James Neubert
- Listed as
- architect
- Firm
- James Neubert Architect
- Based in
- Redwood City
- On San Francisco permits
- Jul 2010 to Sep 2025
13 permits since 2000 (architect on 13 permits): 8 completed, 1 in progress, 1 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 9, 2025 | Completed final sign-off Feb 2026 | 300 Salinas Av | Baby Bear Construction Llc | to comply with nov# 202426665, agreed in hearing to cover existing seismic braces in public right-of-way with an enclosure. planter bed was rejected due to public loitering in the planter bed. this solution was endorsed. we're also submitting minor sidewalk encroachment permit with this application.Details
to comply with nov# 202426665, agreed in hearing to cover existing seismic braces in public right-of-way with an enclosure. planter bed was rejected due to public loitering in the planter bed. this solution was endorsed. we're also submitting minor sidewalk encroachment permit with this application. | $30,000 |
| Jun 13, 2025 | In progress issued Jul 2025 | 4663 Mission St | Saavedra Works, Jesus Henriquez | to comply with nov 202182947. removal of non-permitted 2/f deck and stair down. replacement with smaller 2/f landing and stair down. no exit thru commercial per planning review.Details
to comply with nov 202182947. removal of non-permitted 2/f deck and stair down. replacement with smaller 2/f landing and stair down. no exit thru commercial per planning review. | $18,000 |
| Jan 7, 2025 | Expired or cancelled cancelled Jan 2025 | 4663 Mission St | legalize deck & stair without permits. complaint# 202182947. new rear yard 2nd floor, landing & stair down.Details
legalize deck & stair without permits. complaint# 202182947. new rear yard 2nd floor, landing & stair down. | $19,000 | |
| Nov 13, 2024 | Completed final sign-off May 2025 | 1319 Carroll Av | Hocker Construction | replace steel door and steel siding like for like.Details
replace steel door and steel siding like for like. | $90,000 |
| Aug 23, 2023 | Expired or cancelled expired Jul 2026 | 156 Lunado Ct | Chubby Construction | revision to permit #202201045299. removal of existing beam & post at lower level & replacement of it with new beam without interior post.Details
revision to permit #202201045299. removal of existing beam & post at lower level & replacement of it with new beam without interior post. | $9,000 |
| Apr 26, 2023 | Never finaled issued May 2023, no final | 639 04th Av | Hocker Construction | to compy w/complaint # 202291617, reframe collapse roof, ceiling joist, roof sheathing and install new asphalt shingles.Details
to compy w/complaint # 202291617, reframe collapse roof, ceiling joist, roof sheathing and install new asphalt shingles. | $250,000 |
| Jan 4, 2022 | Completed final sign-off Jul 2026 | 156 Lunado Ct | Chubby Construction | (n) ev car charger. water service to increase to 11/4" o.d. for (n) fire sprinklers. full interior remodel including: kitchen & 3 bathrms remodels, ramps, sloped walkway, exterior stairs for free accessibility. 78 s.f. addition. remove fireplace/chimney. roofing.(n) windows, mini-split hvac.Details
(n) ev car charger. water service to increase to 11/4" o.d. for (n) fire sprinklers. full interior remodel including: kitchen & 3 bathrms remodels, ramps, sloped walkway, exterior stairs for free accessibility. 78 s.f. addition. remove fireplace/chimney. roofing.(n) windows, mini-split hvac. | $517,000 |
| Apr 4, 2017 | Expired or cancelled cancelled Jan 2026 | 682 19th Av | interior added bedroom and bath for disabled family member. no structural 393 sf gr flDetails
interior added bedroom and bath for disabled family member. no structural 393 sf gr fl | $19,800 | |
| Sep 13, 2013 | Completed final sign-off Oct 2018 | 4272 23rd St | Baba Builders Co | replacement of dryrotted stair in kind at back of bldg. same location, same configuration. required means of egress. to comply with complaint #201032501Details
replacement of dryrotted stair in kind at back of bldg. same location, same configuration. required means of egress. to comply with complaint #201032501 | $5,000 |
| Apr 20, 2012 | Completed final sign-off Dec 2012 | 1748 Clay St | S C Anderson Group International Inc. | fire remediation/restoration, no new scope, hazardous materials abatement, some new electrical, code complaint main panel access, some new doors & windows, mandatory barrier-free upgrades, mep under separate permit.Details
fire remediation/restoration, no new scope, hazardous materials abatement, some new electrical, code complaint main panel access, some new doors & windows, mandatory barrier-free upgrades, mep under separate permit. | $97,000 |
| Dec 2, 2011 | Completed final sign-off May 2012 | 40 Brompton Av | Euro Constr And Painting Inc | new bathroom & legalize (e) bedroom, closet & 1/2 bath @ ground floor.Details
new bathroom & legalize (e) bedroom, closet & 1/2 bath @ ground floor. | $7,000 |
| Jul 12, 2011 | Completed final sign-off Apr 2012 | 4018 19th St | Iman Construction | to comply with nov #200861090 - removal of rotten stairs in rear of bldg and replace with new as per plansDetails
to comply with nov #200861090 - removal of rotten stairs in rear of bldg and replace with new as per plans | $20,000 |
| Jul 26, 2010 | Completed final sign-off Oct 2010 | 1521 Florida St | Gb Construction Company | to comply with nov# 201039598 dated 4/2/2010. dry rot repair to rear egress stair , more than 50% repacement.Details
to comply with nov# 201039598 dated 4/2/2010. dry rot repair to rear egress stair , more than 50% repacement. | $8,000 |