Jeff Williams
- Listed as
- architect, engineer
- Firm
- Paradigm Structural Engineers
- Based in
- San Francisco
- On San Francisco permits
- May 2004 to Oct 2025
27 permits since 2000 (engineer on 25 permits, architect on 2 permits): 23 completed, 3 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 23, 2025 | Completed final sign-off Aug 2026 | 2620 Jones St | Emcor Services/Mesa Energy Systems Inc | removed and replace 4 roof top units with lite electrical and condensate drain. unit mau-1, mau-2, mau-3, mau-4Details
removed and replace 4 roof top units with lite electrical and condensate drain. unit mau-1, mau-2, mau-3, mau-4 | $200,000 |
| Aug 7, 2023 | Completed final sign-off Jun 2025 | 614 Eugenia Av | Andrew Chekene Enterprises/ Dba Ac Enter | remove approx. 1,000sf osf (e) siding on side and rear elevation. framing repairs on side elevation. install approx. 1,000sf of sheerwall on side and rear elevation wall. remove and replace 3 windows and 2 doors on side elevation. install new cedar trim, and cedar lap siding on side and rear.Details
remove approx. 1,000sf osf (e) siding on side and rear elevation. framing repairs on side elevation. install approx. 1,000sf of sheerwall on side and rear elevation wall. remove and replace 3 windows and 2 doors on side elevation. install new cedar trim, and cedar lap siding on side and rear. | $35,000 |
| Aug 26, 2022 | Completed final sign-off Apr 2025 | 618 Eugenia Av | Andrew Chekene Enterprises/ Dba Ac Enter | rev to pa# 2022-0526-5048 and pa# 2021-0123-3203: install approx 40'l.f. of shoring along the center of the house on basement (front)Details
rev to pa# 2022-0526-5048 and pa# 2021-0123-3203: install approx 40'l.f. of shoring along the center of the house on basement (front) | $3,500 |
| May 26, 2022 | Completed final sign-off Apr 2025 | 618 Eugenia Av | Andrew Chekene Enterprises/ Dba Ac Enter | front bldg interior remodl of (e) 1st fl bathrooms and kitchen; removal and replacement of (e) stair to (e) attic space; structural framing as required to support (n) stair opening and (n) walls; interior cabinetry, interior doors and finish. selection @ basement and main levelsDetails
front bldg interior remodl of (e) 1st fl bathrooms and kitchen; removal and replacement of (e) stair to (e) attic space; structural framing as required to support (n) stair opening and (n) walls; interior cabinetry, interior doors and finish. selection @ basement and main levels | $735,000 |
| Apr 27, 2022 | Completed final sign-off Nov 2023 | 1200 California St | Nob Hill Construction | unit 27a: revision to pa# 202106102105. change beam + skylight.Details
unit 27a: revision to pa# 202106102105. change beam + skylight. | |
| Mar 25, 2022 | Never finaled issued Apr 2022, no final | 42 Rossi Av | Baxter Construction | remove (e) structural columns in basement, remove (e) interior non bearing wall on the 1st fl. kitchen, and 2 fl. bathroomDetails
remove (e) structural columns in basement, remove (e) interior non bearing wall on the 1st fl. kitchen, and 2 fl. bathroom | $38,000 |
| Dec 6, 2021 | Completed final sign-off Sep 2022 | 74 Heather Av | Nob Hill Construction | bathroom and bedroom remodel, new fixtures and finishes, new high effincy lightingDetails
bathroom and bedroom remodel, new fixtures and finishes, new high effincy lighting | $220,000 |
| Feb 26, 2021 | Completed final sign-off Jan 2023 | 2295 Vallejo St | Axis Construction | revision to app#202007310964. replacement of existing damaged structural members at elevated walkway.Details
revision to app#202007310964. replacement of existing damaged structural members at elevated walkway. | $450,000 |
| Jan 23, 2021 | Completed final sign-off Apr 2025 | 618 Eugenia Av | Andrew Chekene Enterprises/ Dba Ac Enter | alteration of (e) non-conforming basement/ interior remodel & new interior access stair, new light well.structural foundation, floor framing & wall framing to support alterations. remove & replace (e) west courtyard slab & north & south property line fences & gate.Details
alteration of (e) non-conforming basement/ interior remodel & new interior access stair, new light well.structural foundation, floor framing & wall framing to support alterations. remove & replace (e) west courtyard slab & north & south property line fences & gate. | $735,000 |
| Jul 31, 2020 | Completed final sign-off Aug 2022 | 2295 Vallejo St | Axis Construction | perform structural repairs to the walkway framing & stair structures found at the rear elevation of the bldg. replace all (e) metal guardrails at the stairs & landings/walkways. remove & replace identified area of the concrete walking surface at the landings/walkway to perform the work followed by..Details
perform structural repairs to the walkway framing & stair structures found at the rear elevation of the bldg. replace all (e) metal guardrails at the stairs & landings/walkways. remove & replace identified area of the concrete walking surface at the landings/walkway to perform the work followed by.. | $490,000 |
| Jun 30, 2020 | Completed final sign-off Jun 2021 | 175 Francisco St | Nob Hill Construction | remodel den complete; plus bathroom remodel on lower level. includes new fixtures, finishes, millwork & paint. also new led lighting throughout & new gas fireplace with ventilation system. no structural workDetails
remodel den complete; plus bathroom remodel on lower level. includes new fixtures, finishes, millwork & paint. also new led lighting throughout & new gas fireplace with ventilation system. no structural work | $54,000 |
| Jul 23, 2019 | Completed final sign-off Oct 2019 | 2190 Broadway | Nob Hill Construction | #10w: revision to pa# 201809211022. eliminate wall at guest bedroom, and monor changes to floor plan layoutDetails
#10w: revision to pa# 201809211022. eliminate wall at guest bedroom, and monor changes to floor plan layout | |
| May 6, 2019 | Completed final sign-off Feb 2020 | 618 Eugenia Av | Andrew Chekene Enterprises/ Dba Ac Enter | garage foundation repair.Details
garage foundation repair. | $31,614 |
| Apr 23, 2019 | Completed final sign-off Aug 2021 | 2190 Broadway | Baxter Construction | unit 8e: remodel kitchen & four bathrooms. new hardwood flooring - removing non-bearing wall between kitchen & dining room.Details
unit 8e: remodel kitchen & four bathrooms. new hardwood flooring - removing non-bearing wall between kitchen & dining room. | $90,000 |
| Nov 5, 2018 | Completed final sign-off Mar 2020 | 3108 Jackson St | Richard Avelar &Assoc Reconstr/Dba Recon | structural improvement support 3 flr ceiling joists, provide new footing for stronf wall assembly on 2nd flr. and support 2 second flr joists. reframe cornice roof (non street facing) remove non bearing wall on 3 flr maher n/a.Details
structural improvement support 3 flr ceiling joists, provide new footing for stronf wall assembly on 2nd flr. and support 2 second flr joists. reframe cornice roof (non street facing) remove non bearing wall on 3 flr maher n/a. | $80,000 |
| Aug 31, 2018 | Completed final sign-off Mar 2020 | 3108 Jackson St | Richard Avelar &Assoc Reconstr/Dba Recon | provide bay windows above (e) 2nd flr bay window at 3rd flr.bay windows is over 7.5ft above grade, 10x2ft and meets dcp code 136(c)(3). replace (e) windows at 2nd flr. installing (7) windows in total. maher n/aDetails
provide bay windows above (e) 2nd flr bay window at 3rd flr.bay windows is over 7.5ft above grade, 10x2ft and meets dcp code 136(c)(3). replace (e) windows at 2nd flr. installing (7) windows in total. maher n/a | $35,000 |
| Aug 22, 2018 | Completed final sign-off Sep 2020 | 765 Market St | Baxter Construction | unit 22a. renovate 1 kitchen, 4 bathrooms, laundry, new hardwood rloors throughout, new led recessed lighting, no structural work, new walls and ceilings per plans. maher n/a.Details
unit 22a. renovate 1 kitchen, 4 bathrooms, laundry, new hardwood rloors throughout, new led recessed lighting, no structural work, new walls and ceilings per plans. maher n/a. | $150,000 |
| Apr 24, 2018 | Never finaled issued May 2018, no final | 501 Crescent Wy | Richard Avelar &Assoc Reconstr/Dba Recon | unit 5413 -revision to permit #201712085980. reconfigure interior walls.Details
unit 5413 -revision to permit #201712085980. reconfigure interior walls. | $28,673 |
| Jun 22, 2016 | Completed final sign-off May 2017 | 487 Greenwich St | Saarman Construction,Ltd. | mandatory soft story seismic retrofit of foundation system w.p. of basement walls affected by seismic work. retail onlyDetails
mandatory soft story seismic retrofit of foundation system w.p. of basement walls affected by seismic work. retail only | $11,544 |
| May 6, 2016 | Completed final sign-off May 2017 | 487 Greenwich St | Saarman Construction,Ltd. | mandatory soft story retro fit of foundation system, of soft storey bld wp of basement walls affected by seismic work. interior cosmetic repairs. residential only.Details
mandatory soft story retro fit of foundation system, of soft storey bld wp of basement walls affected by seismic work. interior cosmetic repairs. residential only. | $96,788 |
| May 6, 2016 | Never finaled issued Aug 2016, no final | 487 Greenwich St | Saarman Construction,Ltd. | waterproofing of basement walls & private patio.interior cosmetic repairs affectd by seismic retrofit.Details
waterproofing of basement walls & private patio.interior cosmetic repairs affectd by seismic retrofit. | $500,000 |
| May 29, 2014 | Completed final sign-off Jun 2014 | 1170 Sacramento St | Muratore Inc | #13d - removal of non-bearing partition wall at dining room, master bedroom, & master bathroom. work complete under pa #2013.0524.7837. n/a maher ordinance 155-13Details
#13d - removal of non-bearing partition wall at dining room, master bedroom, & master bathroom. work complete under pa #2013.0524.7837. n/a maher ordinance 155-13 | |
| Apr 12, 2013 | Completed final sign-off Aug 2013 | 301 Mission St | Muratore Inc | unit #401 - relocate existing entry door. merging of unit 401 & 402 approved by cp-zoc under approved permit appln #201208076804Details
unit #401 - relocate existing entry door. merging of unit 401 & 402 approved by cp-zoc under approved permit appln #201208076804 | $5,000 |
| Mar 7, 2011 | Completed final sign-off May 2011 | 1170 Sacramento St | B & S Crane And Erection | voluntary struc upgrade- bracing and anchorage of (e) water tank in mech penthouse of a res stuc. upgrade to occur only at mec penthouseDetails
voluntary struc upgrade- bracing and anchorage of (e) water tank in mech penthouse of a res stuc. upgrade to occur only at mec penthouse | $4,800 |
| Aug 9, 2005 | Expired or cancelled expired Jun 2007 | 2574 Green St | voluntary structural strengthening to include interior & exterior plywood walls (ref.to appn. 200504260895 for the approval of the interior remodel).per engr & owner changed from seismic upgrade to structural strengtheningDetails
voluntary structural strengthening to include interior & exterior plywood walls (ref.to appn. 200504260895 for the approval of the interior remodel).per engr & owner changed from seismic upgrade to structural strengthening | $35,000 | |
| Nov 18, 2004 | Completed final sign-off Jun 2005 | 2574 Green St | Muratore Inc | voluntary upgrade to structural work.refer to 200402277333, permit 1022576.Details
voluntary upgrade to structural work.refer to 200402277333, permit 1022576. | $15,000 |
| May 20, 2004 | Completed final sign-off Jun 2005 | 2574 Green St | Muratore Inc | add new shed dormer to top floor @ west side of bldg.Details
add new shed dormer to top floor @ west side of bldg. | $18,000 |