Ian Dunn
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Openscope Studio
- Based in
- San Francisco
- On San Francisco permits
- Dec 2016 to Aug 2026
29 permits since 2000 (architect on 27 permits, authorized agent-others on 1 permit, engineer on 1 permit): 10 completed, 4 in progress, 9 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 11, 2026 | In progress filed Aug 2026, not yet issued | 65 Ramona Av | revision to bpa 202207128248. replacement of hvac system for 67 ramona. addition of insulation over garage, pocket door b/w office and den, washer/dryer. in kind replacement of (e) window in garage. addition of light fixtures in garage and exit passageway. hose bib and recepticles in rear yard....Details
revision to bpa 202207128248. replacement of hvac system for 67 ramona. addition of insulation over garage, pocket door b/w office and den, washer/dryer. in kind replacement of (e) window in garage. addition of light fixtures in garage and exit passageway. hose bib and recepticles in rear yard.... | ||
| Apr 24, 2026 | In progress issued Jun 2026 | 57 Winfield St | Appetite For Construction Inc | revision to pa# 202601224358, add a decorative stained glass window to the street facing facade. minor revisons to exterior finishes. new scope of work to remodel bath.Details
revision to pa# 202601224358, add a decorative stained glass window to the street facing facade. minor revisons to exterior finishes. new scope of work to remodel bath. | $27,000 |
| Jan 22, 2026 | In progress issued Mar 2026 | 57 Winfield St | Appetite For Construction Inc | replace and center all windows in living room & primary bedroom on front facade. replace and shift primary bathroom window and add skylight to same bathroom. side door near front facade replaced w/a window. rear patio door replaced. rear 1st fl bedroom window replaced.Details
replace and center all windows in living room & primary bedroom on front facade. replace and shift primary bathroom window and add skylight to same bathroom. side door near front facade replaced w/a window. rear patio door replaced. rear 1st fl bedroom window replaced. | $70,000 |
| Nov 7, 2024 | Completed final sign-off Jun 2026 | 2770 Lombard St | Precision Gen. Comm Contractors Inc | rev 201912300982- stairs to be repaired in kind.( less than 50%)Details
rev 201912300982- stairs to be repaired in kind.( less than 50%) | |
| Sep 2, 2022 | Never finaled issued May 2023, no final | 418 Union St | Xspace Builder | the scope of the work is a change of use from a commercial retail space to an residential adu on the 1st floor per planning code section 207(c)(4).Details
the scope of the work is a change of use from a commercial retail space to an residential adu on the 1st floor per planning code section 207(c)(4). | $93,000 |
| Jul 12, 2022 | In progress issued Feb 2024 | 65 Ramona Av | Peak General Contractors Inc | remodel (e) storage space & add a bathroom @ the area of the remodel. horizontal addition @ rear.Details
remodel (e) storage space & add a bathroom @ the area of the remodel. horizontal addition @ rear. | $99,886 |
| Jul 11, 2022 | Never finaled filed Jul 2022, never issued | 1318 Page St | addition of stair connecting garage at level 1 to upper unit at level 2; expand & remodel the kitchen at level 2, to remodel the bathroom at level 2, expand and remodel bedroom & ensuite bathroom at level 3, expand deck at level 4; add 1 adu at level 1 per ordinance 162-16 under separate permit.Details
addition of stair connecting garage at level 1 to upper unit at level 2; expand & remodel the kitchen at level 2, to remodel the bathroom at level 2, expand and remodel bedroom & ensuite bathroom at level 3, expand deck at level 4; add 1 adu at level 1 per ordinance 162-16 under separate permit. | $600,000 | |
| Jul 11, 2022 | Never finaled issued Aug 2023, no final | 418 Union St | Xspace Builder | remodel of unit 418b and storage room. window replacement at residential units. relocation and replacement of hvac equipment.Details
remodel of unit 418b and storage room. window replacement at residential units. relocation and replacement of hvac equipment. | $365,000 |
| Apr 25, 2022 | Never finaled issued Apr 2022, no final | 1964 Post St | Trim Fit Constr. - O'reilly Engineering | unit # 7, #10, #11: interior remodel. move kitchens & convert into bedrooms. no changes to exterior.Details
unit # 7, #10, #11: interior remodel. move kitchens & convert into bedrooms. no changes to exterior. | $83,131 |
| Apr 25, 2022 | Never finaled filed Apr 2022, never issued | 1964 Post St | unit #3: split into 2 separate units.Details
unit #3: split into 2 separate units. | $72,859 | |
| Dec 1, 2021 | Expired or cancelled withdrawn Jan 2026 | 263 Lee Av | erect new 3-story, type vb, 2-unit residential building r-3 occupancy.Details
erect new 3-story, type vb, 2-unit residential building r-3 occupancy. | $600,000 | |
| Dec 1, 2021 | Expired or cancelled withdrawn Jan 2026 | 263 Lee Av | demolish existing type vb, 1-story church.Details
demolish existing type vb, 1-story church. | $42,200 | |
| Dec 18, 2020 | Expired or cancelled withdrawn Aug 2026 | 466 Frederick St | the scope of work is to add 2 detached accessory dwelling units to the rear yard.Details
the scope of work is to add 2 detached accessory dwelling units to the rear yard. | $250,000 | |
| Dec 30, 2019 | Completed final sign-off Jun 2026 | 2770 Lombard St | Precision Gen. Comm Contractors Inc, Curtis Edward Dennison Landscapre Inc | exterior improvements: replace concrete paving w/ unit pav, planting, exterior landscape lighting & exterior fountain, paving, steps & railings. install site furnishings. reconfigure (e) irrigation.Details
exterior improvements: replace concrete paving w/ unit pav, planting, exterior landscape lighting & exterior fountain, paving, steps & railings. install site furnishings. reconfigure (e) irrigation. | $250,000 |
| Dec 30, 2019 | Never finaled issued Jan 2020, no final | 2770 Lombard St | installation of exterior ornamentation to restore historical characteristics of the building. maher naDetails
installation of exterior ornamentation to restore historical characteristics of the building. maher na | $75,000 | |
| Oct 9, 2019 | Completed final sign-off Sep 2023 | 927 Capp St | Western Contractors | rear bldg: per ord# 162-16 add one (n) accessory dwelling unit to rear garage bldg (n) sprinklers to (n) unit. voluntary seismic upgrade bpa# 2019-1008-3864.Details
rear bldg: per ord# 162-16 add one (n) accessory dwelling unit to rear garage bldg (n) sprinklers to (n) unit. voluntary seismic upgrade bpa# 2019-1008-3864. | $72,330 |
| Sep 27, 2019 | Never finaled issued Dec 2019, no final | 2770 Lombard St | Fidelity Roof Company | response to notice of enforcement# 2019015839 enf. inkind patch & repair using same material & texture to match (e) condition in preparation for painting. ** maher: n/a **Details
response to notice of enforcement# 2019015839 enf. inkind patch & repair using same material & texture to match (e) condition in preparation for painting. ** maher: n/a ** | $10,000 |
| Sep 27, 2019 | Never finaled issued Dec 2019, no final | 2770 Lombard St | Fidelity Roof Company | response to notice of enforcement# 2019015839 enf. chimney tops removed & rebuilt lower due to structure concerns. chimneys rebuilt using similar design & location preserving look & feel to previously (e). ** maher: n/a **Details
response to notice of enforcement# 2019015839 enf. chimney tops removed & rebuilt lower due to structure concerns. chimneys rebuilt using similar design & location preserving look & feel to previously (e). ** maher: n/a ** | $10,000 |
| Sep 24, 2019 | Never finaled filed Sep 2019, never issued | 661 Anderson St | legalization of dwelling unit installed w/o permit per ord# 43-14. no work to be perfored.Details
legalization of dwelling unit installed w/o permit per ord# 43-14. no work to be perfored. | ||
| Jun 26, 2018 | Expired or cancelled withdrawn Jun 2022 | 377 Elsie St | Nerland Building And Restoration | rear bldg. convert garage to adu with small kitchen and bath (separate structure) per ordinance #162-16. structural deferred under separate permit: no cfc until structural approval & inspections.Details
rear bldg. convert garage to adu with small kitchen and bath (separate structure) per ordinance #162-16. structural deferred under separate permit: no cfc until structural approval & inspections. | $75,000 |
| Jun 5, 2018 | Completed final sign-off Nov 2020 | 466 Frederick St | Heuer Inc | add units per ord 162-16. add 1 bedroom, 1 bath unit to storage area at the rear portion of the basement per adu ordiance# 162-16.Details
add units per ord 162-16. add 1 bedroom, 1 bath unit to storage area at the rear portion of the basement per adu ordiance# 162-16. | $68,000 |
| Feb 6, 2018 | Completed final sign-off Mar 2021 | 2346 Union St | L E C A Construction Llc | separate rear building, change of use from carport to add two new accessory dwelling units to detached existing rear garage structure per ord 162-16.Details
separate rear building, change of use from carport to add two new accessory dwelling units to detached existing rear garage structure per ord 162-16. | $20,000 |
| Oct 12, 2017 | Completed final sign-off Mar 2018 | 888 Valencia St | Bay City Plumbing | revision to pa#201704053247 & 201708114616, new stackable washer/dryer & new hot water heater. n/a ordinance #155-13, maher n/a.Details
revision to pa#201704053247 & 201708114616, new stackable washer/dryer & new hot water heater. n/a ordinance #155-13, maher n/a. | $3,000 |
| Sep 26, 2017 | Completed final sign-off Jul 2020 | 517 17th Av | Mrcc | add a (n) dwelling unit at the rear portion of the ground floor (studio unit)Details
add a (n) dwelling unit at the rear portion of the ground floor (studio unit) | $40,000 |
| Jun 2, 2017 | Completed final sign-off Mar 2021 | 2350 Union St | L E C A Construction Llc | front building. add 3 new accessory dwelling units to the rear portion of the ground floor per ordinance 162-16.Details
front building. add 3 new accessory dwelling units to the rear portion of the ground floor per ordinance 162-16. | $125,000 |
| Mar 7, 2017 | Completed final sign-off Nov 2018 | 79 09th St | John Sutti & Associates, Inc., Lmnop-Design Inc. | change of use from cafe to medical cannabis dispensary. renovation of bathroom to ada (n) construction standards. hvac system installed, move toilet, (n) drywall, replace doors.Details
change of use from cafe to medical cannabis dispensary. renovation of bathroom to ada (n) construction standards. hvac system installed, move toilet, (n) drywall, replace doors. | $150,000 |
| Dec 21, 2016 | Expired or cancelled withdrawn Feb 2019 | 57 Rosemont Pl | add two new accessory dwelling units to the rear portion of the garage and basement space per ordinance# 162-16.Details
add two new accessory dwelling units to the rear portion of the garage and basement space per ordinance# 162-16. | $100,000 | |
| Dec 21, 2016 | Completed final sign-off May 2023 | 1553 45th Av | Little Feet Renovation | site permit to add 1 new accessory dwelling unit to garage space per add unit ordinance 162-16. ** maher: n/a **Details
site permit to add 1 new accessory dwelling unit to garage space per add unit ordinance 162-16. ** maher: n/a ** | $50,000 |
| Dec 21, 2016 | Expired or cancelled disapproved Dec 2018 | 550 Moultrie St | site permit to remodel portions of levels 1 & 2 with minor structural work. construct a 1 story addition to the rear of the (e) residence.Details
site permit to remodel portions of levels 1 & 2 with minor structural work. construct a 1 story addition to the rear of the (e) residence. | $30,000 |