Angelito Perez
- License
- CA68198
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- On San Francisco permits
- Jul 2021 to Aug 2026
6 permits since 2000 (engineer on 6 permits): 4 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Pineda Construction Inc (2), Gadi Construction Inc, Homee Renovation Llc, Huston General Contracting Inc., Reliable Construction Inc
- Engineers
- Andrew Leahy, Brian Litteken, Joseph Krewson
Where they worked
- Single-family 3
- Multi-family (2-family, apartments) 0
- Commercial 1
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 19, 2026 | In progress issued Aug 2026 | 2068 Great Hy | Reliable Construction Inc | new upper floor wood deck and exterior stairDetails
new upper floor wood deck and exterior stair | $25,000 |
| Sep 24, 2024 | Completed final sign-off Aug 2025 | 44 Yerba Buena Av | Homee Renovation Llc | 1) relocate laundry, furance, water heater. 2)garage storage covered to a 278 sqft game room & gym. 3) add a full bath in the basement. 4) remodel the ktichen total 188 sqft. 5) remodel master bathroom and wic. 6) adding laundry on 2nd flr. 7) replace all (e) door & (e) window with same designDetails
1) relocate laundry, furance, water heater. 2)garage storage covered to a 278 sqft game room & gym. 3) add a full bath in the basement. 4) remodel the ktichen total 188 sqft. 5) remodel master bathroom and wic. 6) adding laundry on 2nd flr. 7) replace all (e) door & (e) window with same design | $150,000 |
| May 21, 2024 | In progress issued Dec 2025 | 2055 Folsom St | Huston General Contracting Inc. | non-residentail electrical upgrades to an existing (utility bldg) wireles telecommunications service facility. removal of asphalt paing, minor soil removal at equipment pads, new conc equip pad, and electrical equipment. no additional floor area proposedDetails
non-residentail electrical upgrades to an existing (utility bldg) wireles telecommunications service facility. removal of asphalt paing, minor soil removal at equipment pads, new conc equip pad, and electrical equipment. no additional floor area proposed | $90,000 |
| Mar 29, 2024 | Completed final sign-off Mar 2025 | 4630 19th St | Gadi Construction Inc | kitchen remodel, remove bearing wall, install new construction window.Details
kitchen remodel, remove bearing wall, install new construction window. | $30,000 |
| Feb 23, 2024 | Completed final sign-off Jul 2024 | 180 Church St | Pineda Construction Inc | g/f -vacant space; insulatoin, drywall, and electrical repair, fire damage in commercial. to comply with nov# 202173282Details
g/f -vacant space; insulatoin, drywall, and electrical repair, fire damage in commercial. to comply with nov# 202173282 | $30,000 |
| Jul 19, 2021 | Completed final sign-off Dec 2021 | 1457 09th Av | Pineda Construction Inc | sound mitigation ceiling only and addition toilet for child and replace sink add floor drain in child bathroom replace floor tile and remove light and reinstall and remove old carpet and install new floor and paint.Details
sound mitigation ceiling only and addition toilet for child and replace sink add floor drain in child bathroom replace floor tile and remove light and reinstall and remove old carpet and install new floor and paint. | $18,000 |