Block 5933, lot 026
145 Colby St
- City’s use
- Single Family Residential
- Built
- 1951
- Stories
- 1
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 1,335 sq ft
- Lot
- 3,000 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 2, 2017 | Completed final sign-off Mar 2017 | 145 Colby St | revision to pa#2015-1005-8820. remove illegal kitchen & legalize bath in garage. revision pa#2016 1031 1554 relocate (e) full bath at garage. revision #2016 1214 5001 remodel kitchen & bath 2nd fl walls to remain. revision pa#2017 0120 7613 change studio room to bedroom change window & doorDetails
revision to pa#2015-1005-8820. remove illegal kitchen & legalize bath in garage. revision pa#2016 1031 1554 relocate (e) full bath at garage. revision #2016 1214 5001 remodel kitchen & bath 2nd fl walls to remain. revision pa#2017 0120 7613 change studio room to bedroom change window & door | $50,000 | |
| Jan 20, 2017 | Completed final sign-off Mar 2017 | 145 Colby St | revision to app#201610311554 to change lower level studio room to bedroom. change window in rear to sliding door, replace storage window.Details
revision to app#201610311554 to change lower level studio room to bedroom. change window in rear to sliding door, replace storage window. | ||
| Dec 14, 2016 | Completed final sign-off Mar 2017 | 145 Colby St | B W H Builder Inc. | renovation of kitchen and bathroom at 2nd floor. no walls to be removed and all appliances keep as same locationsDetails
renovation of kitchen and bathroom at 2nd floor. no walls to be removed and all appliances keep as same locations | $40,000 |
| Dec 9, 2016 | Expired or cancelled withdrawn Sep 2017 | 145 Colby St | Smp Construction & Maintenance Inc | support existing foundation with the push pier systemDetails
support existing foundation with the push pier system | $15,000 |
| Oct 31, 2016 | Completed final sign-off Mar 2017 | 145 Colby St | revision to permit 201510058820 to relocate existing full bath at garage level.Details
revision to permit 201510058820 to relocate existing full bath at garage level. | $10,000 | |
| Oct 5, 2015 | Completed final sign-off Mar 2017 | 145 Colby St | Tom Can Construction | remove illegal kitchen @ garage level. legalize full bath. convert to storage at illegal kitchen area.Details
remove illegal kitchen @ garage level. legalize full bath. convert to storage at illegal kitchen area. | $10,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.