Hildegard A. Richardson
- Listed as
- architect, authorized agent-others
- Firm
- Richardson/Architects
- Based in
- Mill Valley
- On San Francisco permits
- Apr 2000 to Jun 2026
21 permits since 2000 (architect on 20 permits, authorized agent-others on 1 permit): 13 completed, 1 in progress, 3 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 23, 2026 | In progress issued Jul 2026 | 2028 Jefferson St | replace 3 existing windows on the (back) north elevation. replace (1) door on the north (back) elevation. demolish (1) windows on the east (side) elevation.Details
replace 3 existing windows on the (back) north elevation. replace (1) door on the north (back) elevation. demolish (1) windows on the east (side) elevation. | $8,000 | |
| Jul 30, 2025 | Completed final sign-off May 2026 | 2028 Jefferson St | replace 4 existing 6x6 posts @ rear deck; replace some rotten deck boards; add metal decking under existing deck; remove one existing centerlined post per planDetails
replace 4 existing 6x6 posts @ rear deck; replace some rotten deck boards; add metal decking under existing deck; remove one existing centerlined post per plan | $6,000 | |
| Oct 25, 2024 | Completed final sign-off Jan 2025 | 98 Seward St | Handelin Inc Dba Original Construction C | install 2 new velax skylights into existing comp shingle roof. slope of roof is 5 and 12 pitch. see page 1 of drawings. more than 5 ft away from property line. shed roof is over kitchen and dining room on top of the main floor above basement.Details
install 2 new velax skylights into existing comp shingle roof. slope of roof is 5 and 12 pitch. see page 1 of drawings. more than 5 ft away from property line. shed roof is over kitchen and dining room on top of the main floor above basement. | $22,350 |
| Jan 8, 2021 | Completed final sign-off Jan 2022 | 145 22nd Av | Acevedo Heritage Builder | at ground fl: install (n) bi-fold door & (n) window in (e) openings at rear elevation. at 3rd fl: renovate (e) master bathroom. no change to wall locations.Details
at ground fl: install (n) bi-fold door & (n) window in (e) openings at rear elevation. at 3rd fl: renovate (e) master bathroom. no change to wall locations. | $17,850 |
| Jan 6, 2021 | Never finaled issued Feb 2021, no final | 36 Parnassus Av | Trush Construction Company Inc. | construction of (n) staircase to connect rooms down at 1st fl to 2nd fl through interior of unit.Details
construction of (n) staircase to connect rooms down at 1st fl to 2nd fl through interior of unit. | $7,500 |
| Oct 14, 2020 | Completed final sign-off May 2022 | 2218 Washington St | repair (e) roof deck, install (n) wood surface. replace (e) guardrail.Details
repair (e) roof deck, install (n) wood surface. replace (e) guardrail. | $17,250 | |
| Mar 9, 2017 | Completed final sign-off Nov 2017 | 3140 Clay St | Burke Construction | unit #9 - remodel of the kitchen, bath & one closet area. all lighting to be high efficacy, bathroom to be vented to the outside with a humidity sensor.Details
unit #9 - remodel of the kitchen, bath & one closet area. all lighting to be high efficacy, bathroom to be vented to the outside with a humidity sensor. | $80,000 |
| Nov 21, 2014 | Expired or cancelled withdrawn Mar 2018 | 3580 Pierce St | new 628 sf top floor master suite addition to top unit of (e) 2 unit bldg. this includes the addition of 240 sf front deck, 156 sfof interior space + and additional 232 sf to the (e) rear deck, as well as interior renovation. maher ordinance n/aDetails
new 628 sf top floor master suite addition to top unit of (e) 2 unit bldg. this includes the addition of 240 sf front deck, 156 sfof interior space + and additional 232 sf to the (e) rear deck, as well as interior renovation. maher ordinance n/a | $200,000 | |
| Nov 27, 2013 | Completed final sign-off Jun 2014 | 866 31st Av | revision to 2013.0904.5859. new locatio of toilet, sink, laundryDetails
revision to 2013.0904.5859. new locatio of toilet, sink, laundry | ||
| Oct 22, 2013 | Completed final sign-off Jun 2014 | 866 31st Av | additional work to (e) pa# 201309045869: new bathroom (toilet/sink) in garage, new window.Details
additional work to (e) pa# 201309045869: new bathroom (toilet/sink) in garage, new window. | $10,000 | |
| Sep 4, 2013 | Expired or cancelled cancelled Nov 2022 | 250 Roosevelt Wy | new 735 sq ft top floor master suite addition to top unit of (e) 3 unit bldg. existing two stories proposed three stories.Details
new 735 sq ft top floor master suite addition to top unit of (e) 3 unit bldg. existing two stories proposed three stories. | $100,000 | |
| Sep 4, 2013 | Completed final sign-off Jun 2014 | 866 31st Av | rebuild (e) wall, replace interior door, raise floor level 3" of (e) laundry/storage space. no habitable space added, no exterior workDetails
rebuild (e) wall, replace interior door, raise floor level 3" of (e) laundry/storage space. no habitable space added, no exterior work | $1,000 | |
| Feb 6, 2012 | Never finaled issued Feb 2012, no final | 90 25th Av | Trush Construction Company Inc. | remodel on all floors. 1st floor: add 95 sq ft conditioned space new rear door, new side windows. 2nd flr:relocate glazed door & wndw at rear.add wndw at powder room. 3rd floor: extended extg gurardrail to code, add new clear story window at master bath. 4th floor minor partition changes.Details
remodel on all floors. 1st floor: add 95 sq ft conditioned space new rear door, new side windows. 2nd flr:relocate glazed door & wndw at rear.add wndw at powder room. 3rd floor: extended extg gurardrail to code, add new clear story window at master bath. 4th floor minor partition changes. | $30,000 |
| Oct 20, 2011 | Completed final sign-off Jan 2013 | 90 25th Av | Trush Construction Company Inc. | new windows /doors on ground floor, reconfigure front entrance, 6" widening of garage door. expand (e) deck at 2nd fl, reconfigure stair from deck to back yard. 1 new door replaces window at rear (2nd flr) & 1 new window replaces door (2nd flr) . new window at powder, new window at master bath.Details
new windows /doors on ground floor, reconfigure front entrance, 6" widening of garage door. expand (e) deck at 2nd fl, reconfigure stair from deck to back yard. 1 new door replaces window at rear (2nd flr) & 1 new window replaces door (2nd flr) . new window at powder, new window at master bath. | $40,000 |
| Oct 4, 2011 | Completed final sign-off Jan 2013 | 90 25th Av | Trush Construction Company Inc. | interior renovation at ground fl. add shower to (e) 1/2 bath; 2nd fl: interior renovation incl.removal of wall and ad 1/2 bathrm; 3rd fl: minor change to bathrm/closet; 4th fl: eletrical workDetails
interior renovation at ground fl. add shower to (e) 1/2 bath; 2nd fl: interior renovation incl.removal of wall and ad 1/2 bathrm; 3rd fl: minor change to bathrm/closet; 4th fl: eletrical work | $80,000 |
| May 29, 2009 | Completed final sign-off Sep 2010 | 2760 Baker St | change of use: office/dwelling unit to dwelling units at ground floor including add kitchen, shower, enlarge (e) window.Details
change of use: office/dwelling unit to dwelling units at ground floor including add kitchen, shower, enlarge (e) window. | $21,000 | |
| Dec 16, 2008 | Expired or cancelled expired Jun 2026 | 360 Pine St | Roebuck Construction | change of use b/m to b/a-2. occupancy load verification for p-142 assembly permit. new kitchen & restaurant dinining vacant space. new storage for propose restaurant in (e) basement. establish new occupancy load. (all interior work).Details
change of use b/m to b/a-2. occupancy load verification for p-142 assembly permit. new kitchen & restaurant dinining vacant space. new storage for propose restaurant in (e) basement. establish new occupancy load. (all interior work). | $500,000 |
| Jun 19, 2007 | Never finaled issued Jun 2007, no final | 360 Pine St | Roebuck Construction | demo (e) interior finishes, front entry door off lobby area & elevator cabin. refinish with all new materials. alter one partition wall to be move. door replacement & replace w/new door. accessible entrance reconstruction, elevator cab upgrade (e) accessible bathroom upgrade.Details
demo (e) interior finishes, front entry door off lobby area & elevator cabin. refinish with all new materials. alter one partition wall to be move. door replacement & replace w/new door. accessible entrance reconstruction, elevator cab upgrade (e) accessible bathroom upgrade. | $75,000 |
| Oct 18, 2005 | Completed final sign-off Aug 2006 | 248 Richland Av | remove (e) stucco replace w/ wd.siding. front facade renovation, trellis addition, remove brick face at (e) chimney flue. replace w/mtl sleeve & cap to meet seismic req.Details
remove (e) stucco replace w/ wd.siding. front facade renovation, trellis addition, remove brick face at (e) chimney flue. replace w/mtl sleeve & cap to meet seismic req. | $10,000 | |
| Apr 13, 2005 | Completed final sign-off Aug 2006 | 1231 Willard St | repair existing exterior rear yard stair and extend existing decks at both levels.Details
repair existing exterior rear yard stair and extend existing decks at both levels. | $20,000 | |
| Apr 27, 2000 | Expired or cancelled expired Feb 2001 | 40 22nd Av | restore original occupancy-single family dwelliong, remove kitchens on 2nd & 3rd flr,Details
restore original occupancy-single family dwelliong, remove kitchens on 2nd & 3rd flr, | $14,500 |