect is part of scope & will be done design build & permitted separately, new storefront.n/a maher ordinance 155-13Details
ground floor lobby remodel of approx 1300 sf work consists of minor non-structural demo, construction of non-structural partitions, cabinetry finishes & furnishes, very minor mech & elect is part of scope & will be done design build & permitted separately, new storefront.n/a maher ordinance 155-13 | $250,000 |
| May 7, 2013 | Never finaled issued Jul 2013, no final | 2736 Bush St | Brellin Company | remove extg deck guardrails and replace with new wind guard guardrails. addtion of non enclosing screen walls at roof deck and master deck. replacement of extg exterior glass door. not visible from street.Details
remove extg deck guardrails and replace with new wind guard guardrails. addtion of non enclosing screen walls at roof deck and master deck. replacement of extg exterior glass door. not visible from street. | $3,000 |
| Mar 27, 2013 | Completed final sign-off Jul 2013 | 433 Kearny St | Northern Sun Associates | revision to app#201211154333. change delivery door from overhead hangar door to side opening self closing wall, landing at opening.Details
revision to app#201211154333. change delivery door from overhead hangar door to side opening self closing wall, landing at opening. | |
| Nov 15, 2012 | Completed final sign-off Jul 2013 | 433 Kearny St | Northern Sun Associates | interior work limited non structural improvements including lighting, electrical, plumbing, finishes, furnishings and equipment. exterior work includes paritial demo of concrete shear wal for new opening and structural concrete added to reinforce shearDetails
interior work limited non structural improvements including lighting, electrical, plumbing, finishes, furnishings and equipment. exterior work includes paritial demo of concrete shear wal for new opening and structural concrete added to reinforce shear | $95,000 |
| Jul 14, 2011 | Never finaled issued Jul 2011, no final | 1350 05th Av | 4 And 5 Construction, Inc | revision to pa #2010 0809 8339 to revise ab-005 and detail 13/a12.00 to remove fire retardant treated requirement for framing members, that is not required in cbc 705.11/ exception 5.1Details
revision to pa #2010 0809 8339 to revise ab-005 and detail 13/a12.00 to remove fire retardant treated requirement for framing members, that is not required in cbc 705.11/ exception 5.1 | |
| Aug 9, 2010 | Completed final sign-off Nov 2013 | 1350 05th Av | 4 And 5 Construction, Inc | demolition of one story portion @ rear. addition of 2 story @ rear, minor interior remodel. addition includes deck over 1st floor roof. mep under separate permit.Details
demolition of one story portion @ rear. addition of 2 story @ rear, minor interior remodel. addition includes deck over 1st floor roof. mep under separate permit. | $125,000 |
| Mar 24, 2010 | Completed final sign-off Sep 2010 | 1160 Battery St | replacing demolished (previous permit) non-structural interior partitions at building lobby including relocated electrical, new non-rated demising partition. interior work only, non structural work only.Details
replacing demolished (previous permit) non-structural interior partitions at building lobby including relocated electrical, new non-rated demising partition. interior work only, non structural work only. | $5,000 | |
| Jan 16, 2009 | Never finaled issued Jan 2009, no final | 1160 Battery St | interior demolition of non-structural walls per ab-017 at ground floor.Details
interior demolition of non-structural walls per ab-017 at ground floor. | $800 | |
| May 14, 2008 | Completed final sign-off Jul 2008 | 1485 Sansome St | office t.i., including ada compliant restroom and kitchenette, interior walls, and modifing entry door with a power door operator. mep-under separate permit.Details
office t.i., including ada compliant restroom and kitchenette, interior walls, and modifing entry door with a power door operator. mep-under separate permit. | $25,000 | |
| Dec 19, 2007 | Expired or cancelled expired Dec 2013 | 1890 Bryant St | occupant load calculation only. revision to app#200707318261. change of occ. b to a-3 (n) occ. total =87 occ.Details
occupant load calculation only. revision to app#200707318261. change of occ. b to a-3 (n) occ. total =87 occ. | ||
| Jul 31, 2007 | Expired or cancelled expired Dec 2013 | 1890 Bryant St | interior tenant improvement for existing cafe.new bar at grd floor. demo exist bar(s) new bar at lower level location, relocate of (e) interior ada lift, relocate (e)stair, new guardrail. converting (e) storage area into (n) food prep area & cupping area.Details
interior tenant improvement for existing cafe.new bar at grd floor. demo exist bar(s) new bar at lower level location, relocate of (e) interior ada lift, relocate (e)stair, new guardrail. converting (e) storage area into (n) food prep area & cupping area. | $40,000 | |
| Mar 30, 2007 | Expired or cancelled expired Mar 2009 | 1160 Battery St | interior only non structural demolition of interior vacant space.Details
interior only non structural demolition of interior vacant space. | $600 | |
| Jan 26, 2007 | Expired or cancelled expired Feb 2011 | 553 Grove St | Webbe Jones Joinery | interior remodel with some changes to wndw at rear and side. mechanical electrical and plmg to be design/build under separate permit. reconfigure partial fire repair (another permit) refer to previous permit 200607106114 and 200612190179Details
interior remodel with some changes to wndw at rear and side. mechanical electrical and plmg to be design/build under separate permit. reconfigure partial fire repair (another permit) refer to previous permit 200607106114 and 200612190179 | |
| Dec 22, 2006 | Expired or cancelled expired Nov 2009 | 1778 Quesada Av | demo (e) rear addition & rebuild. excavatepartial basement area. new occupied bedroom, bath laundry space at basement. rebuild rear addition within (e) footprint with enclosed space at basement, new room addition at second level. new interior stair. all mmechanical, elect./plumb. to be design/buildDetails
demo (e) rear addition & rebuild. excavatepartial basement area. new occupied bedroom, bath laundry space at basement. rebuild rear addition within (e) footprint with enclosed space at basement, new room addition at second level. new interior stair. all mmechanical, elect./plumb. to be design/build | $70,000 |