Hongbo Yang
- Listed as
- architect, engineer
- Firm
- W.H. Consultant Inc.
- Based in
- San Jose
- On San Francisco permits
- Mar 2021 to Mar 2026
24 permits since 2000 (engineer on 23 permits, architect on 1 permit): 15 completed, 7 in progress, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 19, 2026 | In progress issued Mar 2026 | 1330 33rd Av | revision to permit 202512041024. remove 2/f home office creating a larger living room. no front facade change.Details
revision to permit 202512041024. remove 2/f home office creating a larger living room. no front facade change. | $100 | |
| Dec 4, 2025 | In progress issued Feb 2026 | 1330 33rd Av | New Ihome Construction Inc. | 2/f: infill light well (57 sq.ft) kitchen and bathroom re-layout. relocate staircase, add one half bath, one full bath. 1/f: add new living space (909 sq.ft). 2 full baths, 2 bedrooms, a laundry room and one family room with wet bar. radiant heat for house.Details
2/f: infill light well (57 sq.ft) kitchen and bathroom re-layout. relocate staircase, add one half bath, one full bath. 1/f: add new living space (909 sq.ft). 2 full baths, 2 bedrooms, a laundry room and one family room with wet bar. radiant heat for house. | $309,506 |
| Oct 22, 2025 | In progress issued Jun 2026 | 1251 19th Av | Newman General Construction Inc. | convert the ground floor (e) storage area located at the rear of the building to be an adu with 2 new bedrooms, 1 new bathroom & 1 new kitchen / dining space.Details
convert the ground floor (e) storage area located at the rear of the building to be an adu with 2 new bedrooms, 1 new bathroom & 1 new kitchen / dining space. | $85,000 |
| May 27, 2025 | Completed final sign-off Nov 2025 | 270 Claremont Bl | H 2 Construction | revision to pa 202410202766 engineering structural change design from 2x14 to 2x10 to match existing framing. revise structural joist & beam. same layout no change.Details
revision to pa 202410202766 engineering structural change design from 2x14 to 2x10 to match existing framing. revise structural joist & beam. same layout no change. | |
| Dec 1, 2024 | In progress issued Jul 2025 | 125 Stanyan St | Rightway Home Builders Inc, Barcci Builders Inc, C & J's Custom Builds Inc | 1/f: add (1)living room, (1)bedroom, (1)bath and (1)office, add wall to seaparate garage and new living space, add washer & dryer, add (1)new heat-pump fau for 1/f use. 2/f: incorporate atrium into living space, removing wall between kitchen and atrium and side room, add (1)bath, kitchen & (e) bath.Details
1/f: add (1)living room, (1)bedroom, (1)bath and (1)office, add wall to seaparate garage and new living space, add washer & dryer, add (1)new heat-pump fau for 1/f use. 2/f: incorporate atrium into living space, removing wall between kitchen and atrium and side room, add (1)bath, kitchen & (e) bath. | $200,000 |
| Oct 28, 2024 | Completed final sign-off Dec 2025 | 270 Claremont Bl | H 2 Construction | rear yard excavation of 18.4cy.relocate stair.1/f:add 1 bed & 1 bath,interior layout reconfig & remodeling 2/f:add 1 bed & 1 bath; layout reconfig. new windows on ne, new w/h, hvac, floor heating, upgrade 200amp service panel.Details
rear yard excavation of 18.4cy.relocate stair.1/f:add 1 bed & 1 bath,interior layout reconfig & remodeling 2/f:add 1 bed & 1 bath; layout reconfig. new windows on ne, new w/h, hvac, floor heating, upgrade 200amp service panel. | $142,000 |
| Sep 26, 2024 | In progress issued Sep 2024 | 728 Shrader St | Barcci Builders Inc | structural revision to permit 202405232811 to prevent the new post from encroaching onto the neighbor's property based on site condition. the new beam "fb-1" will be a cantilever beam.Details
structural revision to permit 202405232811 to prevent the new post from encroaching onto the neighbor's property based on site condition. the new beam "fb-1" will be a cantilever beam. | |
| May 31, 2024 | Completed final sign-off Mar 2026 | 1080 Hampshire St | Above Engineering Corporation | add 1 unit at gr fl zoning rh2,add 29 sf under 2nd fl overhang at rear, remodel 2nd fl unit. correct deck and stair rear violation 202183612Details
add 1 unit at gr fl zoning rh2,add 29 sf under 2nd fl overhang at rear, remodel 2nd fl unit. correct deck and stair rear violation 202183612 | $350,000 |
| Dec 15, 2023 | In progress filed Dec 2023, not yet issued | 450 Myra Wy | revision to 202103247216: basement bathroom changes, added wetbar @ hallway. storage under staircase. 1st fl added half bath, move closet and laundry rm, 2nd fl living rm & kitchen location swap. relocate 1 window 5 ft to right @ 3rd fl. minor change to approved plan internal & relocate 1 window 5'Details
revision to 202103247216: basement bathroom changes, added wetbar @ hallway. storage under staircase. 1st fl added half bath, move closet and laundry rm, 2nd fl living rm & kitchen location swap. relocate 1 window 5 ft to right @ 3rd fl. minor change to approved plan internal & relocate 1 window 5' | ||
| Jul 7, 2023 | Completed final sign-off Sep 2023 | 3628 Santiago St | revision to bpa#202104219071-s1, provide structural drawing detail for new window @ 1/f media room facing rear yard.Details
revision to bpa#202104219071-s1, provide structural drawing detail for new window @ 1/f media room facing rear yard. | $100 | |
| Dec 13, 2022 | In progress issued Jul 2025 | 3526 24th St | building addition of 799 sf at rear. basement level - add bedrm, bathrm & family rm; 1st level - remodel kitcheh, add 1 bathrm & new living rm; 2nd level - add 1 bathrm & 1 bedrm; new rear stairs to yardDetails
building addition of 799 sf at rear. basement level - add bedrm, bathrm & family rm; 1st level - remodel kitcheh, add 1 bathrm & new living rm; 2nd level - add 1 bathrm & 1 bedrm; new rear stairs to yard | $330,000 | |
| Sep 6, 2022 | Completed final sign-off Mar 2024 | 156 Niagara Av | revise bpa# 202203180327 structural plan. same wall layout.Details
revise bpa# 202203180327 structural plan. same wall layout. | $100 | |
| Jun 6, 2022 | Never finaled issued Jun 2022, no final | 97 Parnassus Av | Realty Builders Inc | convert the (e) living room to a new bathroom, convert the (e) bedroom to (2) new walk in closet, relayout and remodel the kitchen, remodel the utility room (no layout change) combine the water and bathroom into a full bathroomDetails
convert the (e) living room to a new bathroom, convert the (e) bedroom to (2) new walk in closet, relayout and remodel the kitchen, remodel the utility room (no layout change) combine the water and bathroom into a full bathroom | $80,000 |
| Jun 6, 2022 | Never finaled issued Jun 2022, no final | 85 Parnassus Av | Realty Builders Inc | convert (e) living room to a new bathroom; convert (e) bedroom to (2) new walk-in closets; re-layout and remodl the kitchen; remodel the utility room (no layout change). combine the water closet and bathroom to a full bathroomDetails
convert (e) living room to a new bathroom; convert (e) bedroom to (2) new walk-in closets; re-layout and remodl the kitchen; remodel the utility room (no layout change). combine the water closet and bathroom to a full bathroom | $80,000 |
| May 16, 2022 | Completed final sign-off Dec 2022 | 215 San Juan Av | 1st fl - add 1 family room, 1 media room, 1 office, wet bar & 2 full baths (810 sf); 2nd fl - remodel kitchen, bathroom, add 1 bedroom and add 1 full bath; others - relocated interior stairs; add new electrical fireplace, relocated furnace and water heaterDetails
1st fl - add 1 family room, 1 media room, 1 office, wet bar & 2 full baths (810 sf); 2nd fl - remodel kitchen, bathroom, add 1 bedroom and add 1 full bath; others - relocated interior stairs; add new electrical fireplace, relocated furnace and water heater | $120,000 | |
| Apr 26, 2022 | Completed final sign-off Aug 2024 | 2001 San Jose Av | to comply with nov# 202185410 & 202285996. 1st fl - legalize & remodel unpermitted in-law unit, 396 sf with 1 bedroom, 1 full bath & 1 kitchen. add 1 storage room (112 sf). 2nd fl - remove unpermitted sunroom.Details
to comply with nov# 202185410 & 202285996. 1st fl - legalize & remodel unpermitted in-law unit, 396 sf with 1 bedroom, 1 full bath & 1 kitchen. add 1 storage room (112 sf). 2nd fl - remove unpermitted sunroom. | $60,000 | |
| Mar 30, 2022 | Completed final sign-off Jan 2024 | 629 Alvarado St | Hbm Construction Inc | enclose 125 sf space under existing deck storage. alter existing interior stairs.Details
enclose 125 sf space under existing deck storage. alter existing interior stairs. | $39,000 |
| Mar 18, 2022 | Completed final sign-off Mar 2024 | 156 Niagara Av | 2nd fl remodel. add 1 media room, remodel (1) kitchen & (1) bath. add one full bath. 1st fl remodel: relocation of water heater and furnance, add mop sink. update electrical panel to 200 amp.Details
2nd fl remodel. add 1 media room, remodel (1) kitchen & (1) bath. add one full bath. 1st fl remodel: relocation of water heater and furnance, add mop sink. update electrical panel to 200 amp. | $50,000 | |
| Mar 15, 2022 | Completed final sign-off May 2023 | 730 Shrader St | Barcci Builders Inc | 1) kitchen remodel, remove wall between kitchen and living room & wall between kitchen & sunroom. 2) add one new three fixture bathroom. 3) convert living room into bedroom. convert sunroom into dining room.Details
1) kitchen remodel, remove wall between kitchen and living room & wall between kitchen & sunroom. 2) add one new three fixture bathroom. 3) convert living room into bedroom. convert sunroom into dining room. | $36,000 |
| Dec 27, 2021 | Completed final sign-off Nov 2022 | 1355 Monterey Bl | Hutan Construction | revision to bpa #2020/1230/1936,structural work.Details
revision to bpa #2020/1230/1936,structural work. | |
| Jul 28, 2021 | Completed final sign-off Oct 2021 | 3315 Pierce St | Design Max Construction | adding 1 skylight (20"x30") in bathroom. adding 2 skylights (16"x48") in living room.Details
adding 1 skylight (20"x30") in bathroom. adding 2 skylights (16"x48") in living room. | $4,500 |
| Jun 25, 2021 | Completed final sign-off Mar 2025 | 1619 27th Av | Tsl Construction & Consultant Inc | infill central light court; interior stair alteration, reconfigure kitchen; add 2 new bathroom @ ground floor. convert 164 sf storage to living space; add 1 skylightDetails
infill central light court; interior stair alteration, reconfigure kitchen; add 2 new bathroom @ ground floor. convert 164 sf storage to living space; add 1 skylight | $84,000 |
| Apr 12, 2021 | Completed final sign-off Apr 2022 | 10 Brewster St | enclose 89 sf area under (e) dining room at 1st fl. remodel (e) bathroom & kitchen. convert 181 sf of (e) garage to living room. relocate (e) furnace & laundry. replace water heater. replace (e) windows in kind.Details
enclose 89 sf area under (e) dining room at 1st fl. remodel (e) bathroom & kitchen. convert 181 sf of (e) garage to living room. relocate (e) furnace & laundry. replace water heater. replace (e) windows in kind. | $88,000 | |
| Mar 9, 2021 | Completed final sign-off Aug 2023 | 1727 32nd Av | 2nd fl kitchen remodel (220 sqft). remove wall between kitchen & living room. 2nd fl bathroom remodel (130 sqft). remove storage room & add washer/dryer. 1st fl remodel (700 sqft), relocate water heater & furnace. add new window in 1st fl family room.Details
2nd fl kitchen remodel (220 sqft). remove wall between kitchen & living room. 2nd fl bathroom remodel (130 sqft). remove storage room & add washer/dryer. 1st fl remodel (700 sqft), relocate water heater & furnace. add new window in 1st fl family room. | $64,000 |