Jim Blackford
- Listed as
- authorized agent-others, contractor
- Firm
- Blackford Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Jan 2011
64 permits since 2000 (contractor on 64 permits, authorized agent-others on 1 permit): 50 completed, 3 never finaled, 11 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 19, 2011 | Completed final sign-off Apr 2011 | 52 Sonoma St | Blackford Construction | remove replace 1 kitchen cabinets and appliances light to comply with cec 150 k. no change in walls, windows and doors.Details
remove replace 1 kitchen cabinets and appliances light to comply with cec 150 k. no change in walls, windows and doors. | $10,000 |
| Jan 19, 2011 | Completed final sign-off Apr 2011 | 54 Sonoma St | Blackford Construction | remove replace 1 kitchen cabinets and appliances light to comply with cec 150 k. no change in walls, windows and doors.Details
remove replace 1 kitchen cabinets and appliances light to comply with cec 150 k. no change in walls, windows and doors. | $10,000 |
| Jul 2, 2010 | Completed final sign-off Jul 2010 | 2514 Green St | Blackford Construction | remove/replace in kind 6 concrete steps (entry) and concrete approach to front door, same location, same size, reinstall handrail, 4" thick concrete with #4 rebar @12" o.c. each way.Details
remove/replace in kind 6 concrete steps (entry) and concrete approach to front door, same location, same size, reinstall handrail, 4" thick concrete with #4 rebar @12" o.c. each way. | $2,400 |
| Jun 17, 2010 | Completed final sign-off Jun 2010 | 3558 17th St | Blackford Construction | remove and replace one stair stringer 10 ' long to comply with housing inspection requirements on rear stairs.Details
remove and replace one stair stringer 10 ' long to comply with housing inspection requirements on rear stairs. | $800 |
| Apr 22, 2010 | Completed final sign-off May 2010 | 601 Van Ness Av | Blackford Construction | unit #110: remove exisitng fiberglass tub in bathroom & replace with tile shower. change out plumbing jixtures (at shower). no window, no door, no new wall work on this permit.Details
unit #110: remove exisitng fiberglass tub in bathroom & replace with tile shower. change out plumbing jixtures (at shower). no window, no door, no new wall work on this permit. | $4,600 |
| Feb 5, 2010 | Completed final sign-off Mar 2010 | 601 Van Ness Av | Blackford Construction | unit#6: electrical upgrades: (n) gfci, low voltage. patching sheetrock, painting, new closet doors, new laminate floating floor & new base, new handrail.Details
unit#6: electrical upgrades: (n) gfci, low voltage. patching sheetrock, painting, new closet doors, new laminate floating floor & new base, new handrail. | $15,000 |
| Sep 2, 2009 | Completed final sign-off Oct 2009 | 173 Buena Vista East Av | Blackford Construction | unit #173 only -remodel bathroom - new electric plumbing, new electrical, new sheetrock & cement board, new tile. no new walls or wall removal.Details
unit #173 only -remodel bathroom - new electric plumbing, new electrical, new sheetrock & cement board, new tile. no new walls or wall removal. | $15,000 |
| Jul 10, 2009 | Completed final sign-off Sep 2009 | 2301 Harrison St | Blackford Construction | unit # 102: remove and replace kitchen cabinets with new countertop and backsplash. new electrical - existing plumbing to be used (non-structural/in-kind)Details
unit # 102: remove and replace kitchen cabinets with new countertop and backsplash. new electrical - existing plumbing to be used (non-structural/in-kind) | $14,000 |
| Feb 23, 2009 | Completed final sign-off May 2009 | 2514 Green St | Blackford Construction | remove tile at walls & floor. work in bathroom. remove only plaster & lath at walls. remove plumbing fixtures. install sheetrock and new rough plumbing. install new tile and finish plumbing. no electrical wiring but change out switch to motion control.Details
remove tile at walls & floor. work in bathroom. remove only plaster & lath at walls. remove plumbing fixtures. install sheetrock and new rough plumbing. install new tile and finish plumbing. no electrical wiring but change out switch to motion control. | $12,000 |
| Dec 11, 2008 | Completed final sign-off Feb 2009 | 462 Linden St | Blackford Construction | (confirm work on #464a only)revise pa# 2008/10/22/4850.install skylight in opening left by removal of old flu. install 2x4 skylight.remove flu. skylight not visible from st.it has metal self rimming curb,double plastic insulated, over 15' fr prop line.it serves skylight serves dining rm.Details
(confirm work on #464a only)revise pa# 2008/10/22/4850.install skylight in opening left by removal of old flu. install 2x4 skylight.remove flu. skylight not visible from st.it has metal self rimming curb,double plastic insulated, over 15' fr prop line.it serves skylight serves dining rm. | $800 |
| Nov 17, 2008 | Completed final sign-off Feb 2009 | 466 Linden St | Blackford Construction | replace 8 sheets of sheetrock at ceiling /repair water damage. replace electric heater 5/8 type x. with gas heater with direct vent.Details
replace 8 sheets of sheetrock at ceiling /repair water damage. replace electric heater 5/8 type x. with gas heater with direct vent. | $800 |
| Oct 22, 2008 | Completed final sign-off Feb 2009 | 464 Linden St | Blackford Construction | remove & replace plaster/sheetrock thru-out unit.new elec thru out.new plumb as req.new bathroom,new kitchen incl cabinets, new flooring. paint, casing & trim. add new insulation to outside walls & ceiling. windows & doors replace in kind as needed.Details
remove & replace plaster/sheetrock thru-out unit.new elec thru out.new plumb as req.new bathroom,new kitchen incl cabinets, new flooring. paint, casing & trim. add new insulation to outside walls & ceiling. windows & doors replace in kind as needed. | $42,000 |
| Oct 21, 2008 | Never finaled issued Oct 2008, no final | 1501 Folsom St | Blackford Construction | verify occupant load per fire department requests.Details
verify occupant load per fire department requests. | |
| Jul 31, 2008 | Completed final sign-off Oct 2008 | 1951 Turk St | Blackford Construction | remodel bath, new wiring, update plumbing, new sheetrock and tile, (new lighting occupant sensor), kitchen lighting least 50% lumens fluorescent, remodel kitchen, new wiring, update plumbing, new cabinets, new sheetrock, shorten 3 windows in lightwell, tile and coutnertops. no structural work.Details
remodel bath, new wiring, update plumbing, new sheetrock and tile, (new lighting occupant sensor), kitchen lighting least 50% lumens fluorescent, remodel kitchen, new wiring, update plumbing, new cabinets, new sheetrock, shorten 3 windows in lightwell, tile and coutnertops. no structural work. | $30,000 |
| Mar 27, 2008 | Completed final sign-off Jun 2008 | 1145 Lake St | Blackford Construction | work @ unit# 1145 (lower unit) only. install new electrical, plumbing as required. new cabinets in kitchen. install sheetrock. no structural. no new partitions. approx 12 x 15.Details
work @ unit# 1145 (lower unit) only. install new electrical, plumbing as required. new cabinets in kitchen. install sheetrock. no structural. no new partitions. approx 12 x 15. | $46,000 |
| Mar 7, 2008 | Completed final sign-off Apr 2008 | 2514 Green St | Blackford Construction | bathroom remodel. install new sheetrock/wonderboard, new tile, new lectrical, plumbing, fixtures. paint new lighting to be high efficacy or manual on auto off switch. no structural.Details
bathroom remodel. install new sheetrock/wonderboard, new tile, new lectrical, plumbing, fixtures. paint new lighting to be high efficacy or manual on auto off switch. no structural. | $13,000 |
| Oct 5, 2007 | Completed final sign-off Dec 2007 | 120 Moffitt St | Blackford Construction | bathroom addtion with in existing structure and addition of non bearing walls for bathroom and change use of storage room to bedroom.Details
bathroom addtion with in existing structure and addition of non bearing walls for bathroom and change use of storage room to bedroom. | $15,000 |
| May 16, 2007 | Completed final sign-off May 2007 | 1145 Lake St | Blackford Construction | correction notice. remove glass roof & frame above rear stairs that is connected to adjacent property.Details
correction notice. remove glass roof & frame above rear stairs that is connected to adjacent property. | $200 |
| Apr 10, 2007 | Completed final sign-off May 2007 | 1145 Lake St | Blackford Construction | comply with 3r-4717Details
comply with 3r-4717 | $2,500 |
| Dec 4, 2006 | Completed final sign-off Jan 2007 | 767 Bryant St | Blackford Construction | unit #403: remove/replace tile in (2) bathrooms, install 3 recessed lights and track lighting throughout, remove/replace shower/tub fixturesDetails
unit #403: remove/replace tile in (2) bathrooms, install 3 recessed lights and track lighting throughout, remove/replace shower/tub fixtures | $8,000 |
| Apr 3, 2006 | Completed final sign-off Jul 2006 | 1769 Broadway | Blackford Construction | bathroom remodel. remove replace toilet and vanity. install new tub/shower new tile and paint. new lighting.Details
bathroom remodel. remove replace toilet and vanity. install new tub/shower new tile and paint. new lighting. | $12,600 |
| Feb 24, 2006 | Expired or cancelled expired Dec 2011 | 614 Haight St | Blackford Construction | remove and replace 3 windows at front of house in kind. 2- 6x5, 1-3x5. remove/replace exterior casing and interior casing and jam as requiredDetails
remove and replace 3 windows at front of house in kind. 2- 6x5, 1-3x5. remove/replace exterior casing and interior casing and jam as required | $4,500 |
| Dec 28, 2005 | Expired or cancelled expired Aug 2007 | 665 03rd St | Blackford Construction | renew permit ref pa no 200401154104 & 200503298689 & 200306207318 for final inspections onlyDetails
renew permit ref pa no 200401154104 & 200503298689 & 200306207318 for final inspections only | |
| Dec 28, 2005 | Never finaled issued Dec 2005, no final | 665 03rd St | Blackford Construction | renew pa no 200307119247 for final insp on fire sprinkler on 5th floor t.i.Details
renew pa no 200307119247 for final insp on fire sprinkler on 5th floor t.i. | |
| Sep 27, 2005 | Completed final sign-off Mar 2006 | 743 Carolina St | Blackford Construction | remove and replace kchn cbnts/remove replace sheet rock in kchn/ install new elect and plumbingDetails
remove and replace kchn cbnts/remove replace sheet rock in kchn/ install new elect and plumbing | $24,800 |
| Mar 29, 2005 | Expired or cancelled expired Aug 2007 | 665 03rd St | Blackford Construction | renew app #200401154104/200306207318Details
renew app #200401154104/200306207318 | |
| Feb 16, 2005 | Completed final sign-off Jun 2005 | 636 20th St | Blackford Construction | change 2 steps back to rriginal, install handrail, barried removal work only under this permitDetails
change 2 steps back to rriginal, install handrail, barried removal work only under this permit | $1,000 |
| Feb 14, 2005 | Completed final sign-off Dec 2005 | 257 Romain St | Blackford Construction | remove replace appliances, bathrm, remove/repale tile, installshower door , remove/replaceDetails
remove replace appliances, bathrm, remove/repale tile, installshower door , remove/replace | $35,000 |
| Dec 3, 2004 | Completed final sign-off Jan 2005 | 3581 Sacramento St | Blackford Construction | removecrown molding, new ceiling jose, add insulation & sheetrock. reinstall crown molding.Details
removecrown molding, new ceiling jose, add insulation & sheetrock. reinstall crown molding. | $2,500 |
| Oct 25, 2004 | Completed final sign-off Nov 2004 | 2819 Laguna St | Blackford Construction | repair treads at front steps where damaged repair railing & newell posts (2)Details
repair treads at front steps where damaged repair railing & newell posts (2) | $1,350 |
| Oct 19, 2004 | Expired or cancelled cancelled Nov 2024 | 2819 Laguna St | Blackford Construction | repair treads at front stairs, wood stair repair where damaged, repair railings, newell posts, 2, reDetails
repair treads at front stairs, wood stair repair where damaged, repair railings, newell posts, 2, re | $1,350 |
| Jun 11, 2004 | Completed final sign-off Jul 2004 | 42 Terra Vista Av | Blackford Construction | repair/replace 2 4x4 posts at front stair/deck repair #4. comply n.o.v #200449380Details
repair/replace 2 4x4 posts at front stair/deck repair #4. comply n.o.v #200449380 | $400 |
| Jun 9, 2004 | Completed final sign-off Oct 2004 | 2819 Laguna St | Blackford Construction | remodel kitchen & bathroom.removel post & beam, upgrade elect & plumb.Details
remodel kitchen & bathroom.removel post & beam, upgrade elect & plumb. | $48,500 |
| May 26, 2004 | Completed final sign-off Oct 2004 | 2819 Laguna St | Blackford Construction | rev. to pa#2004/01/21/4447 - redesign staircase to codeDetails
rev. to pa#2004/01/21/4447 - redesign staircase to code | $7,000 |
| Mar 25, 2004 | Completed final sign-off Sep 2004 | 482 Bayview Cr | Blackford Construction | install a hottub on (e0 back yard. no plumbing, electrical work for power. deck/slab existingDetails
install a hottub on (e0 back yard. no plumbing, electrical work for power. deck/slab existing | $1,500 |
| Mar 16, 2004 | Completed final sign-off Jul 2004 | 143 Buena Vista East Av | Blackford Construction | remodel bathroom-new tub/shower, new vanity, new tile on walls and floorDetails
remodel bathroom-new tub/shower, new vanity, new tile on walls and floor | $14,650 |
| Feb 26, 2004 | Completed final sign-off Mar 2004 | 42 Terra Vista Av | Blackford Construction | dry rot repair-open up stucco at front of unit. remove/replace dry rotted framing and/or skathing, rDetails
dry rot repair-open up stucco at front of unit. remove/replace dry rotted framing and/or skathing, r | $6,000 |
| Jan 21, 2004 | Expired or cancelled expired Oct 2004 | 2819 Laguna St | Blackford Construction | remodel/replace siding at back of building (exterior t-111) remove/replace in kind 2 windows at backDetails
remodel/replace siding at back of building (exterior t-111) remove/replace in kind 2 windows at back | $25,000 |
| Dec 4, 2003 | Completed final sign-off Jan 2004 | 64 05th Av | Blackford Construction | corrections as per report of physical inspection app#3r-3805Details
corrections as per report of physical inspection app#3r-3805 | $1,800 |
| Oct 2, 2003 | Completed final sign-off Dec 2003 | 1609 Baker St | Blackford Construction | to renew app#2003/02/12/7287 & 2003/02/06/6827 for final inspection.Details
to renew app#2003/02/12/7287 & 2003/02/06/6827 for final inspection. | |
| Jun 25, 2003 | Completed final sign-off Dec 2003 | 64 05th Av | Blackford Construction | new kitchen, new master bath, new guest bath, remove non-bearing wall in living roomDetails
new kitchen, new master bath, new guest bath, remove non-bearing wall in living room | $102,500 |
| Jun 24, 2003 | Completed final sign-off Sep 2003 | 1769 Broadway | Blackford Construction | remove extng cabinets. install new cabinets countertop. upgrade electrical. move sink plumbingDetails
remove extng cabinets. install new cabinets countertop. upgrade electrical. move sink plumbing | $18,000 |
| Apr 23, 2003 | Completed final sign-off May 2003 | 1613 Baker St | Blackford Construction | remove & replace cabinets(kitchen)new counter top,electrical & plumbing to code.remove & replaceDetails
remove & replace cabinets(kitchen)new counter top,electrical & plumbing to code.remove & replace | $14,300 |
| Mar 21, 2003 | Completed final sign-off Apr 2003 | 1613 Baker St | Blackford Construction | remove & replace rotted treads & risers at front stair (outside). no structural work (stringers). noDetails
remove & replace rotted treads & risers at front stair (outside). no structural work (stringers). no | $1,625 |
| Feb 26, 2003 | Completed final sign-off May 2003 | 4733 18th St | Blackford Construction | remove 3 winodws verify continuous 4x8 header install new window.Details
remove 3 winodws verify continuous 4x8 header install new window. | $3,500 |
| Feb 12, 2003 | Expired or cancelled expired Dec 2003 | 1609 Baker St | Blackford Construction | revision to app 200302066827 install ceiling joist and sheetrock, pipe column thickness called outDetails
revision to app 200302066827 install ceiling joist and sheetrock, pipe column thickness called out | $1,800 |
| Feb 6, 2003 | Expired or cancelled expired Dec 2003 | 1609 Baker St | Blackford Construction | remove exiting kitchen wall-install glu lam to support 2nd fl & ceiling and sheetrock per plans.Details
remove exiting kitchen wall-install glu lam to support 2nd fl & ceiling and sheetrock per plans. | $12,500 |
| Jan 28, 2003 | Completed final sign-off Mar 2003 | 3633 Webster St | Blackford Construction | renew permit app 967961-for final inspection-200205317966Details
renew permit app 967961-for final inspection-200205317966 | |
| Dec 9, 2002 | Never finaled issued Dec 2002, no final | 3562 17th St | Blackford Construction | renew 2002/07/30/2622 comply with his nov 200229835.Details
renew 2002/07/30/2622 comply with his nov 200229835. | $4,000 |
| Aug 26, 2002 | Completed final sign-off Mar 2003 | 3633 Webster St | Blackford Construction | conncect 1st flr & 2nd flr as one unit(add spiral staircase)increase construction costs from $5,000Details
conncect 1st flr & 2nd flr as one unit(add spiral staircase)increase construction costs from $5,000 | $10,000 |
| Jul 25, 2002 | Completed final sign-off Dec 2002 | 1388 Gough St | Blackford Construction | kitchen and bath remodelDetails
kitchen and bath remodel | $42,000 |
| Jun 21, 2002 | Completed final sign-off Aug 2002 | 3186 Clay St | Blackford Construction | renew permit app 200101089406-for final inspectionDetails
renew permit app 200101089406-for final inspection | |
| Apr 23, 2002 | Expired or cancelled expired Aug 2002 | 171 Buena Vista East Av | Blackford Construction | rev -show flr plan pa 200203040557-revise from 6 windows to 4 windows, two vis from streetDetails
rev -show flr plan pa 200203040557-revise from 6 windows to 4 windows, two vis from street | |
| Mar 4, 2002 | Completed final sign-off Mar 2002 | 1611 Baker St | Blackford Construction | repair dry-rot atfrom stairs/rear deck railingDetails
repair dry-rot atfrom stairs/rear deck railing | $5,000 |
| Mar 4, 2002 | Completed final sign-off Apr 2002 | 171 Buena Vista East Av | Blackford Construction | install double pane glass at 6 windows same size and location/not visible from the street/instl shtrDetails
install double pane glass at 6 windows same size and location/not visible from the street/instl shtr | $10,500 |
| Dec 10, 2001 | Completed final sign-off Mar 2002 | 1611 Baker St | Blackford Construction | kitchen add lighting.remove/repace cabinets.exterior repair dryrot at front stairs. new sheetrock/neDetails
kitchen add lighting.remove/repace cabinets.exterior repair dryrot at front stairs. new sheetrock/ne | $42,000 |
| Jan 8, 2001 | Expired or cancelled expired Feb 2002 | 3186 Clay St | Blackford Construction | electrical demo/add 7 new recessed lights. remove.replace kitchen cabinets, new counter top & back sDetails
electrical demo/add 7 new recessed lights. remove.replace kitchen cabinets, new counter top & back s | $9,850 |
| Jun 13, 2000 | Expired or cancelled expired Oct 2000 | 1479 41st Av | Blackford Construction | remove/replace dryrot at existing balcony/deck at front of bldg & any support members, patch stuccoDetails
remove/replace dryrot at existing balcony/deck at front of bldg & any support members, patch stucco | $1,675 |
| May 23, 2000 | Expired or cancelled expired Feb 2001 | 1479 41st Av | Blackford Construction | termite workDetails
termite work | $9,500 |
| Apr 25, 2000 | Completed final sign-off Apr 2000 | 135 Buena Vista Tr | Blackford Construction | renew 9910672 and 9926555Details
renew 9910672 and 9926555 | |
| Feb 22, 2000 | Completed final sign-off May 2000 | 135 Buena Vista East Av | Blackford Construction | install new flu for gas heaters units 2,3,4, (stacked)Details
install new flu for gas heaters units 2,3,4, (stacked) | |
| Feb 22, 2000 | Completed final sign-off Apr 2000 | 135 Buena Vista East Av | Blackford Construction | remove/replace kitchen cabinets,some electrical upgrade,some plbg upgrade at unit #5Details
remove/replace kitchen cabinets,some electrical upgrade,some plbg upgrade at unit #5 | |
| Feb 22, 2000 | Completed final sign-off Apr 2000 | 135 Buena Vista East Av | Blackford Construction | remove & replace kitchen cabinets electrical upgrade plbg upgrade,repalce fireplace flu at unit #1Details
remove & replace kitchen cabinets electrical upgrade plbg upgrade,repalce fireplace flu at unit #1 | |
| Jan 13, 2000 | Completed final sign-off Apr 2000 | 135 Buena Vista East Av | Blackford Construction | #3 bathroom sheetrock, plumbingDetails
#3 bathroom sheetrock, plumbing | $8,000 |