Homy Sikaroudi
- Listed as
- architect, designer, engineer
- Firm
- West Coast Premier Const.
- Based in
- Oakland
- On San Francisco permits
- Mar 2005 to Jun 2026
90 permits since 2000 (engineer on 81 permits, architect on 8 permits, designer on 2 permits): 85 completed, 1 in progress, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 10, 2026 | In progress issued Jun 2026 | 225 Irving St | West Coast Premier Construction Inc | mandatory sof story retrofit of multi unit apartment building per san francisco sof story ordinance ab107#66-13. no exterior work.Details
mandatory sof story retrofit of multi unit apartment building per san francisco sof story ordinance ab107#66-13. no exterior work. | $110,000 |
| May 8, 2025 | Completed final sign-off Oct 2025 | 8045 Geary Bl | West Coast Premier Construction Inc | voluntary seismic strengthening @ 1st story, limited to install of secondary posts @ beams pocketted into wall and install floor to wall tie-back anchors. no exterior change of esthetics/colorDetails
voluntary seismic strengthening @ 1st story, limited to install of secondary posts @ beams pocketted into wall and install floor to wall tie-back anchors. no exterior change of esthetics/color | $95,000 |
| Apr 16, 2025 | Completed final sign-off Oct 2025 | 1230 La Playa | West Coast Premier Construction Inc | mandatory soft story retrofit of multi unit appartment building per san francisco ord# ab107 #66-13. no exterior work or change of exteriorDetails
mandatory soft story retrofit of multi unit appartment building per san francisco ord# ab107 #66-13. no exterior work or change of exterior | $105,000 |
| Mar 26, 2025 | Completed final sign-off Nov 2025 | 70 25th Av | West Coast Premier Construction Inc | voluntary seismic retrofit of single family residence. no esthetics/exterior change of color.Details
voluntary seismic retrofit of single family residence. no esthetics/exterior change of color. | $95,000 |
| Jan 29, 2025 | Completed final sign-off Aug 2025 | 2454 Fulton St | West Coast Premier Construction Inc | mandatory soft story retrofit of multi unit apartment building per s.f. soft story ordinance ab107 #66-13. no exterior change of esthetics. chapter appendix a4.Details
mandatory soft story retrofit of multi unit apartment building per s.f. soft story ordinance ab107 #66-13. no exterior change of esthetics. chapter appendix a4. | $97,000 |
| Feb 9, 2024 | Completed final sign-off Aug 2024 | 358 Hermann St | West Coast Premier Construction Inc | voluntary foundation strengthing of two story building. no exterior work or change of aestheticDetails
voluntary foundation strengthing of two story building. no exterior work or change of aesthetic | $65,000 |
| Jun 22, 2023 | Completed final sign-off Dec 2023 | 2766 Mission St | West Coast Premier Construction Inc | mandatory soft story retrofit of multi unit building per san francisco soft story ordinance ab107#66-13 no exterior changeDetails
mandatory soft story retrofit of multi unit building per san francisco soft story ordinance ab107#66-13 no exterior change | $80,000 |
| Jun 22, 2023 | Completed final sign-off Dec 2023 | 2766 Mission St | West Coast Premier Construction Inc | handicap accessible expenditure ground fl. portion cost of construction for soft story retrofit ab107#66-13Details
handicap accessible expenditure ground fl. portion cost of construction for soft story retrofit ab107#66-13 | $40,000 |
| Dec 30, 2022 | Completed final sign-off Apr 2024 | 808 Larkin St | West Coast Premier Construction Inc | mandatory disability access imrpovements, no exterior change, abe# 202209304849Details
mandatory disability access imrpovements, no exterior change, abe# 202209304849 | $9,000 |
| Dec 30, 2022 | Completed final sign-off Apr 2024 | 784 Ofarrell St | West Coast Premier Construction Inc | mandatory disability access imrpovements, no exterior change, abe# 202209304850Details
mandatory disability access imrpovements, no exterior change, abe# 202209304850 | $9,000 |
| Dec 30, 2022 | Completed final sign-off Jan 2023 | 1157 Masonic Av | West Coast Premier Construction Inc | as-built field revision to approved soft story permit #202208049868, 202110069925, 201707242794, no exterior change.Details
as-built field revision to approved soft story permit #202208049868, 202110069925, 201707242794, no exterior change. | |
| Dec 30, 2022 | Completed final sign-off Apr 2024 | 800 Larkin St | West Coast Premier Construction Inc | mandatory disability access imrpovements, no exterior change, abe# 202209304848Details
mandatory disability access imrpovements, no exterior change, abe# 202209304848 | $9,000 |
| Sep 27, 2022 | Completed final sign-off Jan 2023 | 11 Crestline Dr | West Coast Premier Construction Inc | mandatory soft story retrofit of multi-unit apartment building per san francisco ordinance ab107 no exterior work or changes.Details
mandatory soft story retrofit of multi-unit apartment building per san francisco ordinance ab107 no exterior work or changes. | $75,000 |
| Jan 31, 2022 | Completed final sign-off Aug 2022 | 610 Cole St | West Coast Premier Construction Inc | mandatory soft story retrofit of multi-unit apartment bldg per sf soft story ordinance ab-107 #6613 (residential)Details
mandatory soft story retrofit of multi-unit apartment bldg per sf soft story ordinance ab-107 #6613 (residential) | $101,000 |
| Sep 10, 2021 | Completed final sign-off Mar 2022 | 1055 Fell St | West Coast Premier Construction Inc | mandatory soft story retrofit of multi-unit apartment building per san francisco soft story ordinance ab.107 #66.13, no exterior work or changes.Details
mandatory soft story retrofit of multi-unit apartment building per san francisco soft story ordinance ab.107 #66.13, no exterior work or changes. | $55,000 |
| Sep 3, 2021 | Completed final sign-off Apr 2022 | 1676 Newcomb Av | West Coast Premier Construction Inc | front bldg: seismic retrofit of unreinforced brick masonry building. general procedure, no exterior work.Details
front bldg: seismic retrofit of unreinforced brick masonry building. general procedure, no exterior work. | $120,000 |
| Sep 19, 2019 | Completed final sign-off Sep 2019 | 20 Romolo Pl | West Coast Premier Construction Inc | field revision to extg permit #201709077145 for soft story retrofitDetails
field revision to extg permit #201709077145 for soft story retrofit | |
| Jul 5, 2019 | Completed final sign-off Jul 2019 | 1350 Stockton St | West Coast Premier Construction Inc | rev to pa#201708104412 due to field conditionsl: structural revisions as noted on plans.Details
rev to pa#201708104412 due to field conditionsl: structural revisions as noted on plans. | |
| Jul 5, 2019 | Completed final sign-off Aug 2019 | 1267 Filbert St | West Coast Premier Construction Inc | rev to pa#201708104412 due to field conditionsl: structural revisions as noted on plans.Details
rev to pa#201708104412 due to field conditionsl: structural revisions as noted on plans. | |
| May 8, 2019 | Completed final sign-off Aug 2019 | 1226 Grant Av | West Coast Premier Construction Inc | field revision to existing approved plans. app# 2018-0914-0202Details
field revision to existing approved plans. app# 2018-0914-0202 | |
| Jan 17, 2019 | Completed final sign-off Sep 2019 | 1190 Haight St | West Coast Premier Construction Inc | soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4 | $140,000 |
| Nov 8, 2018 | Completed final sign-off Apr 2019 | 2240 Pacific Av | West Coast Premier Construction Inc | soft story seismic retrofit of multi unit apartment building per sf soft story ordinance chapter 4d 2016 cebc appendix a4Details
soft story seismic retrofit of multi unit apartment building per sf soft story ordinance chapter 4d 2016 cebc appendix a4 | $120,000 |
| Sep 14, 2018 | Completed final sign-off Aug 2020 | 2400 Polk St | West Coast Premier Construction Inc | commercial: handicap accessibility improvement for soft story seismic retrofit of multi unit apt/retail building pr sf soft story ord ch 4d 2016 cebc appendix a-4.Details
commercial: handicap accessibility improvement for soft story seismic retrofit of multi unit apt/retail building pr sf soft story ord ch 4d 2016 cebc appendix a-4. | $50,000 |
| Sep 14, 2018 | Completed final sign-off Aug 2020 | 2400 Polk St | West Coast Premier Construction Inc | residential:soft story seismic retrofit multi unit apt retail building per sf soft story ord ch 4d 2016 cebc app a-4Details
residential:soft story seismic retrofit multi unit apt retail building per sf soft story ord ch 4d 2016 cebc app a-4 | $100,000 |
| Sep 14, 2018 | Completed final sign-off Aug 2019 | 1226 Grant Av | West Coast Premier Construction Inc | commericial:handicap accessibility improvement for soft story seismic retrofit of multi unit apt/retail building per sf soft story ord ch 4d 2016 cebc app a4.Details
commericial:handicap accessibility improvement for soft story seismic retrofit of multi unit apt/retail building per sf soft story ord ch 4d 2016 cebc app a4. | $50,000 |
| Sep 14, 2018 | Completed final sign-off Aug 2019 | 1226 Grant Av | West Coast Premier Construction Inc | soft story seismic retrofit of multi unit apt/retail building per sf soft story ord ch 4 d 2016 cebc appendix a4Details
soft story seismic retrofit of multi unit apt/retail building per sf soft story ord ch 4 d 2016 cebc appendix a4 | $100,000 |
| Aug 30, 2018 | Completed final sign-off Apr 2019 | 324 Connecticut St | West Coast Premier Construction Inc | to comply with nov - 201722111, soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
to comply with nov - 201722111, soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $110,000 |
| Apr 13, 2018 | Completed final sign-off Oct 2019 | 1350 Powell St | West Coast Premier Construction Inc | commercial - soft sotry seismic retrofit per sfebc chapter 4d engineering criteria appendix a-4. residential soft story under pa 201804136259Details
commercial - soft sotry seismic retrofit per sfebc chapter 4d engineering criteria appendix a-4. residential soft story under pa 201804136259 | $75,000 |
| Apr 13, 2018 | Completed final sign-off Feb 2019 | 277 Pixley St | West Coast Premier Construction Inc | soft story retrofit per sfebc chapter 4d engineering criteris 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteris 2016 cebc appendix a-4 | $104,000 |
| Apr 13, 2018 | Completed final sign-off Oct 2019 | 1350 Powell St | West Coast Premier Construction Inc | residential - soft story retrofit per sfebc chapter 4d engineering 2016 cebc appendix a4. soft story for commercial under pa 201804136257Details
residential - soft story retrofit per sfebc chapter 4d engineering 2016 cebc appendix a4. soft story for commercial under pa 201804136257 | $150,000 |
| Feb 16, 2018 | Completed final sign-off Jul 2019 | 1350 Stockton St | West Coast Premier Construction Inc | residential: soft story retrofit: 2016 cebc appendix a-4 - ordinance #66-13. commercial pa #201802161485.Details
residential: soft story retrofit: 2016 cebc appendix a-4 - ordinance #66-13. commercial pa #201802161485. | $285,000 |
| Feb 16, 2018 | Completed final sign-off Jul 2019 | 1350 Stockton St | West Coast Premier Construction Inc | commercial: soft story retrofit: 2016 cebc appendix a-4- ordinance #66-13. handicap accessibility improvement. residential pa #201802161489.Details
commercial: soft story retrofit: 2016 cebc appendix a-4- ordinance #66-13. handicap accessibility improvement. residential pa #201802161489. | $95,000 |
| Dec 21, 2017 | Completed final sign-off Aug 2018 | 4220 Cesar Chavez St | West Coast Premier Construction Inc | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. | $190,000 |
| Dec 21, 2017 | Completed final sign-off Oct 2018 | 2355 Union St | West Coast Premier Construction Inc | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. | $140,000 |
| Nov 8, 2017 | Completed final sign-off May 2018 | 133 19th Av | West Coast Premier Construction Inc | soft story seismic retrofit of multi unit apartment bldg per san francisco soft story ordinance chapter 4d 2016 cebc appendix a-4.Details
soft story seismic retrofit of multi unit apartment bldg per san francisco soft story ordinance chapter 4d 2016 cebc appendix a-4. | $115,000 |
| Oct 25, 2017 | Completed final sign-off Jan 2018 | 1811 Leavenworth St | West Coast Premier Construction Inc | field revision to pa 2017-0831-6502Details
field revision to pa 2017-0831-6502 | |
| Oct 25, 2017 | Completed final sign-off Apr 2018 | 1741 Greenwich St | West Coast Premier Construction Inc | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $115,000 |
| Oct 25, 2017 | Completed final sign-off Jan 2021 | 332 Fell St | West Coast Premier Construction Inc | field revision to pa 2017-0803-3727Details
field revision to pa 2017-0803-3727 | |
| Sep 28, 2017 | Completed final sign-off Mar 2018 | 1731 Chestnut St | West Coast Premier Construction Inc | soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. | $120,000 |
| Sep 14, 2017 | Completed final sign-off Mar 2018 | 1200 Washington St | West Coast Premier Construction Inc | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $159,000 |
| Aug 24, 2017 | Completed final sign-off Jan 2018 | 41 Crestline Dr | West Coast Premier Construction Inc | soft story seismic retrofit of multi unit wood framed building per san francisco soft story ord chapter 4d sfebc cebc 2016Details
soft story seismic retrofit of multi unit wood framed building per san francisco soft story ord chapter 4d sfebc cebc 2016 | $71,000 |
| Aug 17, 2017 | Completed final sign-off Nov 2017 | 540 Cole St | West Coast Premier Construction Inc | rear building - replacement of (e) wood beam with kind, foundation mudsill anchor bolts and wood stud bracing with plywood and repair of wood stairs. reference permit #201502027205.Details
rear building - replacement of (e) wood beam with kind, foundation mudsill anchor bolts and wood stud bracing with plywood and repair of wood stairs. reference permit #201502027205. | $22,000 |
| Aug 10, 2017 | Completed final sign-off Aug 2019 | 1267 Filbert St | soft story seismic retrofit of multi unit apartment building per sf soft story ordinance chapter 34b iebc 2012 cebc 2016Details
soft story seismic retrofit of multi unit apartment building per sf soft story ordinance chapter 34b iebc 2012 cebc 2016 | $99,000 | |
| Aug 3, 2017 | Completed final sign-off Dec 2017 | 332 Fell St | West Coast Premier Construction Inc | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $48,000 |
| Jul 13, 2017 | Completed final sign-off Jan 2018 | 1560 08th Av | West Coast Premier Construction Inc | soft story seismic retrofit of multi unit apt building per sf soft story ordinance chapter 34b iebc 2012Details
soft story seismic retrofit of multi unit apt building per sf soft story ordinance chapter 34b iebc 2012 | $149,000 |
| Jun 9, 2017 | Completed final sign-off Nov 2017 | 25 Edward St | West Coast Premier Construction Inc | soft story retrofit per sfebc chapter 4d engineering 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering 2016 cebc appendix a-4 | $101,000 |
| Feb 15, 2017 | Completed final sign-off Aug 2017 | 1821 Oak St | West Coast Premier Construction Inc | soft story seismic retrofit of multi unit apartment bld per sf soft story ord chapter 34b iebc 2012 appendix a-4. maher naDetails
soft story seismic retrofit of multi unit apartment bld per sf soft story ord chapter 34b iebc 2012 appendix a-4. maher na | $107,000 |
| Feb 15, 2017 | Completed final sign-off Aug 2017 | 7201 Geary Bl | West Coast Premier Construction Inc | soft story retrofit per sf ord chapter 34b iebc 2012 appendix a-4Details
soft story retrofit per sf ord chapter 34b iebc 2012 appendix a-4 | $115,000 |
| Dec 23, 2016 | Completed final sign-off Feb 2017 | 1270 Pine St | West Coast Premier Construction Inc | field revision on existing pa #201609026658 (soft story retrofit 2012 iebc appendix a-4) - revise 3 shear walls. no exterior work. n/a maher ordinanceDetails
field revision on existing pa #201609026658 (soft story retrofit 2012 iebc appendix a-4) - revise 3 shear walls. no exterior work. n/a maher ordinance | |
| Dec 15, 2016 | Completed final sign-off May 2017 | 3333 Clement St | West Coast Premier Construction Inc | soft story seismic retrofit of multi unit apartment bld per sfbc soft story ord chapter 34b iebc 2012Details
soft story seismic retrofit of multi unit apartment bld per sfbc soft story ord chapter 34b iebc 2012 | $101,000 |
| Dec 15, 2016 | Completed final sign-off Jun 2017 | 655 Stockton St | West Coast Premier Construction Inc | soft story retrofit of mulit unit aparment bld per sfbc soft story ord chapt 34b iebc 2012 maher naDetails
soft story retrofit of mulit unit aparment bld per sfbc soft story ord chapt 34b iebc 2012 maher na | $205,000 |
| Oct 6, 2016 | Completed final sign-off Feb 2017 | 1545 Greenwich St | West Coast Premier Construction Inc | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 | $120,000 |
| Sep 14, 2016 | Completed final sign-off Mar 2017 | 37 States St | West Coast Premier Construction Inc | soft story retrofit per sfbc chapter 34b engineering 2012 iebc appendix a-4. n/a ordinance #155-13Details
soft story retrofit per sfbc chapter 34b engineering 2012 iebc appendix a-4. n/a ordinance #155-13 | $225,000 |
| Sep 9, 2016 | Completed final sign-off Apr 2017 | 1467 07th Av | West Coast Premier Construction Inc | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $115,000 |
| Sep 2, 2016 | Completed final sign-off Feb 2017 | 1270 Pine St | West Coast Premier Construction Inc | soft story seismic retrofit of multi unit apartment building per sf soft story ordinance chapter 34b iebc 2012 appendix a-4.Details
soft story seismic retrofit of multi unit apartment building per sf soft story ordinance chapter 34b iebc 2012 appendix a-4. | $110,000 |
| Jun 9, 2016 | Completed final sign-off Oct 2016 | 1961 Filbert St | West Coast Premier Construction Inc | soft story retrofit per sfbc chapter 34b engineering criteri 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteri 2012 iebc appendix a-4 | $125,000 |
| Mar 10, 2016 | Completed final sign-off Jul 2016 | 1535 48th Av | West Coast Premier Construction Inc | soft story seismic retrofeit of multi unit apartments per sf soft story ordinance chapter 34 b iebc 2012Details
soft story seismic retrofeit of multi unit apartments per sf soft story ordinance chapter 34 b iebc 2012 | $135,000 |
| Mar 3, 2016 | Completed final sign-off Jun 2016 | 751 Page St | West Coast Premier Construction Inc | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4.Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. | $92,000 |
| Jan 21, 2016 | Completed final sign-off Apr 2016 | 335 22nd Av | West Coast Premier Construction Inc | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 | $85,000 |
| Jan 7, 2016 | Completed final sign-off Mar 2016 | 1201 08th Av | West Coast Premier Construction Inc | field revision to (e) approved pa#201511243430, new steel frame moved 5' to allow headroom. no exterior change. n/a ordinance #155-13Details
field revision to (e) approved pa#201511243430, new steel frame moved 5' to allow headroom. no exterior change. n/a ordinance #155-13 | |
| Jan 7, 2016 | Completed final sign-off May 2016 | 3125 Turk Bl | West Coast Premier Construction Inc | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 | $148,000 |
| Jul 31, 2015 | Completed final sign-off Jan 2016 | 579 Corbett Av | West Coast Premier Construction Inc | soft story seismic retrofit of multi unit apartment, bldg per sf soft story ordinace chapter 34b iebc 2012 a-4.install new steel moment frame & new shearwalls and seismic hardware. replace front facade around new frame at ground floor in kind.Details
soft story seismic retrofit of multi unit apartment, bldg per sf soft story ordinace chapter 34b iebc 2012 a-4.install new steel moment frame & new shearwalls and seismic hardware. replace front facade around new frame at ground floor in kind. | $90,000 |
| Jul 31, 2015 | Completed final sign-off Nov 2015 | 6600 Geary Bl | West Coast Premier Construction Inc | soft story seismic retrofit of multi unit apartment bldg per sf soft story ordinance chapter 34b iebc 2012, a-4.Details
soft story seismic retrofit of multi unit apartment bldg per sf soft story ordinance chapter 34b iebc 2012, a-4. | $108,000 |
| May 8, 2015 | Completed final sign-off Oct 2015 | 359 20th Av | West Coast Premier Construction Inc | soft story seismic retrofit of multi unit apts per sfbc chapter 34b, 2012 iebc appencix a-4.Details
soft story seismic retrofit of multi unit apts per sfbc chapter 34b, 2012 iebc appencix a-4. | $112,000 |
| May 8, 2015 | Completed final sign-off Jun 2015 | 699 Arguello Bl | West Coast Premier Construction Inc | revision to appl #201502057591: sheet s-4 details (change) 3, 9, 11.Details
revision to appl #201502057591: sheet s-4 details (change) 3, 9, 11. | |
| Mar 18, 2015 | Completed final sign-off Jun 2015 | 845 Lake St | West Coast Premier Construction Inc | soft story seismic retrofit per sfbc chapter 34b 2012 iebc appendix a-4.Details
soft story seismic retrofit per sfbc chapter 34b 2012 iebc appendix a-4. | $70,000 |
| Dec 17, 2014 | Completed final sign-off Apr 2015 | 447 34th Av | West Coast Premier Construction Inc | soft story seismic retrofit of multi unit apartment building per sf soft story ordinance, chapter 34b iebc 2012Details
soft story seismic retrofit of multi unit apartment building per sf soft story ordinance, chapter 34b iebc 2012 | $110,000 |
| Dec 17, 2014 | Completed final sign-off May 2015 | 1001 Hampshire St | West Coast Premier Construction Inc | soft story seismic retrofit of multi unit apartment building per san francisco soft story ordinance, chapter 34b 1ebc 2012Details
soft story seismic retrofit of multi unit apartment building per san francisco soft story ordinance, chapter 34b 1ebc 2012 | $90,000 |
| Oct 30, 2014 | Completed final sign-off Feb 2015 | 900 Rivera St | West Coast Premier Construction Inc | soft story seismic retrofit of multi unit apartment building per sf soft story ord chapter 34b iebc 2012Details
soft story seismic retrofit of multi unit apartment building per sf soft story ord chapter 34b iebc 2012 | $135,000 |
| Oct 30, 2014 | Completed final sign-off Apr 2015 | 1665 Chestnut St | West Coast Premier Construction Inc | soft story seismic retrofit of multi unit apartment building per san francisco soft story ordinance chapter 34b, iebc 2012; maher n/aDetails
soft story seismic retrofit of multi unit apartment building per san francisco soft story ordinance chapter 34b, iebc 2012; maher n/a | $125,000 |
| Sep 17, 2014 | Completed final sign-off Jan 2015 | 295 21st Av | West Coast Premier Construction Inc | soft story seismic retrofit of multi-unit apartment building per san francisco soft story ordinance sfbc chapter 34-b iebc 2012 appendix a-4Details
soft story seismic retrofit of multi-unit apartment building per san francisco soft story ordinance sfbc chapter 34-b iebc 2012 appendix a-4 | $120,000 |
| Jun 25, 2014 | Completed final sign-off Dec 2014 | 460 22nd Av | West Coast Premier Construction Inc | soft story retrofit per sfbc chapter 34b 2013 iebc appendix a-4. soft story seismic retrofit of apartment building per soft story ordinance #66-13 & ab-107.Details
soft story retrofit per sfbc chapter 34b 2013 iebc appendix a-4. soft story seismic retrofit of apartment building per soft story ordinance #66-13 & ab-107. | $70,000 |
| Oct 30, 2012 | Completed final sign-off Nov 2012 | 2728 Hyde St | West Coast Premier Construction Inc | revision to appl #2012.0808.6852 - to install high & low handicap push button & infrared motion sensor for garage door.Details
revision to appl #2012.0808.6852 - to install high & low handicap push button & infrared motion sensor for garage door. | $1,200 |
| Aug 8, 2012 | Completed final sign-off Nov 2012 | 2728 Hyde St | West Coast Premier Construction Inc | install a secondary convienient stairs between 1st & 2nd floors. this stair is not the main means of egress, as there are 2 other main stairs serving the building. no exterior workDetails
install a secondary convienient stairs between 1st & 2nd floors. this stair is not the main means of egress, as there are 2 other main stairs serving the building. no exterior work | $25,000 |
| Jun 4, 2012 | Completed final sign-off Sep 2012 | 1649 Polk St | West Coast Premier Construction Inc | t.i.: install new entry door.single commercial unit converted back to 2 seperate units as in 1980's. install partial new stud wall. install new auto door opener at new entry. and provide new door to common bathrm in 1649 polk st.Details
t.i.: install new entry door.single commercial unit converted back to 2 seperate units as in 1980's. install partial new stud wall. install new auto door opener at new entry. and provide new door to common bathrm in 1649 polk st. | $25,000 |
| Jun 9, 2010 | Completed final sign-off Dec 2010 | 788 Ofarrell St | West Coast Premier Construction Inc | revision to pa# 2010.05.18.2700. minor 2nd floor revision of (e) configuration. clarification of wall location.Details
revision to pa# 2010.05.18.2700. minor 2nd floor revision of (e) configuration. clarification of wall location. | |
| May 18, 2010 | Completed final sign-off Dec 2010 | 788 Ofarrell St | West Coast Premier Construction Inc | tenant improvement to repalce 12 e handsinks, 3 e bath tubs, 4 e toilets with 11 new hands sinks, shower and toilet. separate plumbing and electrical permit to be obtained. no exterior workDetails
tenant improvement to repalce 12 e handsinks, 3 e bath tubs, 4 e toilets with 11 new hands sinks, shower and toilet. separate plumbing and electrical permit to be obtained. no exterior work | $82,000 |
| May 28, 2009 | Completed final sign-off Feb 2010 | 2830 20th St | West Coast Premier Construction Inc | mandatory seismic rehabilitation of unreinforced brick masonry (umb) bldg per s.f. umb ordinance. "general procedure". no exterior work except for handicap accessible ramp to enter the bldg.Details
mandatory seismic rehabilitation of unreinforced brick masonry (umb) bldg per s.f. umb ordinance. "general procedure". no exterior work except for handicap accessible ramp to enter the bldg. | $113,800 |
| Apr 3, 2009 | Completed final sign-off May 2009 | 1700 Franklin St | West Coast Premier Construction Inc | revision to pa #200807187039 & 200505061762, path of travel door, restroom door swing changed, interior entry door threshold height at ground, only accessibility issues. remove ramp at entry door.Details
revision to pa #200807187039 & 200505061762, path of travel door, restroom door swing changed, interior entry door threshold height at ground, only accessibility issues. remove ramp at entry door. | |
| Mar 25, 2009 | Completed final sign-off Apr 2010 | 901 Balboa St | West Coast Premier Construction Inc | interior: remodel hallways, bedrooms, kitchens, bathroom including new drywall and paint. also voluntary seismic strengthening with new plywood panels over existing roof and stud wall framing. exterior: restoration of exterior stucco and corbel on north and west walls, new windows in kind which hadDetails
interior: remodel hallways, bedrooms, kitchens, bathroom including new drywall and paint. also voluntary seismic strengthening with new plywood panels over existing roof and stud wall framing. exterior: restoration of exterior stucco and corbel on north and west walls, new windows in kind which had | $230,000 |
| Jul 18, 2008 | Completed final sign-off May 2009 | 1700 Franklin St | West Coast Premier Construction Inc | revision to pa #200505061762 location of steel frame shifted by 2 feet. accessible ramp reconfigured. switch toilet/sink location of a.d.a restroom. all revision indicated by delta 2.Details
revision to pa #200505061762 location of steel frame shifted by 2 feet. accessible ramp reconfigured. switch toilet/sink location of a.d.a restroom. all revision indicated by delta 2. | |
| Jul 18, 2008 | Completed final sign-off Dec 2008 | 1000 Sansome St | this bldg was retrofitted per s.f. bldg ordinance and finalled 12/2/05. a number of cross walls have been re-designated as part of bolts plus procedure /no construction required/the new cross walls have been shown on new floor plans. original permit app #9810626Details
this bldg was retrofitted per s.f. bldg ordinance and finalled 12/2/05. a number of cross walls have been re-designated as part of bolts plus procedure /no construction required/the new cross walls have been shown on new floor plans. original permit app #9810626 | $5,000 | |
| Aug 2, 2007 | Completed final sign-off Oct 2007 | 2728 Hyde St | West Coast Premier Construction Inc | install a secondary convenience stair between ground and 2/f. this stair is not the main means of egress, as there are 2 other main stairs serving the bldg. no exterior work.Details
install a secondary convenience stair between ground and 2/f. this stair is not the main means of egress, as there are 2 other main stairs serving the bldg. no exterior work. | $30,000 |
| Jul 25, 2007 | Expired or cancelled expired Apr 2009 | 1160 Grant Av | open 1" thick stucco to get to brick wall behind @ north wall. four 1' x 1' panels, on 1st floor. this is required by planner dan dibartolo to observe the condition of brick behind stucco.Details
open 1" thick stucco to get to brick wall behind @ north wall. four 1' x 1' panels, on 1st floor. this is required by planner dan dibartolo to observe the condition of brick behind stucco. | $500 | |
| Jun 20, 2007 | Completed final sign-off Feb 2010 | 225 Ellis St | seismic rehab for unreinforced brick masonry (umb) building. 'special procedure". install new handicap push button auto door opener, partial handicap upgrade in existing restroom. no mep. work under this permit.Details
seismic rehab for unreinforced brick masonry (umb) building. 'special procedure". install new handicap push button auto door opener, partial handicap upgrade in existing restroom. no mep. work under this permit. | $120,000 | |
| Oct 25, 2006 | Expired or cancelled expired Apr 2008 | 417 Hyde St | West Coast Premier Construction Inc | bathroom & kitchen remodel in each of 7 units. seperate electric & plumbing permit will be filled. no window replacement or new. no major structural work.Details
bathroom & kitchen remodel in each of 7 units. seperate electric & plumbing permit will be filled. no window replacement or new. no major structural work. | $54,000 |
| Jul 11, 2005 | Expired or cancelled expired Jul 2007 | 1820 Eddy St | West Coast Premier Construction Inc | filed revision to (e) permit app#200307280541 only . first (main) level framing revision. (no changeDetails
filed revision to (e) permit app#200307280541 only . first (main) level framing revision. (no change | |
| May 6, 2005 | Completed final sign-off Jun 2009 | 1700 Franklin St | seismic retrofit unreinforced masonry brick building per s.f. building ordinance for umb spec procdDetails
seismic retrofit unreinforced masonry brick building per s.f. building ordinance for umb spec procd | $1,700,000 | |
| Mar 25, 2005 | Expired or cancelled cancelled Jun 2007 | 83 Minna St | demolish 1 story storage .Details
demolish 1 story storage . | ||
| Mar 25, 2005 | Completed final sign-off Apr 2006 | 384 Ellis St | demolish 1 story buddhist temple/art vacant gallery.Details
demolish 1 story buddhist temple/art vacant gallery. |