Smp Construction & Maintenance Llc
- Based in
- Livermore
- On San Francisco permits
- Aug 2026 to Nov 2026
- Last 24 months
- 7 permits filed
7 permits since 2000: 7 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 4
- Multi-family (2-family, apartments) 3
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 2, 2026 | In progress filed Nov 2026, not yet issued | 505 Diamond St | rev to pa# 2025-1219-2237: adding voluntary foundation replacement. sectional removal and replacement of the foundation.Details
rev to pa# 2025-1219-2237: adding voluntary foundation replacement. sectional removal and replacement of the foundation. | $18,903 |
| Oct 28, 2026 | In progress filed Oct 2026, not yet issued | 69 Coleridge St | voluntary foundation replacement. sectional removal & replacement of the foundation. voluntary floor support. stabilize the floor system above where smart jacks are installed. voluntary foundation repair. stabelize foundation where helical tiebacks are installed. voluntary drainage with hydrawayDetails
voluntary foundation replacement. sectional removal & replacement of the foundation. voluntary floor support. stabilize the floor system above where smart jacks are installed. voluntary foundation repair. stabelize foundation where helical tiebacks are installed. voluntary drainage with hydraway | $9,036 |
| Oct 14, 2026 | In progress issued Oct 2026 | 1415 23rd Av | voluntary exterior drainage to install a trench drain, voluntary interior drainage to install a super sump pump & water guard drainage. in the front of the property.Details
voluntary exterior drainage to install a trench drain, voluntary interior drainage to install a super sump pump & water guard drainage. in the front of the property. | $9,469 |
| Oct 13, 2026 | In progress issued Oct 2026 | 353 Rivera St | revision to pa# 202601234425, 202602105600, 202602206224, 202603197892, 202604028751: this revision consists of doing foundation replacement.Details
revision to pa# 202601234425, 202602105600, 202602206224, 202603197892, 202604028751: this revision consists of doing foundation replacement. | |
| Oct 9, 2026 | In progress issued Oct 2026 | 2562 29th Av | voluntary retaining wall repair. stabilize the retaining wall where geo lock wall anchors are installed. voluntary retaining wall repair. stabilize retaining wall where push piers are installed.Details
voluntary retaining wall repair. stabilize the retaining wall where geo lock wall anchors are installed. voluntary retaining wall repair. stabilize retaining wall where push piers are installed. | $11,536 |
| Oct 9, 2026 | In progress issued Oct 2026 | 2566 29th Av | voluntary retaining wall repair. stabilize the retaining wall where geo lock wall anchars are installed. voluntaring retaining wall repair. stabilize retainnig wall where push piers are installed.Details
voluntary retaining wall repair. stabilize the retaining wall where geo lock wall anchars are installed. voluntaring retaining wall repair. stabilize retainnig wall where push piers are installed. | $11,536 |
| Aug 13, 2026 | In progress issued Aug 2026 | 4320 18th St | revision to app #202607144970 to add 4 smart jacks with 4 cast in place footings and #16ft of supplimental beams. all other scopes of work will remain the same.Details
revision to app #202607144970 to add 4 smart jacks with 4 cast in place footings and #16ft of supplimental beams. all other scopes of work will remain the same. | $3,670 |