Most recent permits
Showing the 100 most recent of 1,618.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 16, 2021 | Completed final sign-off Dec 2021 | 119 Frederick St | Lingruen Associates | to perform repairs as per lingren associates termite reporet #89700,item #1b: dry rot repair.Details
to perform repairs as per lingren associates termite reporet #89700,item #1b: dry rot repair. | $4,500 |
| Dec 1, 2021 | Completed final sign-off Dec 2021 | 599 24th Av | Lingruen Associates | perform repairs as per lingruen associates, termite report #89022. item #3a, 3b, 1d. replacing damaged stringer and guardrail post w/ new p.t material. not visable from exterior. repair in-kind less than 50%Details
perform repairs as per lingruen associates, termite report #89022. item #3a, 3b, 1d. replacing damaged stringer and guardrail post w/ new p.t material. not visable from exterior. repair in-kind less than 50% | $7,200 |
| Nov 29, 2021 | Completed final sign-off Dec 2021 | 476 Lansdale Av | Lingruen Associates | perform repairs as per lingruen associates, termite report #87540-s2. item #5c work to be done in kindDetails
perform repairs as per lingruen associates, termite report #87540-s2. item #5c work to be done in kind | $4,800 |
| Nov 8, 2021 | Completed final sign-off Dec 2021 | 426 Victoria St | Lingruen Associates | perform repairs as per lingruen associates termit report # 89259 and 59259-s1. item 3's 1b, 2a, 2b, 5i, 5j, 5k.Details
perform repairs as per lingruen associates termit report # 89259 and 59259-s1. item 3's 1b, 2a, 2b, 5i, 5j, 5k. | $30,550 |
| Nov 3, 2021 | Completed final sign-off Nov 2021 | 762 Edinburgh St | Lingruen Associates | perform repairs as per lingruen associates termite report# 89691: item #5a approx. 6x8x10 ft remove/replace only.Details
perform repairs as per lingruen associates termite report# 89691: item #5a approx. 6x8x10 ft remove/replace only. | $2,800 |
| Oct 14, 2021 | Completed final sign-off Dec 2021 | 164 Liberty St | Lingruen Associates | perform repairs as per lingruen associates termite report # 89375: item # 3b, 3eDetails
perform repairs as per lingruen associates termite report # 89375: item # 3b, 3e | $3,250 |
| Oct 14, 2021 | Completed final sign-off Oct 2021 | 3635 26th St | Lingruen Associates | perform repairs as per lingruen associates termite report# 88668: item# 2a,3a,5a,5bDetails
perform repairs as per lingruen associates termite report# 88668: item# 2a,3a,5a,5b | $6,000 |
| Oct 5, 2021 | Completed final sign-off Dec 2021 | 45 San Lorenzo Wy | Lingruen Associates | perform repairs as per lingruen associates termite report #87496-s1 item #5cDetails
perform repairs as per lingruen associates termite report #87496-s1 item #5c | $5,510 |
| Sep 28, 2021 | Completed final sign-off Oct 2021 | 2580 Greenwich St | Lingruen Associates | perform repairs as per lingruen associates termite report# 89322. item #3aDetails
perform repairs as per lingruen associates termite report# 89322. item #3a | $4,650 |
| Sep 20, 2021 | Completed final sign-off Oct 2021 | 711 Scott St | Lingruen Associates | perform repairs as per lingruen associates. termit report #88833. item # 2a, 5 kDetails
perform repairs as per lingruen associates. termit report #88833. item # 2a, 5 k | $15,800 |
| Sep 20, 2021 | Completed final sign-off Oct 2021 | 925 Burnett Av | Lingruen Associates | perform repairs as per lingruen associates. termite report #89268. item # 3aDetails
perform repairs as per lingruen associates. termite report #89268. item # 3a | $1,500 |
| Sep 7, 2021 | Completed final sign-off Nov 2021 | 153 Wool St | Lingruen Associates | perform repairs as per lingruen associates. termite report 88995, item 1a,3aDetails
perform repairs as per lingruen associates. termite report 88995, item 1a,3a | $4,700 |
| Sep 7, 2021 | Completed final sign-off Sep 2021 | 2814 Laguna St | Lingruen Associates | perform repairs per lingruen associates termit report 89088 item 2aDetails
perform repairs per lingruen associates termit report 89088 item 2a | $2,500 |
| Aug 27, 2021 | Completed final sign-off Sep 2021 | 42 Cameo Wy | Lingruen Associates | perform repairs per lingruen assoc termite report 88141. item 5a. dry rot repair at rear of bldg appox. 20 feet in kind.Details
perform repairs per lingruen assoc termite report 88141. item 5a. dry rot repair at rear of bldg appox. 20 feet in kind. | $2,625 |
| Aug 23, 2021 | Completed final sign-off Sep 2021 | 2281 Green St | Lingruen Associates | perform repairs per lingruen assoc. termite report #89113 item #2a,3a, 3b,3c. all repairs in kind.Details
perform repairs per lingruen assoc. termite report #89113 item #2a,3a, 3b,3c. all repairs in kind. | $20,400 |
| Aug 20, 2021 | Completed final sign-off Oct 2021 | 622 Spruce St | Lingruen Associates | perform repairs as per lingruen assocate. termite report 88624 item 3a,3b,5a,5b. repair stairs and decking less than 50% and repair/replace siding non-street facing.Details
perform repairs as per lingruen assocate. termite report 88624 item 3a,3b,5a,5b. repair stairs and decking less than 50% and repair/replace siding non-street facing. | $22,500 |
| Aug 20, 2021 | Completed final sign-off Oct 2021 | 3032 Divisadero St | Lingruen Associates | perform repairs as per lingruen assocate. termite report 85037-s1 item 5e. remove stucco around (e) bathroom window and repair.Details
perform repairs as per lingruen assocate. termite report 85037-s1 item 5e. remove stucco around (e) bathroom window and repair. | $7,700 |
| Aug 4, 2021 | Completed final sign-off Aug 2021 | 83 Fountain St | Lingruen Associates | perform repairs as per lingruen associates termite report # 88838. item 3a.Details
perform repairs as per lingruen associates termite report # 88838. item 3a. | $2,000 |
| Aug 4, 2021 | Completed final sign-off Aug 2021 | 1472 06th Av | Lingruen Associates | perform repairs as per lingruen associates termite report # 88777. item 5a.Details
perform repairs as per lingruen associates termite report # 88777. item 5a. | $6,000 |
| Aug 2, 2021 | Completed final sign-off Sep 2021 | 186 Collins St | Lingruen Associates | perform repairs as per lingruen associates: termite report#88746: item# 2a,3a,5aDetails
perform repairs as per lingruen associates: termite report#88746: item# 2a,3a,5a | $40,050 |
| Aug 2, 2021 | Completed final sign-off Aug 2021 | 2514 32nd Av | Lingruen Associates | perform repairs as per lingruen associates termite report# 88411-51: item# 5e and report # 88411 dated 5/24/21 item 3a.5aDetails
perform repairs as per lingruen associates termite report# 88411-51: item# 5e and report # 88411 dated 5/24/21 item 3a.5a | $35,000 |
| Jul 22, 2021 | Completed final sign-off Sep 2021 | 440 Valley St | Lingruen Associates | perform repairs as per lingruen associates termite report # 87336 - item 3a.Details
perform repairs as per lingruen associates termite report # 87336 - item 3a. | $36,500 |
| Jul 12, 2021 | Completed final sign-off Aug 2021 | 2575 15th Av | Lingruen Associates | perform repairs as per lingruen associates termite report # 87312-s1- item# 5b repair in kind approx. 5' (w) x 10 ' (h)Details
perform repairs as per lingruen associates termite report # 87312-s1- item# 5b repair in kind approx. 5' (w) x 10 ' (h) | $5,500 |
| Jul 1, 2021 | Completed final sign-off Jul 2021 | 129 Collingwood St | Lingruen Associates | perform repairs as per lingruen associates. termite report #88077 item# 2a,3a,5aDetails
perform repairs as per lingruen associates. termite report #88077 item# 2a,3a,5a | $14,750 |
| Jul 1, 2021 | Completed final sign-off Jul 2021 | 627 Kirkham St | Lingruen Associates | perform repairs as per lingruen associates. termite report #87887 item# 1a,3a,3bDetails
perform repairs as per lingruen associates. termite report #87887 item# 1a,3a,3b | $3,650 |
| Jun 18, 2021 | Completed final sign-off Dec 2021 | 2296 15th Av | Lingruen Associates | perform repairs as per lingruen associates termite report item # 5jDetails
perform repairs as per lingruen associates termite report item # 5j | $60,000 |
| Jun 18, 2021 | Completed final sign-off Jul 2021 | 2850 Steiner St | Lingruen Associates | perform repairs as per lingruea associates termite report #88350: item #: 3a,3b,3d,3e,5bDetails
perform repairs as per lingruea associates termite report #88350: item #: 3a,3b,3d,3e,5b | $10,850 |
| Jun 16, 2021 | Completed final sign-off Jul 2021 | 18 Tiffany Av | Lingruen Associates | perform repairs as per lingruen assoc. termit report #86615. item # 2a, 3b,3cDetails
perform repairs as per lingruen assoc. termit report #86615. item # 2a, 3b,3c | $3,325 |
| Jun 16, 2021 | Completed final sign-off Jun 2021 | 20 Hancock St | Lingruen Associates | perform repairs as per lingruen assoc. termit report #88048. item # 3a, 5aDetails
perform repairs as per lingruen assoc. termit report #88048. item # 3a, 5a | $4,400 |
| May 12, 2021 | Completed final sign-off Jun 2021 | 3992 25th St | Lingruen Associates | perform repairs as per lingruen associates termite report 8227, item #3a-3bDetails
perform repairs as per lingruen associates termite report 8227, item #3a-3b | $9,395 |
| May 12, 2021 | Completed final sign-off Aug 2021 | 1624 20th St | Lingruen Associates | perform repairs as per lingruen associates termite report #87569-s1. item 5dDetails
perform repairs as per lingruen associates termite report #87569-s1. item 5d | $5,500 |
| May 12, 2021 | Completed final sign-off Dec 2021 | 2296 15th Av | Lingruen Associates | perform repairs as per lingruen associates terite report #87281 item 2a & report 87281 - s2 item 5gDetails
perform repairs as per lingruen associates terite report #87281 item 2a & report 87281 - s2 item 5g | $33,000 |
| Apr 21, 2021 | Completed final sign-off Apr 2021 | 894 Chestnut St | Lingruen Associates | perform repairs as per lingruen associates. termite report 88106 item 3aDetails
perform repairs as per lingruen associates. termite report 88106 item 3a | $10,000 |
| Mar 24, 2021 | Completed final sign-off Jun 2021 | 518 Chenery St | Lingruen Associates | perform repairs per lungruen assocites termite report #86397, items #1d, 2a, 2b, 2c, 3a. all repairs are less than 40%Details
perform repairs per lungruen assocites termite report #86397, items #1d, 2a, 2b, 2c, 3a. all repairs are less than 40% | $19,650 |
| Mar 24, 2021 | Completed final sign-off Apr 2021 | 2445 Franklin St | Lingruen Associates | perform repairs per lungruen assocites termite report #87819, items #2a, 5aDetails
perform repairs per lungruen assocites termite report #87819, items #2a, 5a | $5,900 |
| Mar 24, 2021 | Completed final sign-off May 2021 | 292 Crescent Av | Lingruen Associates | perform repairs per lungruen assocites termite report #87457, items #1b, 3a, 5aDetails
perform repairs per lungruen assocites termite report #87457, items #1b, 3a, 5a | $4,100 |
| Mar 24, 2021 | Completed final sign-off Jun 2021 | 243 Molimo Dr | Lingruen Associates | perform repairs per lungruen assocites termite report #87219-s1, items #3a, 5cDetails
perform repairs per lungruen assocites termite report #87219-s1, items #3a, 5c | $4,950 |
| Mar 22, 2021 | Completed final sign-off Mar 2021 | 1723 Noe St | Lingruen Associates | perform repairs as per lingruen associates termite report #87585. item #3a, 3b, 5a, 5b, 5c. all repairs less than 40%Details
perform repairs as per lingruen associates termite report #87585. item #3a, 3b, 5a, 5b, 5c. all repairs less than 40% | $2,575 |
| Mar 8, 2021 | Completed final sign-off Mar 2021 | 2465 Union St | Lingruen Associates | perform repairs as per lingruen associates. termite report #87612-s1. item #3bDetails
perform repairs as per lingruen associates. termite report #87612-s1. item #3b | $8,000 |
| Mar 8, 2021 | Completed final sign-off Mar 2021 | 2638 Fulton St | Lingruen Associates | perform repairs as per lingruen associates. termite report 87601 items #5aDetails
perform repairs as per lingruen associates. termite report 87601 items #5a | $7,200 |
| Mar 8, 2021 | Completed final sign-off Apr 2021 | 1 Lupine Av | Lingruen Associates | perform repairs as per lingruen associates. termite report #87059-s1. items #1a,1b,1c,5a,5b,5c,5fDetails
perform repairs as per lingruen associates. termite report #87059-s1. items #1a,1b,1c,5a,5b,5c,5f | $60,650 |
| Mar 1, 2021 | Completed final sign-off Mar 2021 | 1220 04th Av | Lingruen Associates | preform repairs per lingruen assoc termite report #87704 items: 1b/1c/3a/3b/5b/5c/5e. no work visible from street.Details
preform repairs per lingruen assoc termite report #87704 items: 1b/1c/3a/3b/5b/5c/5e. no work visible from street. | $6,725 |
| Feb 26, 2021 | Completed final sign-off Apr 2021 | 64 Nordhoff St | Lingruen Associates | perfom repairs as per lingruen associates termite report #87094 item #3a, 3b, 5a. minor dry rot repair at front approx 50 sq ft.Details
perfom repairs as per lingruen associates termite report #87094 item #3a, 3b, 5a. minor dry rot repair at front approx 50 sq ft. | $7,400 |
| Feb 26, 2021 | Completed final sign-off Jul 2021 | 101 Commonwealth Av | Lingruen Associates | perform repairs as per lingruen associates termite report#87199-s1 minor dry pot repair item #3a,5e,5f,5g approx 100 sqft no changes like for like replacementDetails
perform repairs as per lingruen associates termite report#87199-s1 minor dry pot repair item #3a,5e,5f,5g approx 100 sqft no changes like for like replacement | $28,000 |
| Feb 26, 2021 | Completed final sign-off May 2021 | 30 Brighton Av | Lingruen Associates | perform repairs as per lingruen associates; termite report #87012-51 item # 5a, 5b minor dry rot repair approz 50 sqft @ front of building (no changes)Details
perform repairs as per lingruen associates; termite report #87012-51 item # 5a, 5b minor dry rot repair approz 50 sqft @ front of building (no changes) | $16,000 |
| Feb 17, 2021 | Completed final sign-off Mar 2021 | 1013 Rhode Island St | Lingruen Associates | perform repairs as per lingruen associates termite report # 86173. item # 5b, 5c, 5d.Details
perform repairs as per lingruen associates termite report # 86173. item # 5b, 5c, 5d. | $3,700 |
| Feb 17, 2021 | Completed final sign-off Dec 2021 | 2296 15th Av | Lingruen Associates | perform repairs as per lingruen associates termite report # 87281-s1. item # 5e, 5f.Details
perform repairs as per lingruen associates termite report # 87281-s1. item # 5e, 5f. | $27,300 |
| Jan 14, 2021 | Completed final sign-off Apr 2021 | 839 Broderick St | Lingruen Associates | unit 1: perform repairs as per lingruen associates termite report 82867. item 5iDetails
unit 1: perform repairs as per lingruen associates termite report 82867. item 5i | $9,000 |
| Dec 17, 2020 | Never finaled issued Dec 2020, no final | 2017 19th St | Lingruen Associates | local repair of side and rear stairway less than 50% as per lingruen ass. termite report #86873 item #3a,3bDetails
local repair of side and rear stairway less than 50% as per lingruen ass. termite report #86873 item #3a,3b | $3,750 |
| Dec 17, 2020 | Completed final sign-off Mar 2021 | 1129 Douglass St | Lingruen Associates | perform repairs as per lingruen associates termite report #86229 item #1a for fungus damage for front stucco repair like for like and local dry rot repair at front of buildingDetails
perform repairs as per lingruen associates termite report #86229 item #1a for fungus damage for front stucco repair like for like and local dry rot repair at front of building | $32,375 |
| Dec 4, 2020 | Completed final sign-off Jan 2021 | 718 Olmstead St | Lingruen Associates | perform repairs as per lingrven associates. termite report#85276. item#5a.Details
perform repairs as per lingrven associates. termite report#85276. item#5a. | $1,150 |
| Dec 4, 2020 | Completed final sign-off Feb 2021 | 42 August Al | Lingruen Associates | perform repairs as pwr lingruen associates. termite report#86494. item#3a,4a.Details
perform repairs as pwr lingruen associates. termite report#86494. item#3a,4a. | $4,750 |
| Nov 18, 2020 | Completed final sign-off Dec 2020 | 2304 Washington St | Lingruen Associates | perform repairs as per lingruen associates. termite repair #86939. item # 1a,1b,2aDetails
perform repairs as per lingruen associates. termite repair #86939. item # 1a,1b,2a | $6,900 |
| Nov 16, 2020 | Completed final sign-off Dec 2020 | 4201 22nd St | Lingruen Associates | perform repaiurs as per lingruen associates termit report 86211 and 86211 s1 item 2a 5e 3aDetails
perform repaiurs as per lingruen associates termit report 86211 and 86211 s1 item 2a 5e 3a | $9,000 |
| Nov 16, 2020 | Completed final sign-off May 2021 | 119 Hancock St | Lingruen Associates | perform repairs per lingruen associates termit report # 85887 item 3a-faDetails
perform repairs per lingruen associates termit report # 85887 item 3a-fa | $4,500 |
| Nov 4, 2020 | Completed final sign-off Dec 2020 | 64 Lagunitas Dr | Lingruen Associates | perform repairs as per lingruen associates termite report #86107-si. item #5bDetails
perform repairs as per lingruen associates termite report #86107-si. item #5b | $23,000 |
| Nov 4, 2020 | Completed final sign-off Dec 2020 | 4430 25th St | Lingruen Associates | perform repairs as per lingruen associates. termite report #86395. item #5aDetails
perform repairs as per lingruen associates. termite report #86395. item #5a | $7,500 |
| Sep 25, 2020 | Completed final sign-off Oct 2020 | 554 Ramsell St | Lingruen Associates | perform repair as per lingruen associates termite report #85345. item #2a, 5c, 5e, 5d.Details
perform repair as per lingruen associates termite report #85345. item #2a, 5c, 5e, 5d. | $9,050 |
| Sep 25, 2020 | Completed final sign-off Feb 2021 | 2925 Larkin St | Lingruen Associates | perform repair as per lingruen associates termite report #86191-s1. item # 5d, 5e.Details
perform repair as per lingruen associates termite report #86191-s1. item # 5d, 5e. | $10,500 |
| Sep 25, 2020 | Completed final sign-off Feb 2021 | 200 Ellsworth St | Lingruen Associates | perform repair as per lingruen associates termite report #86146. item # 1c, 1d, 1e.Details
perform repair as per lingruen associates termite report #86146. item # 1c, 1d, 1e. | $4,000 |
| Sep 24, 2020 | Completed final sign-off Feb 2022 | 75 Seacliff Av | Lingruen Associates | perform repairs as per lingruen associates termite report 85033-s1 item 5fDetails
perform repairs as per lingruen associates termite report 85033-s1 item 5f | $24,500 |
| Sep 24, 2020 | Completed final sign-off Feb 2021 | 3825 25th St | Lingruen Associates | perform repairs as per lingruen associates termite report 85940 item 5b, 5c, 5d.Details
perform repairs as per lingruen associates termite report 85940 item 5b, 5c, 5d. | $24,500 |
| Sep 23, 2020 | Completed final sign-off Feb 2021 | 109 Cornwall St | Lingruen Associates | perform repairs as per lingruen associates termite report 84494 items 3a, 5bDetails
perform repairs as per lingruen associates termite report 84494 items 3a, 5b | $5,300 |
| Sep 23, 2020 | Never finaled issued Sep 2020, no final | 738 19th Av | Lingruen Associates | perform repairs as per lingruen associates termite report 86215 item 3aDetails
perform repairs as per lingruen associates termite report 86215 item 3a | $5,300 |
| Sep 22, 2020 | Completed final sign-off Jan 2021 | 78 22nd Av | Lingruen Associates | perform repairs as per lingruen associates termite report 85411-s2 item 5l.Details
perform repairs as per lingruen associates termite report 85411-s2 item 5l. | $100,000 |
| Sep 22, 2020 | Completed final sign-off Nov 2020 | 1801 Broderick St | Lingruen Associates | perform repairs as per lingruen associates termite report 86189 item 3a.Details
perform repairs as per lingruen associates termite report 86189 item 3a. | $7,800 |
| Sep 11, 2020 | Completed final sign-off Nov 2020 | 1038 Jamestown Av | Lingruen Associates | perform repairs as per lingruen associates termite report 86198 item #5aDetails
perform repairs as per lingruen associates termite report 86198 item #5a | $4,775 |
| Sep 11, 2020 | Completed final sign-off Oct 2020 | 4135 23rd St | Lingruen Associates | perform repairs as per lingruen associates termite report 85512 item # 2a, 5bDetails
perform repairs as per lingruen associates termite report 85512 item # 2a, 5b | $5,340 |
| Sep 10, 2020 | Completed final sign-off Oct 2020 | 551 Clipper St | Lingruen Associates | perform repairs per lingruen associates termite report 85383 item 3aDetails
perform repairs per lingruen associates termite report 85383 item 3a | $13,400 |
| Sep 9, 2020 | Never finaled issued Sep 2020, no final | 78 Cotter St | Lingruen Associates | install 5/8" all tread galv. bolts w/3"xe" square washers every 3' to 4' to secure perimeter foundation mudsills, bolt post to beam & post to piers using proper simpson ties.Details
install 5/8" all tread galv. bolts w/3"xe" square washers every 3' to 4' to secure perimeter foundation mudsills, bolt post to beam & post to piers using proper simpson ties. | $7,400 |
| Sep 9, 2020 | Completed final sign-off Dec 2020 | 17 Dicha Al | Lingruen Associates | perform repairs as per lingruen associates termite report #85216-s1 item #3bDetails
perform repairs as per lingruen associates termite report #85216-s1 item #3b | $55,000 |
| Aug 15, 2020 | Completed final sign-off Feb 2021 | 871 San Jose Av | Lingruen Associates | remove stucco at rear right wall and across head frame as needed in order to repair damaged wood members per item 5g, remove stucco at soffits in order to repair damaged wood members per item 5f of lingruen associates termite report # 85712-s1Details
remove stucco at rear right wall and across head frame as needed in order to repair damaged wood members per item 5g, remove stucco at soffits in order to repair damaged wood members per item 5f of lingruen associates termite report # 85712-s1 | $18,500 |
| Aug 12, 2020 | Completed final sign-off Jan 2021 | 190 Los Palmos Dr | Lingruen Associates | per lingruen associates termite report #85753 dated 6/19/2020 - replace bottom siding board ~50 sqft per item 5a. repair corner trim and siding~ 20 sqft at rear per item 5b. repair window trim per item 5c. repair door sill and jamb per item 5d.Details
per lingruen associates termite report #85753 dated 6/19/2020 - replace bottom siding board ~50 sqft per item 5a. repair corner trim and siding~ 20 sqft at rear per item 5b. repair window trim per item 5c. repair door sill and jamb per item 5d. | $3,100 |
| Aug 12, 2020 | Completed final sign-off Apr 2022 | 66 Saint Elmo Wy | Lingruen Associates | per lingruen associate termite report #85786 dated 6/30/20 -increase foundation height by 12" & replace damaged mudsill(item 2a & 2b). repair damaged wood members below stairs & patio(item 3a). repair deck(item 3b). remove stucco ~275 sqft & repair damaged wood members (item 5a, 5b, 5c, 5d).Details
per lingruen associate termite report #85786 dated 6/30/20 -increase foundation height by 12" & replace damaged mudsill(item 2a & 2b). repair damaged wood members below stairs & patio(item 3a). repair deck(item 3b). remove stucco ~275 sqft & repair damaged wood members (item 5a, 5b, 5c, 5d). | $53,500 |
| Aug 5, 2020 | Completed final sign-off Sep 2020 | 19 Del Monte St | Lingruen Associates | remove stucco at the front soffit, lower front corner and stair wall, in order to repair damaged wood members and refinish disturbed areas to a reasonable match per items #5c, 5d, and 5e of lingruen associates termite report #78862Details
remove stucco at the front soffit, lower front corner and stair wall, in order to repair damaged wood members and refinish disturbed areas to a reasonable match per items #5c, 5d, and 5e of lingruen associates termite report #78862 | $14,600 |
| Aug 5, 2020 | Completed final sign-off Aug 2020 | 2279 Pine St | Lingruen Associates | repair fungus and beetle damage at exterior fire wall siding per item 5a of lingruen associates termite report #85544. repair in-kind.Details
repair fungus and beetle damage at exterior fire wall siding per item 5a of lingruen associates termite report #85544. repair in-kind. | $3,750 |
| Aug 5, 2020 | Completed final sign-off Sep 2020 | 83 Wawona St | Lingruen Associates | remove stucco at left side as needed towards roof elevation. repair damaged wood members and refinish stucco per item 5d of lingruen associates termite report #76406-s1 dated 02.07.17. stucco approximately 5' x 14' .Details
remove stucco at left side as needed towards roof elevation. repair damaged wood members and refinish stucco per item 5d of lingruen associates termite report #76406-s1 dated 02.07.17. stucco approximately 5' x 14' . | $7,000 |
| Aug 4, 2020 | Completed final sign-off Jan 2021 | 78 22nd Av | Lingruen Associates | termite controll:repair damaged wood members & increase foundation height as needed at base of wall per item 2a, repair damaged at stair assembly, deck and stringers per item 3a, 3b and 3c and repair damaged siding and trim per item 5a of lingruen associates termite report number 85411 dated 5.18.20Details
termite controll:repair damaged wood members & increase foundation height as needed at base of wall per item 2a, repair damaged at stair assembly, deck and stringers per item 3a, 3b and 3c and repair damaged siding and trim per item 5a of lingruen associates termite report number 85411 dated 5.18.20 | $17,340 |
| Jul 13, 2020 | Completed final sign-off Aug 2020 | 34 Stratford Dr | Lingruen Associates | termite control. comply to lingruen report #85358-s1 dated 03.20.20 and refinish area to a reasonable match. remove stucco at base of wall in order to repair damaged wood members at left side adjacent to entry and at right side adjacent to garage level door per item 5c and 5d of lingruen.Details
termite control. comply to lingruen report #85358-s1 dated 03.20.20 and refinish area to a reasonable match. remove stucco at base of wall in order to repair damaged wood members at left side adjacent to entry and at right side adjacent to garage level door per item 5c and 5d of lingruen. | $12,200 |
| Jul 2, 2020 | Completed final sign-off Jul 2020 | 1773 Chestnut St | Lingruen Associates | repair siding at right side of dwelling from adjacent property's light-well area for access with new similar quality material as per lingruen associates termite report # 82174 item 5aDetails
repair siding at right side of dwelling from adjacent property's light-well area for access with new similar quality material as per lingruen associates termite report # 82174 item 5a | $9,350 |
| Jul 2, 2020 | Completed final sign-off Jul 2021 | 839 Broderick St | Lingruen Associates | repair damage frame in crawl space per item 1a. repair partition wall per item 1b. repair damaged mud-sill at trades way per item 2a . repair damage at common stairway, less than 50%, per item 3a. repair siding at base of wall per item 5b and 5c. per lingruen termite report # 82867 dated 3.29.19Details
repair damage frame in crawl space per item 1a. repair partition wall per item 1b. repair damaged mud-sill at trades way per item 2a . repair damage at common stairway, less than 50%, per item 3a. repair siding at base of wall per item 5b and 5c. per lingruen termite report # 82867 dated 3.29.19 | $7,275 |
| Jun 13, 2020 | Completed final sign-off Jun 2020 | 1603 Grove St | Lingruen Associates | repairs due to termite / fungus. perform repairs at sub area frame per item 1c and at rear wall per item 1d and item 5b of lingruen associates termite report #84917.Details
repairs due to termite / fungus. perform repairs at sub area frame per item 1c and at rear wall per item 1d and item 5b of lingruen associates termite report #84917. | $16,000 |
| Jun 11, 2020 | Completed final sign-off Jul 2020 | 1695 43rd Av | Lingruen Associates | termite report. remove stucco at base of front left wall in order to repair damaged wood members. repair damaged window sill & center support between windows as per lingruen associates termite report item 5c. all repairs in-kind.Details
termite report. remove stucco at base of front left wall in order to repair damaged wood members. repair damaged window sill & center support between windows as per lingruen associates termite report item 5c. all repairs in-kind. | $4,400 |
| May 28, 2020 | Completed final sign-off Jul 2020 | 26 Lupine Av | Lingruen Associates | perform repairs to rear decks, stairs and landings per item 3a, 3b and 3c of lingruen associates termite report # 84767, less than 50% repair.Details
perform repairs to rear decks, stairs and landings per item 3a, 3b and 3c of lingruen associates termite report # 84767, less than 50% repair. | $30,800 |
| May 27, 2020 | Completed final sign-off Jul 2020 | 110 27th Av | Lingruen Associates | remove stucco at front section of left side stair banister and remove stucco at base of entry wall, soffit and into adjacent garage head frame. repair damaged wood members and refinish disturbed areas to a reasonable match in-kindDetails
remove stucco at front section of left side stair banister and remove stucco at base of entry wall, soffit and into adjacent garage head frame. repair damaged wood members and refinish disturbed areas to a reasonable match in-kind | $24,900 |
| Mar 12, 2020 | Completed final sign-off Sep 2020 | 4006 21st St | Lingruen Associates | perform repairs as per lingruen associates termite report #84162 & 84162-s1 item # 2a,5e,5fDetails
perform repairs as per lingruen associates termite report #84162 & 84162-s1 item # 2a,5e,5f | $50,750 |
| Mar 12, 2020 | Completed final sign-off Jun 2020 | 574 Miramar Av | Lingruen Associates | perform repairs as per lingruen associates termite report #84936 & 84936-s1 item # 1b,1c,3a,3b,5a,5b,5e,5f,5g,5k,5l,5m,5nDetails
perform repairs as per lingruen associates termite report #84936 & 84936-s1 item # 1b,1c,3a,3b,5a,5b,5e,5f,5g,5k,5l,5m,5n | $20,775 |
| Feb 26, 2020 | Completed final sign-off May 2020 | 729 Bay St | Lingruen Associates | perform repairs as per lingruen associates termite report #84289-s1. item #5gDetails
perform repairs as per lingruen associates termite report #84289-s1. item #5g | $10,000 |
| Feb 26, 2020 | Completed final sign-off May 2020 | 1001 Diamond St | Lingruen Associates | perform repairs as per lingruen associates termite report #84499. item #3a. all work done in kind.Details
perform repairs as per lingruen associates termite report #84499. item #3a. all work done in kind. | $8,800 |
| Feb 20, 2020 | Completed final sign-off May 2020 | 1 Mercato Ct | Lingruen Associates | perform repairs as per lingruen associates termite report # 83700-s1 items # 5e,5f.Details
perform repairs as per lingruen associates termite report # 83700-s1 items # 5e,5f. | $8,000 |
| Feb 10, 2020 | Completed final sign-off Feb 2020 | 248 04th Av | Lingruen Associates | perform repairs as per lingruen associates termite report # 84435. item # 5a,5b and 5c.Details
perform repairs as per lingruen associates termite report # 84435. item # 5a,5b and 5c. | $2,375 |
| Jan 8, 2020 | Completed final sign-off Mar 2020 | 2774 42nd Av | Lingruen Associates | perform repairs as per lingruen associates, termite report #84613. item #1a.Details
perform repairs as per lingruen associates, termite report #84613. item #1a. | $4,400 |
| Jan 8, 2020 | Completed final sign-off Feb 2020 | 328 Mount Vernon Av | Lingruen Associates | perform repairs as per lingruen associates, termite report #83910 & 83910 s1, item #1c, 5dDetails
perform repairs as per lingruen associates, termite report #83910 & 83910 s1, item #1c, 5d | $6,000 |
| Jan 8, 2020 | Completed final sign-off Feb 2020 | 1782 10th Av | Lingruen Associates | perform repairs as per lingruen associates, termite report #79968-s2. item #5f, 5gDetails
perform repairs as per lingruen associates, termite report #79968-s2. item #5f, 5g | $13,700 |
| Dec 5, 2019 | Completed final sign-off Jan 2020 | 925 Corbett Av | Lingruen Associates | perform repairs as per lingruen associates termite report 83679 item # 3aDetails
perform repairs as per lingruen associates termite report 83679 item # 3a | $30,045 |
| Dec 5, 2019 | Completed final sign-off Feb 2020 | 3433 Balboa St | Lingruen Associates | perform repairs as per lingruen associates termite report # 82061-s1 & 82061 item # 5a, 5b, 5e, 5f, 5g, 5hDetails
perform repairs as per lingruen associates termite report # 82061-s1 & 82061 item # 5a, 5b, 5e, 5f, 5g, 5h | $27,805 |
| Nov 22, 2019 | Completed final sign-off Dec 2019 | 1522 11th Av | Lingruen Associates | perform repairs as per lingruen associates termite report #83066-item #3a, #83066-items s1-3c, 3d.Details
perform repairs as per lingruen associates termite report #83066-item #3a, #83066-items s1-3c, 3d. | $3,500 |
| Nov 19, 2019 | Never finaled issued Nov 2019, no final | 1 Mercato Ct | Lingruen Associates | perform repairs as per lingruen associates termite report #83700 item #3a, 5aDetails
perform repairs as per lingruen associates termite report #83700 item #3a, 5a | $4,400 |
| Nov 19, 2019 | Completed final sign-off Dec 2019 | 1673 Dolores St | Lingruen Associates | perform repairs as per lingruen associates termit report #83912 item #1c,1d,3aDetails
perform repairs as per lingruen associates termit report #83912 item #1c,1d,3a | $20,500 |
| Oct 31, 2019 | Completed final sign-off Nov 2019 | 160 19th Av | Lingruen Associates | termite control. install additional 5/8" bolts with 3" x 3" washer set in epoxy aluminum of 8" into existing foundation set 3'-4' o.c. install simpson connectors at 5 post/beam & post/pier connetions.Details
termite control. install additional 5/8" bolts with 3" x 3" washer set in epoxy aluminum of 8" into existing foundation set 3'-4' o.c. install simpson connectors at 5 post/beam & post/pier connetions. | $5,600 |