Jeffrey S. Fitch
- Listed as
- architect, designer, engineer
- Firm
- Sfa Design Group Llc
- Based in
- Tigard
- On San Francisco permits
- Aug 2012 to Sep 2026
55 permits since 2000 (engineer on 48 permits, architect on 6 permits, designer on 1 permit): 28 completed, 17 in progress, 5 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 9, 2026 | In progress issued Sep 2026 | 353 Rivera St | Smp Construction & Maintenance Inc | revision to pa 202601234425, 202602105600, 202602206224, 202603197892 the only changes on this revision is the verbage on sheet s2.1 stating the max distance from 6ft to 8ft we are also adding 33 helical piers to the project, and seismic upgrade of the building.Details
revision to pa 202601234425, 202602105600, 202602206224, 202603197892 the only changes on this revision is the verbage on sheet s2.1 stating the max distance from 6ft to 8ft we are also adding 33 helical piers to the project, and seismic upgrade of the building. | |
| Aug 13, 2026 | In progress issued Aug 2026 | 4320 18th St | Smp Construction & Maintenance Llc | revision to app #202607144970 to add 4 smart jacks with 4 cast in place footings and #16ft of supplimental beams. all other scopes of work will remain the same.Details
revision to app #202607144970 to add 4 smart jacks with 4 cast in place footings and #16ft of supplimental beams. all other scopes of work will remain the same. | $3,670 |
| Jul 17, 2026 | In progress filed Jul 2026, not yet issued | 15 Macondray Ln | Smp Construction & Maintenance Inc | voluntary foundation repir, sectional foundation remove and replacement, voluntary crawl space drainage.Details
voluntary foundation repir, sectional foundation remove and replacement, voluntary crawl space drainage. | $31,877 |
| Jul 14, 2026 | In progress issued Jul 2026 | 4320 18th St | Smp Construction & Maintenance Inc | voluntary floor support stabilize the floor system above where smart jacks are installed. voluntary crawl space drainage with hydraway drainage and smart sump pumpDetails
voluntary floor support stabilize the floor system above where smart jacks are installed. voluntary crawl space drainage with hydraway drainage and smart sump pump | $13,827 |
| Jun 25, 2026 | In progress filed Jun 2026, not yet issued | 215 Foerster St | Smp Construction & Maintenance Inc | voluntary foundation repair. stabilize the foundation where push piers are installedDetails
voluntary foundation repair. stabilize the foundation where push piers are installed | $17,422 |
| Apr 23, 2026 | In progress issued Oct 2026 | 505 Diamond St | Smp Construction & Maintenance Inc | construct basement wall and make crawlspace area habitable with new bedroom, bathroom, family room, and laundry. excavation and new retaining walls. rebuild back deck to new concrete deck.Details
construct basement wall and make crawlspace area habitable with new bedroom, bathroom, family room, and laundry. excavation and new retaining walls. rebuild back deck to new concrete deck. | $31,775 |
| Mar 31, 2026 | Completed final sign-off Apr 2026 | 1047 Shrader St | Smp Construction & Maintenance Inc | add (1) new footing for deck support at rear of home.Details
add (1) new footing for deck support at rear of home. | $700 |
| Mar 19, 2026 | In progress issued Mar 2026 | 353 Rivera St | Smp Construction & Maintenance Inc | revision to pa #202601234425,202602105600,202602206224.we will be adding 5 push piers with 5 pier spacers as shown on sheets s2.1, s4.3 & s4.4 there will be 6 push piers in total.Details
revision to pa #202601234425,202602105600,202602206224.we will be adding 5 push piers with 5 pier spacers as shown on sheets s2.1, s4.3 & s4.4 there will be 6 push piers in total. | |
| Mar 13, 2026 | In progress issued Mar 2026 | 1047 Shrader St | Smp Construction & Maintenance Inc | voluntary floor support stabilize floor system above where the smart jacks are installedDetails
voluntary floor support stabilize floor system above where the smart jacks are installed | $4,513 |
| Feb 20, 2026 | In progress issued Feb 2026 | 353 Rivera St | Smp Construction & Maintenance Inc | revision to pa 202601234425, 202602105600 this revision consists of adding drainage to the project as shown on sheets 2.1. we are also doing 10 ft extra foundation replacementDetails
revision to pa 202601234425, 202602105600 this revision consists of adding drainage to the project as shown on sheets 2.1. we are also doing 10 ft extra foundation replacement | $5,910 |
| Feb 10, 2026 | In progress issued Aug 2026 | 3723 Market St | Smp Construction & Maintenance Inc | voluntary foundation repair. stablize foundation where piers are installed.Details
voluntary foundation repair. stablize foundation where piers are installed. | $15,607 |
| Jan 28, 2026 | In progress filed Jan 2026, not yet issued | 17 Hodges Al | Smp Construction & Maintenance Inc | revision to pa 202509306367 this revision consists of changing the wood beam size from 2x10 to 2x12 shown on sheet s2.1Details
revision to pa 202509306367 this revision consists of changing the wood beam size from 2x10 to 2x12 shown on sheet s2.1 | |
| Jan 7, 2026 | In progress filed Jan 2026, not yet issued | 645 Colby St | Smp Construction & Maintenance Inc | voluntary foundation repair for stabilization to adjacent neighboring property installing piers.Details
voluntary foundation repair for stabilization to adjacent neighboring property installing piers. | $22,840 |
| Jan 7, 2026 | In progress filed Jan 2026, not yet issued | 651 Colby St | Smp Construction & Maintenance Inc | voluntary foundation repair. stabilize foundation where piers are installedDetails
voluntary foundation repair. stabilize foundation where piers are installed | $22,844 |
| Nov 14, 2025 | In progress issued Nov 2025 | 139 Byxbee St | Smp Construction & Maintenance Inc | revision to 20250903431. relocating e 3 smart jackes as shown pg s2.1. adding horizontal crack repair with carbon armour as shown sheet s2.1. adding 8 spacers to each push pier as shown on sheet s4.3.4 ft total of crack repair,2 ft ea crackDetails
revision to 20250903431. relocating e 3 smart jackes as shown pg s2.1. adding horizontal crack repair with carbon armour as shown sheet s2.1. adding 8 spacers to each push pier as shown on sheet s4.3.4 ft total of crack repair,2 ft ea crack | $1,928 |
| Nov 10, 2025 | In progress issued Nov 2025 | 17 Hodges Al | Smp Construction & Maintenance Inc | this is a revision to pa#2025-0930-6397 (2) 2 x12 wood beam s2.1Details
this is a revision to pa#2025-0930-6397 (2) 2 x12 wood beam s2.1 | |
| Sep 30, 2025 | In progress issued Nov 2025 | 17 Hodges Al | Smp Construction & Maintenance Inc | revision to pa 202508062472 adding 4 smart jacks to the project with new footingDetails
revision to pa 202508062472 adding 4 smart jacks to the project with new footing | $1,639 |
| Sep 3, 2025 | Completed final sign-off Nov 2025 | 139 Byxbee St | Smp Construction & Maintenance Inc | voluntary foundation repair. stabilize foundation where piers are installed. voluntary floor support. stabilize floor system where smart jacks are installed.Details
voluntary foundation repair. stabilize foundation where piers are installed. voluntary floor support. stabilize floor system where smart jacks are installed. | $21,870 |
| Jul 25, 2025 | Completed final sign-off Oct 2025 | 1907 17th Av | Smp Construction & Maintenance Inc | voluntary removal and replacement of a portion of a perimiter foundation for a sfr.Details
voluntary removal and replacement of a portion of a perimiter foundation for a sfr. | $35,000 |
| Jul 16, 2025 | Completed final sign-off Jul 2025 | 1548 Greenwich St | Smp Construction & Maintenance Inc | revision to pa #202412247372. this revision is removing 1 smart jack and 1 cast in place footing.Details
revision to pa #202412247372. this revision is removing 1 smart jack and 1 cast in place footing. | $54,502 |
| May 12, 2025 | Completed final sign-off Aug 2025 | 28 Agua Wy | Smp Construction & Maintenance Inc | voluntary foundation repair stabilize foundation where piers are installed. 20 push piers total.Details
voluntary foundation repair stabilize foundation where piers are installed. 20 push piers total. | $30,567 |
| Apr 23, 2025 | In progress issued May 2025 | 505 Diamond St | Smp Construction & Maintenance Inc | removal and replacement of rear wall foundation stem wall (not exceeding 2 feet measured from adjacent grade to new concrete slab on grade) including waterproofing and drainage provisions. repair in kind of dryrot wood wall. no other work proposed.new 4" concrete slab on grade(700 sq ft)Details
removal and replacement of rear wall foundation stem wall (not exceeding 2 feet measured from adjacent grade to new concrete slab on grade) including waterproofing and drainage provisions. repair in kind of dryrot wood wall. no other work proposed.new 4" concrete slab on grade(700 sq ft) | $28,775 |
| Apr 21, 2025 | Completed final sign-off May 2025 | 63 Winfield St | Smp Construction & Maintenance Inc | revision 202504043758- adding 3 additional piers on the right side of garage.Details
revision 202504043758- adding 3 additional piers on the right side of garage. | |
| Apr 11, 2025 | Completed final sign-off Jan 2026 | 234 Athens St | Smp Construction & Maintenance Inc | voluntary foundation repair. stabillize foundation where piers are installed.Details
voluntary foundation repair. stabillize foundation where piers are installed. | $6,400 |
| Feb 28, 2025 | Completed final sign-off Jul 2025 | 1548 Greenwich St | Smp Construction & Maintenance Inc | revision to pa 2024-1224-7372 to remove 3 concrete pile cap footings, 1 smartjack, 1 cast in place footing, and 9 helical piers. adding 10 crawl space piers.Details
revision to pa 2024-1224-7372 to remove 3 concrete pile cap footings, 1 smartjack, 1 cast in place footing, and 9 helical piers. adding 10 crawl space piers. | |
| Feb 13, 2025 | Completed final sign-off Oct 2025 | 6 Nottingham Pl | Smp Construction & Maintenance Inc | voluntary floor leveling/support including the installation of (7) "smart jacks" supported by new, new cast in place, isolated pad footings.Details
voluntary floor leveling/support including the installation of (7) "smart jacks" supported by new, new cast in place, isolated pad footings. | $5,573 |
| Dec 24, 2024 | Completed final sign-off Jul 2025 | 1548 Greenwich St | Smp Construction & Maintenance Inc | voluntary foundation repair stabilize foundation where piers are installedDetails
voluntary foundation repair stabilize foundation where piers are installed | $63,385 |
| Dec 20, 2024 | Completed final sign-off Jun 2025 | 118 Stillings Av | Smp Construction & Maintenance Inc | voluntary foundation stabilization where piers are installed.Details
voluntary foundation stabilization where piers are installed. | $18,595 |
| Nov 6, 2024 | Completed final sign-off Jan 2025 | 1 Grand View Av | Smp Construction & Maintenance Inc | stablize foundation where piers are installed, 3 pier locations.Details
stablize foundation where piers are installed, 3 pier locations. | $6,150 |
| Jun 21, 2024 | Completed final sign-off Aug 2024 | 465 Colon Av | Valentine Corporation, Smp Construction & Maintenance Inc | voluntary foundation repair by stabilizing foundation where push piers are installedDetails
voluntary foundation repair by stabilizing foundation where push piers are installed | $15,000 |
| Aug 4, 2023 | Completed final sign-off Sep 2024 | 3 Castro St | Smp Construction & Maintenance Inc | revision to 202303274438. change details on pages s4.1 and s4.2.Details
revision to 202303274438. change details on pages s4.1 and s4.2. | |
| Mar 27, 2023 | Completed final sign-off Sep 2024 | 3 Castro St | Smp Construction & Maintenance Inc | crack repair w/carbon armor; foundation segment replacement foundation stabilizationDetails
crack repair w/carbon armor; foundation segment replacement foundation stabilization | $16,022 |
| Oct 20, 2021 | Never finaled issued Oct 2021, no final | 170 Madrone Av | Smp Construction & Maintenance Inc | revision to app#202101072253 for foundation repair.Details
revision to app#202101072253 for foundation repair. | $3,671 |
| Jul 15, 2021 | Never finaled issued Aug 2021, no final | 181 Graystone Tr | Smp Construction & Maintenance Inc | revision to pa 201809180632. foundation repair and underpinning.Details
revision to pa 201809180632. foundation repair and underpinning. | $18,925 |
| Mar 29, 2021 | Completed final sign-off Feb 2022 | 90 Westgate Dr | Smp Construction & Maintenance Inc | voluntary underpinning. install 11 piers to stabilize the existing foundation.Details
voluntary underpinning. install 11 piers to stabilize the existing foundation. | $32,879 |
| Jan 7, 2021 | Never finaled issued Feb 2021, no final | 2487 43rd Av | Smp Construction & Maintenance Inc | voluntary foundation replacement, total 27 sfDetails
voluntary foundation replacement, total 27 sf | $18,000 |
| Jan 7, 2021 | Completed final sign-off Nov 2021 | 170 Madrone Av | Smp Construction & Maintenance Inc | voluntary foundation replacementDetails
voluntary foundation replacement | $17,000 |
| Nov 10, 2020 | Expired or cancelled cancelled Jan 2026 | 556 Congo St | Smp Construction & Maintenance Inc | voluntary concrete steps and landing construction at front, and retaining wall at left side of the bldg. comply w/ comments under pa 202009144168: file new permit for additional retaining wall and concrete steps.Details
voluntary concrete steps and landing construction at front, and retaining wall at left side of the bldg. comply w/ comments under pa 202009144168: file new permit for additional retaining wall and concrete steps. | $10,000 |
| Nov 10, 2020 | Completed final sign-off May 2023 | 870 Kansas St | Smp Construction & Maintenance Inc | voluntary underpinning: install 20 piers to stabilize existing foundation.Details
voluntary underpinning: install 20 piers to stabilize existing foundation. | $25,000 |
| Sep 14, 2020 | Expired or cancelled cancelled Jan 2026 | 556 Congo St | Smp Construction & Maintenance Inc | revision to pa's 202003126872 & 201908128510. change smartjack size to 7 ft high. added retaining wall on left side of home. added concrete steps and wallway to righ side.Details
revision to pa's 202003126872 & 201908128510. change smartjack size to 7 ft high. added retaining wall on left side of home. added concrete steps and wallway to righ side. | $5,000 |
| Feb 12, 2020 | Completed final sign-off Feb 2021 | 253 05th Av | Smp Construction & Maintenance Inc | rev to pa# 201912129379; remove retaining wall from previous plansDetails
rev to pa# 201912129379; remove retaining wall from previous plans | $2,000 |
| Jan 3, 2020 | Completed final sign-off May 2020 | 116 Broad St | Smp Construction & Maintenance Inc | "this permit is for work to be performed in general conformance with the california existing building code (cebc), appendix chapter a3 (sfbc ab-1 08) voluntary brace and bolt retrofit to crawl space.Details
"this permit is for work to be performed in general conformance with the california existing building code (cebc), appendix chapter a3 (sfbc ab-1 08) voluntary brace and bolt retrofit to crawl space. | $8,000 |
| Dec 12, 2019 | Completed final sign-off Feb 2021 | 253 05th Av | Smp Construction & Maintenance Inc | revision to app#201908068013 for additional foundation replacement.Details
revision to app#201908068013 for additional foundation replacement. | $5,000 |
| Aug 6, 2019 | Completed final sign-off Feb 2021 | 253 05th Av | Smp Construction & Maintenance Inc | voluntary underpinning (7 push pipes) and partial foundation replacement.Details
voluntary underpinning (7 push pipes) and partial foundation replacement. | $19,000 |
| Sep 18, 2018 | Completed final sign-off Apr 2022 | 181 Graystone Tr | Smp Construction & Maintenance Inc | foundation stabilization by installtion of 18 push piers.Details
foundation stabilization by installtion of 18 push piers. | $51,000 |
| Jul 28, 2017 | Never finaled issued Jul 2017, no final | 741 Teresita Bl | Smp Construction & Maintenance Inc | support the existing foundation with the push pier system.Details
support the existing foundation with the push pier system. | $10,000 |
| Mar 3, 2017 | Completed final sign-off Jun 2017 | 1201 Palou Av | Smp Construction & Maintenance Inc | support existing foundation with the push pier systemDetails
support existing foundation with the push pier system | $14,500 |
| Dec 9, 2016 | Expired or cancelled withdrawn Sep 2017 | 145 Colby St | Smp Construction & Maintenance Inc | support existing foundation with the push pier systemDetails
support existing foundation with the push pier system | $15,000 |
| Aug 5, 2016 | Never finaled issued Aug 2016, no final | 374 Ewing Tr | Smp Construction & Maintenance Inc | replace 3 footings at 1st floor.Details
replace 3 footings at 1st floor. | $4,000 |
| Jul 11, 2016 | Expired or cancelled cancelled Jan 2020 | 395 Teddy Av | support existing foundation with the push pier system.Details
support existing foundation with the push pier system. | $10,000 | |
| Jan 25, 2016 | Expired or cancelled expired Jan 2019 | 24 Costa St | Smp Construction & Maintenance Inc | support existing foundation with repour of new concrete.Details
support existing foundation with repour of new concrete. | $68,000 |
| Aug 26, 2015 | Completed final sign-off Oct 2015 | 919 South Van Ness Av | Smp Construction & Maintenance Inc | revision 2014-1029-0229 to install new 10' grounding wire with 30' copper wire cast into new footing.Details
revision 2014-1029-0229 to install new 10' grounding wire with 30' copper wire cast into new footing. | $8,000 |
| Nov 21, 2014 | Completed final sign-off Jan 2016 | 2246 42nd Av | Smp Construction & Maintenance Inc | support exising foundation thru the push pier system per plan.Details
support exising foundation thru the push pier system per plan. | $48,000 |
| Oct 29, 2014 | Completed final sign-off Oct 2015 | 919 South Van Ness Av | Smp Construction & Maintenance Inc | concrete job only for foundation upgrade.Details
concrete job only for foundation upgrade. | $18,500 |
| Aug 9, 2012 | Completed final sign-off Oct 2012 | 195 Urbano Dr | Smp Construction & Maintenance Inc | install foundation underpining @ west & south side of house.Details
install foundation underpining @ west & south side of house. | $24,000 |