Ilya Zhuchkov
- Listed as
- authorized agent-others, contractor, designer
- Firm
- Reliable Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2014 to Sep 2026
326 permits since 2000 (contractor on 326 permits, authorized agent-others on 15 permits, designer on 2 permits): 257 completed, 43 in progress, 17 never finaled, 9 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 326.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 23, 2026 | In progress issued Sep 2026 | 830 41st Av | Reliable Construction Inc | recommencement and completion of work approved under pa # 202107265070Details
recommencement and completion of work approved under pa # 202107265070 | $71,000 |
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 810 Vallejo St | Reliable Construction Inc | foundation replacement.Details
foundation replacement. | $45,000 |
| Sep 11, 2026 | In progress issued Sep 2026 | 283 Bemis St | Reliable Construction Inc | replace stair step tiles in kind, provide new waterproofing at front of house. total stair repair less than 50%Details
replace stair step tiles in kind, provide new waterproofing at front of house. total stair repair less than 50% | $25,000 |
| Aug 19, 2026 | In progress issued Aug 2026 | 2068 Great Hy | Reliable Construction Inc | new upper floor wood deck and exterior stairDetails
new upper floor wood deck and exterior stair | $25,000 |
| Aug 19, 2026 | In progress issued Sep 2026 | 3620 Ulloa St | Reliable Construction Inc | infill of (e) space under (e) 2nd floor. garage conversion into livable space. new bathroom.Details
infill of (e) space under (e) 2nd floor. garage conversion into livable space. new bathroom. | $85,000 |
| Jul 24, 2026 | In progress issued Sep 2026 | 1164 Fulton St | Reliable Construction Inc | to address planning enforcement case 2026-002043enf gr fl: close door from landing to unit and install 12 cubic foot refrigerator. legalize media room.Details
to address planning enforcement case 2026-002043enf gr fl: close door from landing to unit and install 12 cubic foot refrigerator. legalize media room. | $1,000 |
| Jul 15, 2026 | In progress issued Jul 2026 | 4334 19th St | Reliable Construction Inc | remodel kitchen - cabinets, flooring, appliances.Details
remodel kitchen - cabinets, flooring, appliances. | $53,000 |
| Jul 14, 2026 | In progress issued Jul 2026 | 812 Vallejo St | Reliable Construction Inc | remodel kitchen and bath in kind. repair drywall from pipe refit.Details
remodel kitchen and bath in kind. repair drywall from pipe refit. | $61,000 |
| Jul 9, 2026 | In progress issued Jul 2026 | 656 Douglass St | Reliable Construction Inc | top unit main floor & roof: a new kitchen, new laundry , new pantry, new windows and doors at the rear facade, new heating and cooling unit. remodel of a few non-structural interior walls and a raised ceiling in the new living room. set incluses structural engineering and title 24 information.Details
top unit main floor & roof: a new kitchen, new laundry , new pantry, new windows and doors at the rear facade, new heating and cooling unit. remodel of a few non-structural interior walls and a raised ceiling in the new living room. set incluses structural engineering and title 24 information. | $75,000 |
| Jul 9, 2026 | In progress issued Jul 2026 | 24 Thor Av | Reliable Construction Inc | revise pa# 202412237305 to add structural strengthening at skylights and removal of wall at 2nd floorDetails
revise pa# 202412237305 to add structural strengthening at skylights and removal of wall at 2nd floor | $15,000 |
| Jul 9, 2026 | In progress issued Jul 2026 | 820 Vallejo St | Reliable Construction Inc | remodel kitchen and bathroom in kind. no wall moves.Details
remodel kitchen and bathroom in kind. no wall moves. | $61,000 |
| Jun 22, 2026 | Expired or cancelled cancelled Jul 2026 | 1 Topaz Wy | Bayside Builders Group Inc, Reliable Construction Inc | remodel bathroom, change out counter top. upgrade house electrical.Details
remodel bathroom, change out counter top. upgrade house electrical. | $41,000 |
| Jun 16, 2026 | In progress issued Jun 2026 | 63 Jules Av | Reliable Construction Inc | add bathroom at garage level.Details
add bathroom at garage level. | $38,000 |
| Jun 8, 2026 | In progress issued Jun 2026 | 1538 Shafter Av | Reliable Construction Inc | to obtain final inspection for work performed under pa#'s 201909171805 and 202201216376. all work is complete.Details
to obtain final inspection for work performed under pa#'s 201909171805 and 202201216376. all work is complete. | |
| Jun 4, 2026 | In progress issued Jun 2026 | 1505 Revere Av | Reliable Construction Inc | revise/expand the scope of the previously approved, no plans kitchen and bath remodel 2026-0527-2003 p/a to include interior remodel of unit 203 to create a new bathroom, bedroom and office. new partition walls, finishes, cabinetry, fistures, plumbing, lighting.Details
revise/expand the scope of the previously approved, no plans kitchen and bath remodel 2026-0527-2003 p/a to include interior remodel of unit 203 to create a new bathroom, bedroom and office. new partition walls, finishes, cabinetry, fistures, plumbing, lighting. | $63,000 |
| Jun 2, 2026 | In progress issued Jun 2026 | 1416 25th Av | Reliable Construction Inc | partial kitchen remodel. (new countertop psiny cabinets). 2 bathroom remodel in kind. replace floors, modernize laundry - add door to laundry closet.Details
partial kitchen remodel. (new countertop psiny cabinets). 2 bathroom remodel in kind. replace floors, modernize laundry - add door to laundry closet. | $75,000 |
| May 27, 2026 | In progress issued May 2026 | 63 Jules Av | Reliable Construction Inc | remodel kitchen & bathroom in kindDetails
remodel kitchen & bathroom in kind | $41,000 |
| May 27, 2026 | In progress issued May 2026 | 1505 Revere Av | Reliable Construction Inc | unit #203: remodel kitchen and one bathroom in kind. no change to wall layout. no change to floor layout. no structural work.Details
unit #203: remodel kitchen and one bathroom in kind. no change to wall layout. no change to floor layout. no structural work. | $55,000 |
| May 14, 2026 | Completed final sign-off Jul 2026 | 1782 27th Av | Reliable Construction Inc | bathroom remodel- 47 sqft , all fixtures in same location. like for like.Details
bathroom remodel- 47 sqft , all fixtures in same location. like for like. | $27,000 |
| May 11, 2026 | In progress issued Sep 2026 | 1424 Underwood Av | Reliable Construction Inc | erect 2-story, type 5b, detached adu at rear, with 3-bedrooms, 2-baths, kitchen, living room and office nook.Details
erect 2-story, type 5b, detached adu at rear, with 3-bedrooms, 2-baths, kitchen, living room and office nook. | $200,000 |
| May 4, 2026 | In progress issued May 2026 | 24 Thor Av | Reliable Construction Inc | kitchen and bathroom remodel in kind. no wall changes.Details
kitchen and bathroom remodel in kind. no wall changes. | $53,000 |
| Apr 29, 2026 | Completed final sign-off Jul 2026 | 1527 10th Av | Reliable Construction Inc | revision to pa 202506118447 expand unit @ 1st fl to add bedroom to aduDetails
revision to pa 202506118447 expand unit @ 1st fl to add bedroom to adu | $5,000 |
| Apr 16, 2026 | In progress issued Apr 2026 | 213 06th Av | Reliable Construction Inc | revision to pa 202603167634 (repair front step <50%) replace (e) wood stair in-kind; repair (e) upper deck/landing in-kind new steel railing at deck stairDetails
revision to pa 202603167634 (repair front step <50%) replace (e) wood stair in-kind; repair (e) upper deck/landing in-kind new steel railing at deck stair | $3,000 |
| Apr 14, 2026 | In progress issued Apr 2026 | 1350 Ortega St | Reliable Construction Inc | revision to 202603046957 to include: new sliding glass door and window in bedroom 1. seismic retrofit to account for new door and window.Details
revision to 202603046957 to include: new sliding glass door and window in bedroom 1. seismic retrofit to account for new door and window. | $9,000 |
| Apr 1, 2026 | In progress issued Apr 2026 | 1099 Holloway Av | Reliable Construction Inc | revision 202505216951 to include reconfigure proposed deck and steps. remove platform liftDetails
revision 202505216951 to include reconfigure proposed deck and steps. remove platform lift | |
| Mar 31, 2026 | Completed final sign-off Jun 2026 | 660 Douglass St | Reliable Construction Inc | kitchen/bath remodel, no wall movesDetails
kitchen/bath remodel, no wall moves | $58,000 |
| Mar 18, 2026 | In progress issued Jun 2026 | 332 Hill St | Reliable Construction Inc | revision to pa 202511109295 to add additional structural strengthening; add floor to the existing loft/mezzanine area above (e) master bedroom; interior remove (e) sprial stairs and install new stair to the mezzanine; add new skylight above the mezzanineDetails
revision to pa 202511109295 to add additional structural strengthening; add floor to the existing loft/mezzanine area above (e) master bedroom; interior remove (e) sprial stairs and install new stair to the mezzanine; add new skylight above the mezzanine | $30,000 |
| Mar 16, 2026 | In progress issued Mar 2026 | 213 06th Av | Reliable Construction Inc | repair front steps less than 50%Details
repair front steps less than 50% | $10,000 |
| Mar 4, 2026 | In progress issued Mar 2026 | 1350 Ortega St | Reliable Construction Inc | convert (e) garage/basement area into livable space with 2 bedrooms and 1 bathroom; remove wall between existing garage and hallDetails
convert (e) garage/basement area into livable space with 2 bedrooms and 1 bathroom; remove wall between existing garage and hall | $80,000 |
| Feb 25, 2026 | Completed final sign-off Jul 2026 | 307 Oak St | Reliable Construction Inc | interior column removal on 3rd floor level and voluntary wall structural strengthening, no other workDetails
interior column removal on 3rd floor level and voluntary wall structural strengthening, no other work | $9,000 |
| Feb 9, 2026 | Completed final sign-off Apr 2026 | 39 West View Av | Reliable Construction Inc | bathroom remodel in kind.Details
bathroom remodel in kind. | $35,000 |
| Feb 5, 2026 | Completed final sign-off May 2026 | 1845 Pacheco St | Reliable Construction Inc | 2/f: remodel (1) existing bathroom in kind.Details
2/f: remodel (1) existing bathroom in kind. | $30,000 |
| Feb 3, 2026 | Completed final sign-off May 2026 | 1845 Pacheco St | Reliable Construction Inc | revise pa#202601274651 to include adding insulation on all exterior walls & ceiling and replacing damaged plaster from roof leaking. approx. 1000 sq ft. 5/8" type x sheet rock only.Details
revise pa#202601274651 to include adding insulation on all exterior walls & ceiling and replacing damaged plaster from roof leaking. approx. 1000 sq ft. 5/8" type x sheet rock only. | $6,000 |
| Feb 3, 2026 | Completed final sign-off Feb 2026 | 939 Castro St | Reliable Construction Inc | to obtain final inspection for work approved under pa# 202409181060, 202411074607, 202501138227.Details
to obtain final inspection for work approved under pa# 202409181060, 202411074607, 202501138227. | |
| Jan 29, 2026 | Completed final sign-off Feb 2026 | 1215 Oak St | Reliable Construction Inc | renovate exterior stairs (less than 50% repair) at east side of the bldg to meet sb 721, add balusters and handrail. add pickets and graspable handrail to existing guardrail.Details
renovate exterior stairs (less than 50% repair) at east side of the bldg to meet sb 721, add balusters and handrail. add pickets and graspable handrail to existing guardrail. | $1,500 |
| Jan 27, 2026 | Completed final sign-off May 2026 | 1845 Pacheco St | Reliable Construction Inc | work on 2nd floor. kitchen remodel in kind. rewire kitchen, 2 bedrooms, 2 rooms.Details
work on 2nd floor. kitchen remodel in kind. rewire kitchen, 2 bedrooms, 2 rooms. | $38,000 |
| Jan 26, 2026 | Completed final sign-off Mar 2026 | 822 31st Av | Reliable Construction Inc | repair approx 700 sq ft of siding by putting blu skin and hardie plan siding to existing siding. new materials. back of bldg, non street visible.Details
repair approx 700 sq ft of siding by putting blu skin and hardie plan siding to existing siding. new materials. back of bldg, non street visible. | $22,000 |
| Jan 22, 2026 | Completed final sign-off Sep 2026 | 275 Christopher Dr | Reliable Construction Inc | convert portion of the garage into a master bedroom with walk in closet and master bath, family room and dedicated laundry room with a closet. voluntary seismic upgrade.Details
convert portion of the garage into a master bedroom with walk in closet and master bath, family room and dedicated laundry room with a closet. voluntary seismic upgrade. | $68,000 |
| Jan 12, 2026 | Completed final sign-off Mar 2026 | 32 Sussex St | Reliable Construction Inc | bathroom remodel, replace fixtures, title, cabinets etc.Details
bathroom remodel, replace fixtures, title, cabinets etc. | $22,000 |
| Dec 17, 2025 | Completed final sign-off Jul 2026 | 307 Oak St | Reliable Construction Inc | remodel kitchen, like for like. no wall moves, no added fixtures or appliances. approx. 80sqft.Details
remodel kitchen, like for like. no wall moves, no added fixtures or appliances. approx. 80sqft. | $53,000 |
| Dec 5, 2025 | Completed final sign-off Jul 2026 | 275 Christopher Dr | Reliable Construction Inc | remodel (2) bathrooms in kind. remodel kitchen in kind. upgrade panel to 200 amps. install new he (high efficiency) furnace.Details
remodel (2) bathrooms in kind. remodel kitchen in kind. upgrade panel to 200 amps. install new he (high efficiency) furnace. | $53,000 |
| Dec 3, 2025 | Completed final sign-off Dec 2025 | 2375 24th Av | Reliable Construction Inc | to comply with nov 202547252. repair dryrot rear stairs less than 50% non street facing.Details
to comply with nov 202547252. repair dryrot rear stairs less than 50% non street facing. | $6,000 |
| Nov 10, 2025 | Completed final sign-off Jan 2026 | 1350 Ortega St | Reliable Construction Inc | replace approx 750 sq ft tongue & groove with tongue & groove wood siding or hardy plank. street visible. atisan v groove or similar (street visible)Details
replace approx 750 sq ft tongue & groove with tongue & groove wood siding or hardy plank. street visible. atisan v groove or similar (street visible) | $15,000 |
| Nov 10, 2025 | In progress issued Nov 2025 | 332 Hill St | Reliable Construction Inc | new window installation in exterior east wall and structural strengthening.Details
new window installation in exterior east wall and structural strengthening. | $28,000 |
| Nov 7, 2025 | Completed final sign-off Dec 2025 | 230 Ritch St | Reliable Construction Inc | remove/replace deck in kind for reroofing. reroofing done by another contractor. repair existing deck in-kindDetails
remove/replace deck in kind for reroofing. reroofing done by another contractor. repair existing deck in-kind | $1,000 |
| Nov 6, 2025 | Completed final sign-off Dec 2025 | 236 Ritch St | Reliable Construction Inc | revise 202510217819 to add/document structrual detail and delineate scope of work to 236 ritch only. repair (e) deck in kind.Details
revise 202510217819 to add/document structrual detail and delineate scope of work to 236 ritch only. repair (e) deck in kind. | $250 |
| Oct 30, 2025 | Completed final sign-off Feb 2026 | 471 30th St | Reliable Construction Inc | unit# 3 and 5: 2 kitchen remodels. replace 3 windows not visible from the street in kind. upgrade main panel in kind. change out 2 bathroon fans.Details
unit# 3 and 5: 2 kitchen remodels. replace 3 windows not visible from the street in kind. upgrade main panel in kind. change out 2 bathroon fans. | $47,000 |
| Oct 22, 2025 | Completed final sign-off May 2026 | 2290 26th Av | Reliable Construction Inc | revise pa #202510097140 to change location of beams.Details
revise pa #202510097140 to change location of beams. | $250 |
| Oct 21, 2025 | Completed final sign-off Dec 2025 | 236 Ritch St | Reliable Construction Inc | replace roof deck inkind for roof replacement finish.Details
replace roof deck inkind for roof replacement finish. | $12,000 |
| Oct 16, 2025 | In progress issued Oct 2025 | 332 Hill St | Reliable Construction Inc | remodel 2 bathrooms in kind, like for like, same locationDetails
remodel 2 bathrooms in kind, like for like, same location | $68,000 |
| Oct 16, 2025 | Completed final sign-off Jun 2026 | 1499 Sanchez St | Reliable Construction Inc | kitchen remodel, bathrooms remodel, remove wall between kitchen and dining room.Details
kitchen remodel, bathrooms remodel, remove wall between kitchen and dining room. | $100,000 |
| Oct 16, 2025 | In progress issued Oct 2025 | 1152 Green St | Reliable Construction Inc | (n) 498 sq ft private roof deck at 2nd floor roofDetails
(n) 498 sq ft private roof deck at 2nd floor roof | $50,000 |
| Oct 14, 2025 | Completed final sign-off Nov 2025 | 1584 Funston Av | Reliable Construction Inc | add (n) non-structural partition wall in (e) 3rd fl living room to create (n) study area. no structural work/no other workDetails
add (n) non-structural partition wall in (e) 3rd fl living room to create (n) study area. no structural work/no other work | $1,000 |
| Oct 9, 2025 | Completed final sign-off May 2026 | 2290 26th Av | Reliable Construction Inc | remove interior wall between the dining room and the kitchenDetails
remove interior wall between the dining room and the kitchen | $9,000 |
| Oct 3, 2025 | Completed final sign-off Nov 2025 | 103 Downey St | Reliable Construction Inc | replace existing nonconforming deck/stair due to dryrot deck and stairs.Details
replace existing nonconforming deck/stair due to dryrot deck and stairs. | $3,500 |
| Sep 8, 2025 | Completed final sign-off Mar 2026 | 2290 26th Av | Reliable Construction Inc | remodel kicthen and 2 bathrooms in kind. no wall moves or structual changes.Details
remodel kicthen and 2 bathrooms in kind. no wall moves or structual changes. | $70,000 |
| Sep 5, 2025 | In progress issued Sep 2025 | 332 Hill St | Reliable Construction Inc | remodel kitchen and bath in kind.Details
remodel kitchen and bath in kind. | $72,000 |
| Sep 2, 2025 | In progress issued Sep 2025 | 30 Delgado Pl | Reliable Construction Inc | repair damaged drywall from house rewire. replace (e) deck on slab with trex-approx 120sf.Details
repair damaged drywall from house rewire. replace (e) deck on slab with trex-approx 120sf. | $21,000 |
| Aug 28, 2025 | Completed final sign-off Feb 2026 | 105 Trumbull St | Reliable Construction Inc | replace dryrot and replace 3-ply stucco less than 100 sf at front of house.Details
replace dryrot and replace 3-ply stucco less than 100 sf at front of house. | $15,000 |
| Aug 18, 2025 | Completed final sign-off Sep 2025 | 533 Shields St | Reliable Construction Inc | replace siding at rear with new hardie plank siding. repair dry rot that has become apparent. not street visible approx 400sq ft.Details
replace siding at rear with new hardie plank siding. repair dry rot that has become apparent. not street visible approx 400sq ft. | $5,000 |
| Jul 29, 2025 | Completed final sign-off Nov 2025 | 167 Cresta Vista Dr | Reliable Construction Inc | conversion of (e) laundry into 1/2 bath. partial conversion of (e) living room into office. replace (1) (e) picture window with an operable window. add (1) (n) window in office space.Details
conversion of (e) laundry into 1/2 bath. partial conversion of (e) living room into office. replace (1) (e) picture window with an operable window. add (1) (n) window in office space. | $35,000 |
| Jul 29, 2025 | In progress issued Nov 2025 | 2167 Union St | Reliable Construction Inc | remodel of office, kitchenette and bathroom- wall paper, appliances, fixtures, doors, paint etc. like for like.Details
remodel of office, kitchenette and bathroom- wall paper, appliances, fixtures, doors, paint etc. like for like. | $35,000 |
| Jul 24, 2025 | Completed final sign-off Aug 2026 | 1527 10th Av | Reliable Construction Inc | (n) adu unit on the ground level.Details
(n) adu unit on the ground level. | $35,000 |
| Jul 14, 2025 | In progress issued Jul 2025 | 1152 Green St | Reliable Construction Inc | upgrade wiring at (e) addresses and repair all walls opened up for rewiring and minor plumbing repairs. (5/8 gyp-x)Details
upgrade wiring at (e) addresses and repair all walls opened up for rewiring and minor plumbing repairs. (5/8 gyp-x) | $25,000 |
| Jul 14, 2025 | Completed final sign-off Aug 2025 | 2146 12th Av | Reliable Construction Inc | demo and replace deck tile surface at backyard. repair any dryrot damage(if necessary). deck approx. 200sq. ft.Details
demo and replace deck tile surface at backyard. repair any dryrot damage(if necessary). deck approx. 200sq. ft. | $15,000 |
| Jun 23, 2025 | Completed final sign-off Nov 2025 | 167 Cresta Vista Dr | Reliable Construction Inc | replace siding in kind, less than 50%.Details
replace siding in kind, less than 50%. | $9,000 |
| Jun 17, 2025 | In progress issued Jun 2025 | 167 Cresta Vista Dr | Reliable Construction Inc | revision to pa# 202505277261 add scope of work to include dryrot repair at front stairs less than 50% in kind. upgrade electrical service to 200 amps (patch and repair as needed).Details
revision to pa# 202505277261 add scope of work to include dryrot repair at front stairs less than 50% in kind. upgrade electrical service to 200 amps (patch and repair as needed). | $8,000 |
| Jun 4, 2025 | Completed final sign-off Oct 2025 | 1634 Hayes St | Reliable Construction Inc | revision to pa 202503273178 structural strengthening partition wall discovered to bee load bearing of roofDetails
revision to pa 202503273178 structural strengthening partition wall discovered to bee load bearing of roof | $6,400 |
| Jun 3, 2025 | In progress issued Sep 2025 | 1099 Holloway Av | Reliable Construction Inc | addition to (e) sfr in rear yard, new bedroom, closet, bathroom over crawl space. minor remodel to (e) bedrooms. new exterior doors, windows and deck. see "project scope" on cover page for complete descriptions for this permit.Details
addition to (e) sfr in rear yard, new bedroom, closet, bathroom over crawl space. minor remodel to (e) bedrooms. new exterior doors, windows and deck. see "project scope" on cover page for complete descriptions for this permit. | $120,000 |
| May 30, 2025 | Completed final sign-off Nov 2025 | 763 36th Av | Reliable Construction Inc | remodel kitchen, relocate window, 2 remodel bathrooms, add 2 new skylights, and infill interior lightwell (18 sq ft). upgrade panel to 200 amps.Details
remodel kitchen, relocate window, 2 remodel bathrooms, add 2 new skylights, and infill interior lightwell (18 sq ft). upgrade panel to 200 amps. | $75,000 |
| May 13, 2025 | In progress filed May 2025, not yet issued | 890 Wisconsin St | Reliable Construction Inc | concrete repair at garage level.Details
concrete repair at garage level. | $20,000 |
| Apr 29, 2025 | Completed final sign-off Apr 2025 | 58 Rudden Av | Reliable Construction Inc | to obtain final inspection for work approved on 202012181367. all work is complete.Details
to obtain final inspection for work approved on 202012181367. all work is complete. | |
| Apr 28, 2025 | Completed final sign-off Nov 2025 | 890 Wisconsin St | Reliable Construction Inc | legalize/ remodel existing ground floor space bedroom, bathroom, kitchenette with 2-burner and laundry. remove non conforming patio below existing deck.Details
legalize/ remodel existing ground floor space bedroom, bathroom, kitchenette with 2-burner and laundry. remove non conforming patio below existing deck. | $75,000 |
| Apr 2, 2025 | Completed final sign-off Apr 2025 | 375 Crestmont Dr | Reliable Construction Inc | add new electric water heater. repair drywall damageDetails
add new electric water heater. repair drywall damage | $3,500 |
| Apr 2, 2025 | Completed final sign-off Apr 2025 | 377 Crestmont Dr | Reliable Construction Inc | replace existing water heater with an electric water heater; repair any drywall damage.Details
replace existing water heater with an electric water heater; repair any drywall damage. | $3,500 |
| Apr 1, 2025 | Completed final sign-off Jun 2025 | 442 Arkansas St | Reliable Construction Inc | replace siding at front of house with hardi plank. approx 400 sq ftDetails
replace siding at front of house with hardi plank. approx 400 sq ft | $19,000 |
| Mar 27, 2025 | Completed final sign-off Oct 2025 | 1634 Hayes St | Reliable Construction Inc | non structural interior remodel of kitchen, bathroom, laundry room. new exterior windows not street visibleDetails
non structural interior remodel of kitchen, bathroom, laundry room. new exterior windows not street visible | $45,000 |
| Mar 19, 2025 | Completed final sign-off Jun 2025 | 890 Wisconsin St | Reliable Construction Inc | 2/f: revision to permit 202503031456 to include adding a 2nd bathroom, minor non-structural wall moves and adding a closet in a bedroom.Details
2/f: revision to permit 202503031456 to include adding a 2nd bathroom, minor non-structural wall moves and adding a closet in a bedroom. | $25,000 |
| Mar 3, 2025 | Completed final sign-off Jun 2025 | 890 Wisconsin St | Reliable Construction Inc | remodel bathroom in kind, repair back deck dryrot 25%Details
remodel bathroom in kind, repair back deck dryrot 25% | $35,000 |
| Feb 27, 2025 | In progress issued Mar 2025 | 496 Hazelwood Av | Reliable Construction Inc | move (e) bedroom wallDetails
move (e) bedroom wall | $3,100 |
| Feb 10, 2025 | In progress issued Feb 2025 | 496 Hazelwood Av | Reliable Construction Inc | rewire house (new electrical panel), repair drywall in-kind as needed for electrical wiring, repair dripping hose bibs. select demo and replace in kind sheetrock as needed for electrical.Details
rewire house (new electrical panel), repair drywall in-kind as needed for electrical wiring, repair dripping hose bibs. select demo and replace in kind sheetrock as needed for electrical. | $15,000 |
| Feb 4, 2025 | Completed final sign-off Apr 2025 | 1216 Treat Av | Reliable Construction Inc | revision to pa 202501158408 plans for full front stair replacement in-kindDetails
revision to pa 202501158408 plans for full front stair replacement in-kind | $4,000 |
| Jan 17, 2025 | Completed final sign-off Mar 2025 | 822 31st Av | Reliable Construction Inc | repair 280 sqft siding/dry rot in rear light wellDetails
repair 280 sqft siding/dry rot in rear light well | $12,000 |
| Jan 15, 2025 | Completed final sign-off Apr 2025 | 1216 Treat Av | Reliable Construction Inc | repair front steps due to dryrot. all work in-kind less than 40%.Details
repair front steps due to dryrot. all work in-kind less than 40%. | $20,000 |
| Jan 13, 2025 | In progress issued Jan 2025 | 939 Castro St | Reliable Construction Inc | revision to pa#: 202311211263, 202409181060, 202411074607. revised layout of garage, 1st level hall 1, hall 2 + office, (e) to remain stair supports. structural revised ceiling framing at 1st level entry ceiling.Details
revision to pa#: 202311211263, 202409181060, 202411074607. revised layout of garage, 1st level hall 1, hall 2 + office, (e) to remain stair supports. structural revised ceiling framing at 1st level entry ceiling. | $1,900 |
| Dec 17, 2024 | Completed final sign-off Dec 2024 | 3417 16th St | Reliable Construction Inc | to obtain final inspection for work approved under pa# 202001303214. all work is complete.Details
to obtain final inspection for work approved under pa# 202001303214. all work is complete. | |
| Dec 17, 2024 | Completed final sign-off Dec 2024 | 3417 16th St | Reliable Construction Inc | to obtain final inspection for work approved under pa# 202012231636, 202006168832, 202002124299. all work is complete.Details
to obtain final inspection for work approved under pa# 202012231636, 202006168832, 202002124299. all work is complete. | |
| Dec 12, 2024 | Completed final sign-off Feb 2025 | 745 Chestnut St | Reliable Construction Inc | remodel bathroom in kind.Details
remodel bathroom in kind. | $42,000 |
| Dec 10, 2024 | Completed final sign-off Jan 2025 | 8 Gaviota Wy | Reliable Construction Inc | add a 2nd bathroom at 2nd flr, add a french drain at backyard. no structural changes.Details
add a 2nd bathroom at 2nd flr, add a french drain at backyard. no structural changes. | $52,000 |
| Dec 5, 2024 | Completed final sign-off Feb 2025 | 58 Rudden Av | Reliable Construction Inc | remodel bathroom in-kind no wall movesDetails
remodel bathroom in-kind no wall moves | $30,000 |
| Nov 18, 2024 | Completed final sign-off Dec 2024 | 470 Greenwich St | Reliable Construction Inc | remove and replace existing rooftop deck tand ducting to enable reroofing to be done. about 320 sq ft replace using ipe deck tiles. re-roofing pa 202407055863 & pm 20240819480Details
remove and replace existing rooftop deck tand ducting to enable reroofing to be done. about 320 sq ft replace using ipe deck tiles. re-roofing pa 202407055863 & pm 20240819480 | $18,000 |
| Nov 7, 2024 | In progress issued Nov 2024 | 939 Castro St | Reliable Construction Inc | revision to 202311211263 and pa #202409181060: remove and relocate interior doors at 1st fl. widen closet doors and door/window tags at 2nd fl. remove ev charger. structural: revised windows, lot line footing and beam detail.Details
revision to 202311211263 and pa #202409181060: remove and relocate interior doors at 1st fl. widen closet doors and door/window tags at 2nd fl. remove ev charger. structural: revised windows, lot line footing and beam detail. | $2,500 |
| Oct 28, 2024 | Completed final sign-off Jan 2025 | 8 Gaviota Wy | Reliable Construction Inc | remodel kitchen and bathroom in kind; replace in kind and no change in layout.Details
remodel kitchen and bathroom in kind; replace in kind and no change in layout. | $42,000 |
| Oct 24, 2024 | Completed final sign-off Jan 2025 | 18 Harlow St | Reliable Construction Inc | minor revision in foundation structural ref pa 202107023713 & 202404230612Details
minor revision in foundation structural ref pa 202107023713 & 202404230612 | |
| Oct 24, 2024 | Completed final sign-off Dec 2024 | 47 Elizabeth St | Reliable Construction Inc | replace dryrot and handrails at front steps. less than 40%. replace backwall siding w/ hardiplank.Details
replace dryrot and handrails at front steps. less than 40%. replace backwall siding w/ hardiplank. | $9,000 |
| Oct 17, 2024 | Completed final sign-off Nov 2024 | 106 Cordova St | Reliable Construction Inc | remodel (e) bathroom in kind, no change in plumbing fixture count, no wall demolition or construction.Details
remodel (e) bathroom in kind, no change in plumbing fixture count, no wall demolition or construction. | $32,000 |
| Oct 12, 2024 | In progress issued Apr 2026 | 643 39th Av | Reliable Construction Inc | remodel (e) kitchen. remove (e) load bearing wall at hallway. add (n) bath to master bedroom. add (n) media room to garage level. infill addition below (e) 2nd story sunroom at rear yard.Details
remodel (e) kitchen. remove (e) load bearing wall at hallway. add (n) bath to master bedroom. add (n) media room to garage level. infill addition below (e) 2nd story sunroom at rear yard. | $65,000 |
| Sep 26, 2024 | Completed final sign-off May 2025 | 2547 42nd Av | Reliable Construction Inc | revision to pa #202204262976. structural revisions based on field conditions.Details
revision to pa #202204262976. structural revisions based on field conditions. | |
| Sep 25, 2024 | Completed final sign-off Jan 2025 | 1505 Revere Av | Reliable Construction Inc | unit 101- kitchen/bath remodel, add bathroom and remove walls.Details
unit 101- kitchen/bath remodel, add bathroom and remove walls. | $65,000 |
| Sep 18, 2024 | In progress issued Sep 2024 | 939 Castro St | Reliable Construction Inc | revise pa#: 202311211263 to add foundation detailDetails
revise pa#: 202311211263 to add foundation detail | $4,800 |