Jace Levinson
- Listed as
- architect, authorized agent-others, designer
- Firm
- Jace Architecture
- Based in
- Oakland
- On San Francisco permits
- Nov 2000 to Dec 2024
74 permits since 2000 (architect on 66 permits, authorized agent-others on 9 permits, designer on 1 permit): 58 completed, 3 in progress, 5 never finaled, 8 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 18, 2024 | Completed final sign-off Mar 2025 | 4131 Balboa St | remove (e) rear deck and stair and build (n) deck at both 4131 and 4133 balboa stDetails
remove (e) rear deck and stair and build (n) deck at both 4131 and 4133 balboa st | $38,450 | |
| Sep 20, 2024 | Completed final sign-off Nov 2024 | 4133 Balboa St | demolish existing storage room at rear yard grade level. storage space is accessed from rear yard only and is not part of either dwelling unit. building shall revert to origianal configuration.Details
demolish existing storage room at rear yard grade level. storage space is accessed from rear yard only and is not part of either dwelling unit. building shall revert to origianal configuration. | $5,000 | |
| Aug 21, 2024 | Completed final sign-off Aug 2025 | 1139 Bay St | L H Gao Construction Inc. | replace (12) alum windows at front facade at second and third floors with new wood insert windows. no change to openings or exterior trim. at 1141 bay st (top floor) remodel kitchen, remodel 1/2 bath.Details
replace (12) alum windows at front facade at second and third floors with new wood insert windows. no change to openings or exterior trim. at 1141 bay st (top floor) remodel kitchen, remodel 1/2 bath. | $96,500 |
| Apr 11, 2024 | In progress issued May 2024 | 3515 Fillmore St | North Point Construction | revision to 202209093733: change to ground fl plan to included new half bath w/ sink & toilet in common area garage. unit a & b layout changeDetails
revision to 202209093733: change to ground fl plan to included new half bath w/ sink & toilet in common area garage. unit a & b layout change | |
| Nov 8, 2023 | In progress filed Nov 2023, not yet issued | 4131 Balboa St | legalize(e)rear yard storage room @ grade,situated one level below main entry on balboa st.the space has access from the rear yard only and is not part of any dwellin unit.space is 124 square feet with an average head height of 7"4".Details
legalize(e)rear yard storage room @ grade,situated one level below main entry on balboa st.the space has access from the rear yard only and is not part of any dwellin unit.space is 124 square feet with an average head height of 7"4". | $27,500 | |
| Feb 7, 2023 | Completed final sign-off Nov 2023 | 587 47th Av | Quality General Construction Co Inc | remodel kitcen and bath @ upper leve w/ new finishes & fixtures. new door & window replacement @ indoor lightwell (not visible from st). new window sash replacement @ front (existing window frame & trim not change)Details
remodel kitcen and bath @ upper leve w/ new finishes & fixtures. new door & window replacement @ indoor lightwell (not visible from st). new window sash replacement @ front (existing window frame & trim not change) | $72,500 |
| Dec 20, 2021 | Completed final sign-off Feb 2026 | 127 08th Av | L H Gao Construction Inc. | remodel front and rear facades with new windows, doors, siding and trim. demolish existing rear breakfast room and full bath at 2nd fl, and constuct new breakfast room, full bath, exterior deck and stairs to grade. project also includes interior remodel of kitchen.Details
remodel front and rear facades with new windows, doors, siding and trim. demolish existing rear breakfast room and full bath at 2nd fl, and constuct new breakfast room, full bath, exterior deck and stairs to grade. project also includes interior remodel of kitchen. | $135,000 |
| Feb 12, 2021 | Completed final sign-off Aug 2021 | 264 28th St | Urbnbuild Inc | revision to pa #201904097477 - 5 new windows at rear of house along the side, not visible from street. new hot water radiant heating in floor for new addition, rather than using (e) forced air furnace. remove a closet and enlarging a bathroom. new guardrail for roof deck, not visibleDetails
revision to pa #201904097477 - 5 new windows at rear of house along the side, not visible from street. new hot water radiant heating in floor for new addition, rather than using (e) forced air furnace. remove a closet and enlarging a bathroom. new guardrail for roof deck, not visible | $8,500 |
| Sep 9, 2020 | In progress issued Nov 2023 | 3515 Fillmore St | North Point Construction | remodel ground fl at rear of garage to create two new adu's per ordiance 162-6 add access hallway from main entry & (n) posts/bm at garage parking areas. unit a is 495 sf. unit b is 700 sf. unit a is formed from the existing space at the lower level of current unit #107.**maher n/a**Details
remodel ground fl at rear of garage to create two new adu's per ordiance 162-6 add access hallway from main entry & (n) posts/bm at garage parking areas. unit a is 495 sf. unit b is 700 sf. unit a is formed from the existing space at the lower level of current unit #107.**maher n/a** | $345,000 |
| Apr 9, 2019 | Completed final sign-off Aug 2021 | 264 28th St | Urbnbuild Inc | addition of a new stairhall on 23st side of the building to access new habitable space @ the ground floor consisting of family room, family room alcove & full bathroom. new roof deck on top family room.Details
addition of a new stairhall on 23st side of the building to access new habitable space @ the ground floor consisting of family room, family room alcove & full bathroom. new roof deck on top family room. | $285,000 |
| Apr 1, 2019 | Never finaled issued Apr 2019, no final | 3483 Sacramento St | comply w/mandatory disability access improvement program, new front door & automatic push buttons. comply with ordinance 51-16.Details
comply w/mandatory disability access improvement program, new front door & automatic push buttons. comply with ordinance 51-16. | $3,500 | |
| Aug 31, 2017 | Completed final sign-off Nov 2017 | 325 Mississippi St | demolish (e) rear exterior stair and replace in kind.Details
demolish (e) rear exterior stair and replace in kind. | $22,500 | |
| May 24, 2017 | Completed final sign-off Jan 2018 | 1209 Shrader St | Graham Moore Construction Inc | remodel existing kitchen & full bath. add 1/2 bath. front living room to be altered to become a bedroom. new replacement of windows at rear porch. seismic improvements at ground floor level.Details
remodel existing kitchen & full bath. add 1/2 bath. front living room to be altered to become a bedroom. new replacement of windows at rear porch. seismic improvements at ground floor level. | $124,500 |
| Apr 26, 2017 | Completed final sign-off Nov 2021 | 14 White St | L H Gao Construction Inc. | remodel (e) 1st & 2nd flr. add (n) 3rd story. home shall be (2) bedrooms, 2.5 baths, living, dining, kitchen & (2) car tandem garage.Details
remodel (e) 1st & 2nd flr. add (n) 3rd story. home shall be (2) bedrooms, 2.5 baths, living, dining, kitchen & (2) car tandem garage. | $620,000 |
| Jan 17, 2017 | Never finaled issued Aug 2017, no final | 1209 Shrader St | Graham Moore Construction Inc | new exterior deck @ rear of property approx 4'6" above grade, and new single french door to replace existing window.Details
new exterior deck @ rear of property approx 4'6" above grade, and new single french door to replace existing window. | $18,500 |
| Nov 9, 2016 | Completed final sign-off Jun 2017 | 1042 Sanchez St | remodel kitchen, add new property line window.Details
remodel kitchen, add new property line window. | $45,000 | |
| Aug 4, 2016 | Completed final sign-off Jul 2019 | 1631 Chestnut St | North Point Construction | remodel (e) rear portion of ground floor to create new one bedroom one bath dwelling unit. ref pa (soft story) 201508033119Details
remodel (e) rear portion of ground floor to create new one bedroom one bath dwelling unit. ref pa (soft story) 201508033119 | $137,500 |
| May 4, 2016 | Completed final sign-off Feb 2018 | 25 Alvarado St | Dore Const. Of Calif. Inc. | construct new deck @second floor dwelling unit. see variance case 2014.1591v. comply w/n.o.v. 201558351Details
construct new deck @second floor dwelling unit. see variance case 2014.1591v. comply w/n.o.v. 201558351 | $30,000 |
| May 4, 2016 | Expired or cancelled withdrawn Aug 2016 | 23 Alvarado St | legalize (e) unpermitted dwg unit @rear of property. add striping to driveway, provide 1 hr fire prot. @front building along exit pathway. comply with conditions of approval on variance case 2014.1591v & conditional use 20141591cvDetails
legalize (e) unpermitted dwg unit @rear of property. add striping to driveway, provide 1 hr fire prot. @front building along exit pathway. comply with conditions of approval on variance case 2014.1591v & conditional use 20141591cv | $85,000 | |
| Jan 13, 2016 | Completed final sign-off Apr 2016 | 402 Jackson St | Greatwall Building Construction Inc | the project involves converting an extg office on the 2nd floor to a kitchenette with new sink, dw, & ref. at 3rd floor an extg kitchenette will be remodeled and enlarged with the addition of an adjacent closet. n/a for maher.Details
the project involves converting an extg office on the 2nd floor to a kitchenette with new sink, dw, & ref. at 3rd floor an extg kitchenette will be remodeled and enlarged with the addition of an adjacent closet. n/a for maher. | $28,750 |
| Dec 21, 2015 | Completed final sign-off May 2016 | 3989 24th St | Jame L Kelly Construction | commercial tenant improvement gr fl to create fitness studio. includes new unisex restroom. includes removal of post and new structural beam. new hvac unitDetails
commercial tenant improvement gr fl to create fitness studio. includes new unisex restroom. includes removal of post and new structural beam. new hvac unit | $52,500 |
| Dec 17, 2014 | Completed final sign-off Jul 2015 | 190 Emmet Ct | Bay Build Design Inc | front building: to comply with physical report #cc-7698, remove of decks and unpermitted unit in attic. legalize (2) skylights, add new attic access hatch.Details
front building: to comply with physical report #cc-7698, remove of decks and unpermitted unit in attic. legalize (2) skylights, add new attic access hatch. | $10,000 |
| Oct 22, 2014 | Completed final sign-off Oct 2020 | 23 Alvarado St | Dore Const. Of Calif. Inc. | legalize existing unpermitted dwelling unit located on 2nd floor of garage structure in the rear of the property. the subject unit is one bedroom with full bath and kitchen(note: this project is subject of variance and conditional use applications) note: subject unit is in a preestanding separate,Details
legalize existing unpermitted dwelling unit located on 2nd floor of garage structure in the rear of the property. the subject unit is one bedroom with full bath and kitchen(note: this project is subject of variance and conditional use applications) note: subject unit is in a preestanding separate, | $39,000 |
| Dec 16, 2013 | Completed final sign-off Jun 2014 | 2740 Union St | remdoel existing room at basement to create 2 new bedrooms, and 1 ful bath. project includes all new finihses, new windows and doors, new slabDetails
remdoel existing room at basement to create 2 new bedrooms, and 1 ful bath. project includes all new finihses, new windows and doors, new slab | $56,200 | |
| Aug 20, 2013 | Completed final sign-off Feb 2014 | 734 San Jose Av | North Point Construction | interior remodel to existing 2/f, new kitchen and bathrooms, new roof framing and reinforcement.Details
interior remodel to existing 2/f, new kitchen and bathrooms, new roof framing and reinforcement. | $55,000 |
| Aug 6, 2013 | Completed final sign-off Feb 2014 | 264 28th St | rev. to pa# 201205311619. reconfigure kitchen and 1/2 bath. add skylight at stairwell and window at kitchen. new beams and intermediate structural framing at second floor. new collar tres at existing gabled roof.Details
rev. to pa# 201205311619. reconfigure kitchen and 1/2 bath. add skylight at stairwell and window at kitchen. new beams and intermediate structural framing at second floor. new collar tres at existing gabled roof. | $17,500 | |
| Jan 24, 2013 | Completed final sign-off Jun 2013 | 1 Daniel Burnham Ct | interior remodel of ste 1602, with finishes and fixtures project includes a new kitchen, new bathroom, and new lighting througout. walls to be removed at kitchen are non load bearing.Details
interior remodel of ste 1602, with finishes and fixtures project includes a new kitchen, new bathroom, and new lighting througout. walls to be removed at kitchen are non load bearing. | $137,500 | |
| Jan 8, 2013 | Completed final sign-off Jun 2013 | 125 Santa Paula Av | interior remodel of the 2nd floor master bedroom suite. scope of work includes all new fixtures and finishes at the master bath. new change to the existing ceiling structure to create interior volume. no exterior changes.Details
interior remodel of the 2nd floor master bedroom suite. scope of work includes all new fixtures and finishes at the master bath. new change to the existing ceiling structure to create interior volume. no exterior changes. | $97,500 | |
| May 31, 2012 | Completed final sign-off Feb 2014 | 264 28th St | this project involves the internal remodel and the addition @ the rear of the house. the scope of work inclueds new bedrooms & bathrooms @ the second floor level & a new family room & deck @ the first floor level.Details
this project involves the internal remodel and the addition @ the rear of the house. the scope of work inclueds new bedrooms & bathrooms @ the second floor level & a new family room & deck @ the first floor level. | $430,000 | |
| May 2, 2012 | Completed final sign-off May 2015 | 33 White St | interior remodel & addition @ the rear of the house. scope of work includes a new bedroom & bathroom @ ground floor & extension of kitchen & deck @ upper floor level.Details
interior remodel & addition @ the rear of the house. scope of work includes a new bedroom & bathroom @ ground floor & extension of kitchen & deck @ upper floor level. | $327,500 | |
| Feb 29, 2012 | Completed final sign-off Mar 2014 | 2214 Jones St | this project involves the addition of the a new internal spiral stair to access the roof and a new roof deck.Details
this project involves the addition of the a new internal spiral stair to access the roof and a new roof deck. | $63,749 | |
| May 4, 2011 | Expired or cancelled withdrawn Aug 2011 | 291 Page St | add a garage(240 sf).1st level-incl 15 sf addition to the front bay.lower level to provide for a garage door. demo front retaining wall & regrading the public right of way with a curb curb addition will be req for a new driveway.Details
add a garage(240 sf).1st level-incl 15 sf addition to the front bay.lower level to provide for a garage door. demo front retaining wall & regrading the public right of way with a curb curb addition will be req for a new driveway. | $76,420 | |
| Apr 4, 2011 | Completed final sign-off Oct 2011 | 26 Piedmont St | Phollies Inc | the scope of work includes demolition of existing kitchen and half bath at lower level ( unit 26 piedmont st) to provide storage areas. the remodel intends to merge 26 piedmont st w/ 30 piedmont st.Details
the scope of work includes demolition of existing kitchen and half bath at lower level ( unit 26 piedmont st) to provide storage areas. the remodel intends to merge 26 piedmont st w/ 30 piedmont st. | $13,750 |
| Aug 9, 2010 | Completed final sign-off Apr 2011 | 390 Bay Shore Bl | Becca Construction Inc | t.i. to create new gym facility.new dbl dr entries at frt facade. new womens&mens restrms at 1/fl.new stairs to connect 1st&2nd fls.2 new pits ecavated at 1/fl.new lighting,finishes,mech wk provided.new windows&doors.public assembly permit is req fr sffd,sprinkler/fy under sep permit.Details
t.i. to create new gym facility.new dbl dr entries at frt facade. new womens&mens restrms at 1/fl.new stairs to connect 1st&2nd fls.2 new pits ecavated at 1/fl.new lighting,finishes,mech wk provided.new windows&doors.public assembly permit is req fr sffd,sprinkler/fy under sep permit. | $247,000 |
| Apr 30, 2010 | Never finaled issued May 2010, no final | 681 47th Av | rev. to previously approved permit 2009100078466. reduced scope of work including omitting proposed rear deck and stairs & omitting (n) 1-hour walls @ north and south sides of property. rev. also includes omitting (n) windows & doors @ the rear facade & (n) layout @ 1st. flr.Details
rev. to previously approved permit 2009100078466. reduced scope of work including omitting proposed rear deck and stairs & omitting (n) 1-hour walls @ north and south sides of property. rev. also includes omitting (n) windows & doors @ the rear facade & (n) layout @ 1st. flr. | ||
| Apr 9, 2010 | Completed final sign-off Jul 2011 | 2527 15th Av | 1st floor; remodel (e) unfinished space & creation of horizontal extension @ rear yard. 1st floor is proposed to have a new family room, new bedroom, new bath, new laundry, new hallway & new stair to 2nd floor. 2nd floor; remodel (e) kitchen, (e) bath, (e)hallway & horizontal extensionDetails
1st floor; remodel (e) unfinished space & creation of horizontal extension @ rear yard. 1st floor is proposed to have a new family room, new bedroom, new bath, new laundry, new hallway & new stair to 2nd floor. 2nd floor; remodel (e) kitchen, (e) bath, (e)hallway & horizontal extension | $237,700 | |
| Feb 5, 2010 | Completed final sign-off Jun 2010 | 1928 Fillmore St | Phollies Inc | tenant improvement includes new display units, new lighting, new wall finishes & floor finishes. there will be alterations to the windows at the front & side facages. there will be alterations to the second rear means of egress at the rear/side of property. exterior signage under separate permit.Details
tenant improvement includes new display units, new lighting, new wall finishes & floor finishes. there will be alterations to the windows at the front & side facages. there will be alterations to the second rear means of egress at the rear/side of property. exterior signage under separate permit. | $72,600 |
| Dec 16, 2009 | Completed final sign-off Oct 2010 | 416 Jersey St | Phollies Inc | demo (e)stairway &construct a new stairway at new location, connecting 1st,2nd & 3rd floors.at 1st fl.(e) habitable space, remodel to create new study and full bath.at 2nd floor new half bath to be added and (e)kitchen and bath remodel.3rd floor. (e) master bath to be remodel.new hvac & windowsDetails
demo (e)stairway &construct a new stairway at new location, connecting 1st,2nd & 3rd floors.at 1st fl.(e) habitable space, remodel to create new study and full bath.at 2nd floor new half bath to be added and (e)kitchen and bath remodel.3rd floor. (e) master bath to be remodel.new hvac & windows | $200,000 |
| Oct 7, 2009 | Completed final sign-off Sep 2011 | 681 47th Av | new family room & new bath at 1st floor & remodel kitchen, full bath & new 1/2 bath at 2nd floor. proposed interior stair at (e) location to be widened and includes vertical addition for head room clearance. exterior remodel includes new rear decks and stairs.Details
new family room & new bath at 1st floor & remodel kitchen, full bath & new 1/2 bath at 2nd floor. proposed interior stair at (e) location to be widened and includes vertical addition for head room clearance. exterior remodel includes new rear decks and stairs. | $162,500 | |
| Sep 23, 2009 | Completed final sign-off Sep 2010 | 850 Powell St | unit 605 - remove non load bearing wall partition at existing kitchen/dining rm. space will be reconfigured to creat new conjoined kitchen/dining space. bath 1 and 2 will be remodeled with new pictures/finishes. no structural work in this project. no alterationDetails
unit 605 - remove non load bearing wall partition at existing kitchen/dining rm. space will be reconfigured to creat new conjoined kitchen/dining space. bath 1 and 2 will be remodeled with new pictures/finishes. no structural work in this project. no alteration | $62,500 | |
| Dec 15, 2008 | Completed final sign-off Jul 2010 | 1254 Bush St | front bldg-remodeling the kitchen @ the 2nd floor, remodeling the bathrioom & 1/2 bathroom @ 3rd floor. enlarging 2 interior wall openings, installing new wood windows @ (e) locations. installing a new heat pump furnace on the roof (400 pds). work only @ 1254 bush street, ground floorDetails
front bldg-remodeling the kitchen @ the 2nd floor, remodeling the bathrioom & 1/2 bathroom @ 3rd floor. enlarging 2 interior wall openings, installing new wood windows @ (e) locations. installing a new heat pump furnace on the roof (400 pds). work only @ 1254 bush street, ground floor | $87,400 | |
| Dec 15, 2008 | Completed final sign-off Oct 2009 | 1250 Bush St | Iturralde Construction Co | rear bldg-remodeling the kitchen @1st floor, remodeling the bathroom & 1/2 bathroom @2nd floor. enlarging 2 interior wall openings. installing new wood windows @ (e) locations. installing a new furnace in the basementDetails
rear bldg-remodeling the kitchen @1st floor, remodeling the bathroom & 1/2 bathroom @2nd floor. enlarging 2 interior wall openings. installing new wood windows @ (e) locations. installing a new furnace in the basement | $82,900 |
| Oct 22, 2008 | Completed final sign-off Nov 2008 | 511 Euclid Av | to ocmplete work and obtain final inspection for work approved under pa#200707136769.Details
to ocmplete work and obtain final inspection for work approved under pa#200707136769. | $14,750 | |
| Aug 29, 2008 | Completed final sign-off Mar 2009 | 201 Mendell St | change of use from office/warehouse to office and assembly for entertainmentand amusement purposes. new mechanical, structural support, elec/lighting, and new floor and wall finishes. disabled access upgrades, including bathrooms. sprinklers & fire alarm under separate permit.Details
change of use from office/warehouse to office and assembly for entertainmentand amusement purposes. new mechanical, structural support, elec/lighting, and new floor and wall finishes. disabled access upgrades, including bathrooms. sprinklers & fire alarm under separate permit. | $315,000 | |
| Jun 20, 2008 | Completed final sign-off May 2009 | 822 Lake St | Phollies Inc | extending internal stairway down one level from 2nd flr to 1st floor; new partitions @ 1st floor to create (n) bedroom, (n) bath, (n) media room and laundry, new windows and door to be added to media room connecting to rear yard.Details
extending internal stairway down one level from 2nd flr to 1st floor; new partitions @ 1st floor to create (n) bedroom, (n) bath, (n) media room and laundry, new windows and door to be added to media room connecting to rear yard. | $87,500 |
| Mar 11, 2008 | Completed final sign-off Aug 2008 | 2520 Gough St | Art Of Construction Inc | install new elevator, modify existing walls to create elevator shaft from 1st to 4th floor. install new forced heat system at 4th floor only to replace existing wall heaters. new closet on 4th floor. no change to exterior envelope.Details
install new elevator, modify existing walls to create elevator shaft from 1st to 4th floor. install new forced heat system at 4th floor only to replace existing wall heaters. new closet on 4th floor. no change to exterior envelope. | $185,000 |
| Feb 12, 2008 | Completed final sign-off Jul 2008 | 1396 Mcallister St | Sigura Construction Inc | remodel portion of existing 2430 sf flat. the project includes removing & replace all finishes & fixtures @ existing kitchen, dining room , half bathroom & bath #2, laundry. also includes installation of forced air heating system and on demand water heater.Details
remodel portion of existing 2430 sf flat. the project includes removing & replace all finishes & fixtures @ existing kitchen, dining room , half bathroom & bath #2, laundry. also includes installation of forced air heating system and on demand water heater. | $215,000 |
| Feb 8, 2008 | Completed final sign-off Jun 2008 | 101 Townsend St | interior tenant improvement to construct new non load bearing partitions, install new lighting, new wall finishes and new floor finishes on the ground floor.Details
interior tenant improvement to construct new non load bearing partitions, install new lighting, new wall finishes and new floor finishes on the ground floor. | $76,000 | |
| Feb 7, 2008 | Completed final sign-off Jun 2011 | 45 Aztec St | new 2 story horizontal addition both front and back of bldg. new exterior deck at the rear. interior remodel, including new habitable area and master bath.Details
new 2 story horizontal addition both front and back of bldg. new exterior deck at the rear. interior remodel, including new habitable area and master bath. | $194,900 | |
| Jan 17, 2008 | Never finaled issued Jan 2008, no final | 313 28th St | Mark Louis Collins | interior remodel & reconfigure internal arrangments of existing units @ upper & lower levels. new kitchen, baths & windows. add 1 bathroom & relocate 2nd in upper & lower.Details
interior remodel & reconfigure internal arrangments of existing units @ upper & lower levels. new kitchen, baths & windows. add 1 bathroom & relocate 2nd in upper & lower. | $150,000 |
| Jul 27, 2007 | Expired or cancelled expired Aug 2008 | 365 Vermont St | Browncoconstruction And Development Inc | project is to remove (e) non-load bearing partitions as shown on attached plan. there are no alterations proposed to the structural system or mechanical system under this permit. diable access upgrades to comply with 20% rule. fully sprinkler building.mech. & lighting under seperate permit.Details
project is to remove (e) non-load bearing partitions as shown on attached plan. there are no alterations proposed to the structural system or mechanical system under this permit. diable access upgrades to comply with 20% rule. fully sprinkler building.mech. & lighting under seperate permit. | $41,050 |
| Jul 13, 2007 | Completed final sign-off Nov 2008 | 511 Euclid Av | demolish 1 story garage/storage building.Details
demolish 1 story garage/storage building. | ||
| Jul 13, 2007 | Never finaled issued Dec 2007, no final | 511 Euclid Av | erect 1 story, shed/storage building.Details
erect 1 story, shed/storage building. | $14,750 | |
| Jun 20, 2007 | Completed final sign-off Nov 2008 | 511 Euclid Av | renovate front facade with new wood siding and new stucco. new wood trellis at entry. new gate at driveway. new paving at driveway. new windows at lower family room. new rear deck.Details
renovate front facade with new wood siding and new stucco. new wood trellis at entry. new gate at driveway. new paving at driveway. new windows at lower family room. new rear deck. | $78,500 | |
| May 22, 2007 | Completed final sign-off Jul 2007 | 130 Lexington St | remodel extg kchn and bathroom units at 132b lexington street. remove all finishes an fixtures & install new cabinetary, appliances, electrical & plmbing. this project does not involve new horizontal or vertical square footage. there is no change to the envelope of the building. we are removing oneDetails
remodel extg kchn and bathroom units at 132b lexington street. remove all finishes an fixtures & install new cabinetary, appliances, electrical & plmbing. this project does not involve new horizontal or vertical square footage. there is no change to the envelope of the building. we are removing one | $35,000 | |
| Mar 30, 2007 | Completed final sign-off Apr 2007 | 860 Elizabeth St | Phollies Inc | renew pa# 2005/05/03/1421 for final inspection only.Details
renew pa# 2005/05/03/1421 for final inspection only. | |
| Mar 20, 2007 | Expired or cancelled expired Jul 2008 | 70 Santa Clara Av | Structure Construction | renovate (e) bathrooms with new fixtures, finishes. new exterior windows, doors. replaced in (e) window/door locations. no structural changes.Details
renovate (e) bathrooms with new fixtures, finishes. new exterior windows, doors. replaced in (e) window/door locations. no structural changes. | $62,000 |
| Mar 12, 2007 | Completed final sign-off Nov 2007 | 130 Jersey St | remove extg 2 story deck and stair and construct new 2 story deck and stair.Details
remove extg 2 story deck and stair and construct new 2 story deck and stair. | $12,500 | |
| Jan 30, 2007 | Completed final sign-off Mar 2008 | 2526 Greenwich St | Thompson Suskind L P | (e) building has 4 levels legal construction-1 unit on 3/fl,910 units on 2/fl, a housekeeping unit on 1/fl & a social hall at bsmt.this permit is to integrate housekeeping unit&social hall at bsmt as 1 unit.there is no net loss or gain of legal units,nor is there an alteration to foorprt of bldg....Details
(e) building has 4 levels legal construction-1 unit on 3/fl,910 units on 2/fl, a housekeeping unit on 1/fl & a social hall at bsmt.this permit is to integrate housekeeping unit&social hall at bsmt as 1 unit.there is no net loss or gain of legal units,nor is there an alteration to foorprt of bldg.... | $135,000 |
| Jan 8, 2007 | Completed final sign-off Jun 2007 | 130 Lexington St | work @ units at 132a only. remodel (e) kitchen & bathroom. remove all finishes & fixtures & install new cabinetry, appliances, electrical & plumbing. this project does not involve new horizontal or vertical square footage. there is no change to the envelope of the building. remove 1 non-loadDetails
work @ units at 132a only. remodel (e) kitchen & bathroom. remove all finishes & fixtures & install new cabinetry, appliances, electrical & plumbing. this project does not involve new horizontal or vertical square footage. there is no change to the envelope of the building. remove 1 non-load | $50,000 | |
| Aug 3, 2006 | Completed final sign-off Nov 2007 | 2251 Chestnut St | Del Rey Construction Inc | new horizontal exterior of existing ground floor retail space within volume of existing roof. new storefront & signage. submitted on aug 1, 2006 for site permit only. complaint #199705922.Details
new horizontal exterior of existing ground floor retail space within volume of existing roof. new storefront & signage. submitted on aug 1, 2006 for site permit only. complaint #199705922. | $96,500 |
| Jun 23, 2006 | Completed final sign-off Jan 2007 | 130 Lexington St | remodel existing kitchen & bathroom units at 130 & 132 lexington street. remove all finishes & fixtures, install new cabinetry,appliances,electrical & plumbing.this project does not involve new horizontal or vertical square footage. there is no change to the envelope of bldg.Details
remodel existing kitchen & bathroom units at 130 & 132 lexington street. remove all finishes & fixtures, install new cabinetry,appliances,electrical & plumbing.this project does not involve new horizontal or vertical square footage. there is no change to the envelope of bldg. | $62,500 | |
| Apr 19, 2006 | Completed final sign-off Sep 2006 | 734 Dolores St | Bob Gorringe Construction | convert ground floor illegal studio living unit to storage space. remove illegal unit per condominium inspection report #3r-4181 prepared 10/12/04.Details
convert ground floor illegal studio living unit to storage space. remove illegal unit per condominium inspection report #3r-4181 prepared 10/12/04. | $9,750 |
| Mar 16, 2006 | Expired or cancelled expired Oct 2008 | 1407 Bush St | remodel vacant ground floor retail space for a new full service restaurant with kitchen & bar.Details
remodel vacant ground floor retail space for a new full service restaurant with kitchen & bar. | $80,234 | |
| Nov 22, 2005 | Completed final sign-off Oct 2007 | 33 Cumberland St | construct new wood frame deck at 2nd & 3rd level. stair down to grade from 2nd level - varian application submitted on 11/3/05 #2005.1025v - no other work.Details
construct new wood frame deck at 2nd & 3rd level. stair down to grade from 2nd level - varian application submitted on 11/3/05 #2005.1025v - no other work. | $12,500 | |
| Nov 14, 2005 | Expired or cancelled cancelled Oct 2007 | 130 Jersey St | construct new wood frame deck @ upper level with new stair to gradeDetails
construct new wood frame deck @ upper level with new stair to grade | $17,500 | |
| Oct 28, 2005 | Expired or cancelled expired Mar 2009 | 287 Page St | Structure Construction | merge units 289 and 291 ain page st bldg into one. building will change from 3 to 2 units or r-1 to r-3 occupancyDetails
merge units 289 and 291 ain page st bldg into one. building will change from 3 to 2 units or r-1 to r-3 occupancy | $85,000 |
| Oct 21, 2005 | Completed final sign-off May 2006 | 35 Cumberland St | remodel kchn & extg bthrm with new finishes and fixtures/add new bthrm at extg rear bdrm/all work is within the extg footprint of the unit/there is no structural workDetails
remodel kchn & extg bthrm with new finishes and fixtures/add new bthrm at extg rear bdrm/all work is within the extg footprint of the unit/there is no structural work | $48,500 | |
| Jun 1, 2005 | Completed final sign-off Oct 2005 | 850 Powell St | replace four (e) windows with new window inserts. no change to openings. new lighting & plaster workDetails
replace four (e) windows with new window inserts. no change to openings. new lighting & plaster work | $17,500 | |
| Jun 1, 2005 | Completed final sign-off May 2006 | 367 Collingwood St | remodel (e) bedroom, bathroom & closet w/new finishes and fixtures, relocate bearing wall betweenDetails
remodel (e) bedroom, bathroom & closet w/new finishes and fixtures, relocate bearing wall between | $42,500 | |
| Jun 24, 2004 | Completed final sign-off Jul 2004 | 551 Clipper St | repair extg exterior rear stairDetails
repair extg exterior rear stair | $2,800 | |
| May 13, 2003 | Expired or cancelled cancelled Mar 2009 | 3851 18th St | to tunnel an off-street parking garage under the front patio.Details
to tunnel an off-street parking garage under the front patio. | $35,000 | |
| Sep 18, 2002 | Completed final sign-off Dec 2003 | 1228 Leavenworth St | install new single car gar age @ street levelDetails
install new single car gar age @ street level | $95,000 | |
| Nov 6, 2000 | Completed final sign-off Oct 2001 | 66 06th Av | horiz. addition at rear of blndg -(n) deckDetails
horiz. addition at rear of blndg -(n) deck | $195,000 |