Wesley Liu
- License
- C60570
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C60570 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- Wesley Liu Engineering
- Based in
- San Jose
- On San Francisco permits
- Dec 2016 to Nov 2026
5 permits since 2000 (engineer on 3 permits, architect on 2 permits): 4 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Dl Propriis Construction Inc (2), Newman General Construction Inc. (2)
- Engineers
- Hongbo Yang
- Subcontractors
- Lusheng Liu
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 3
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 10, 2026 | In progress issued Nov 2026 | 1251 19th Av | Newman General Construction Inc. | revision to 202509235946: add e) column to drawing for proposed kitchen & revised kitchen lighting & outlet locationDetails
revision to 202509235946: add e) column to drawing for proposed kitchen & revised kitchen lighting & outlet location | |
| Jul 30, 2026 | In progress issued Jul 2026 | 25 Midcrest Wy | Dl Propriis Construction Inc | revision to 201612155124 to add window schedule. 1st fl: 2 new windows at front and side, 2nd fl 1 new window, replace 3 existing windows , 3rd fl 9 new windows, 2 sliding doors. all to be glazed vinyl.Details
revision to 201612155124 to add window schedule. 1st fl: 2 new windows at front and side, 2nd fl 1 new window, replace 3 existing windows , 3rd fl 9 new windows, 2 sliding doors. all to be glazed vinyl. | $12,000 |
| Oct 22, 2025 | In progress issued Jun 2026 | 1251 19th Av | Newman General Construction Inc. | convert the ground floor (e) storage area located at the rear of the building to be an adu with 2 new bedrooms, 1 new bathroom & 1 new kitchen / dining space.Details
convert the ground floor (e) storage area located at the rear of the building to be an adu with 2 new bedrooms, 1 new bathroom & 1 new kitchen / dining space. | $85,000 |
| Jul 28, 2017 | Never finaled issued May 2022, no final | 23 Midcrest Wy | Dl Propriis Construction Inc | erect 3-story, type 5, no basement, single family dwelling building.Details
erect 3-story, type 5, no basement, single family dwelling building. | $425,000 |
| Dec 15, 2016 | In progress issued Sep 2024 | 25 Midcrest Wy | fill empty space at lower floor a 249 sf of living space added. vertical addition with 3 bedrooms & 2 bath, remodel main floor, convert two bedrooms & kitchen to family and kitchen remodel bathroom too.Details
fill empty space at lower floor a 249 sf of living space added. vertical addition with 3 bedrooms & 2 bath, remodel main floor, convert two bedrooms & kitchen to family and kitchen remodel bathroom too. | $250,000 |