Permit GraphShortlistSan Francisco building permits since 2000

Block 1302, lot 014

90 25th Ave

City’s use
Single Family Residential
Built
1912
Stories
3
Units
1
Rooms
4 bedrooms, 4 bathrooms
Building
3,518 sq ft
Lot
3,598 sq ft
Zoning
RH1D
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

8 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jul 30, 2025Completed
final sign-off Sep 2025
90 25th AvR P C Roofingre roofing: hot works
Details
Permit
202507301938
Status
complete
Filed
Jul 30, 2025
Permit issued
Jul 30, 2025
Final sign-off
Sep 9, 2025
Declared cost
$27,000
Address
90 25th Av

re roofing: hot works

Open the permit page

$27,000
Feb 28, 2020Completed
final sign-off Mar 2020
90 25th AvOkell's Fireplaceremoval existing terra cotta chimney tiles and replac with listed metal class a chimney system. repair not a reconstructio. all work interior. no roof work seen from street.
Details
Permit
202002285748
Status
complete
Filed
Feb 28, 2020
Permit issued
Feb 28, 2020
Final sign-off
Mar 12, 2020
Declared cost
$10,000
Address
90 25th Av

removal existing terra cotta chimney tiles and replac with listed metal class a chimney system. repair not a reconstructio. all work interior. no roof work seen from street.

Open the permit page

$10,000
Jan 21, 2020Completed
final sign-off Apr 2020
90 25th AvPederson Construction Increplace wood sashes in existing openings @ top floor dormer. 16 windows total. no change to size, material, operation. in kind. new wood sashes, keep coved corners.
Details
Permit
202001212350
Status
complete
Filed
Jan 21, 2020
Permit issued
Jan 21, 2020
Final sign-off
Apr 3, 2020
Declared cost
$30,000
Address
90 25th Av

replace wood sashes in existing openings @ top floor dormer. 16 windows total. no change to size, material, operation. in kind. new wood sashes, keep coved corners.

Open the permit page

$30,000
Oct 17, 2016Never finaled
issued Oct 2016, no final
90 25th Avstreet space
Details
Permit
M730648
Status
issued
Filed
Oct 17, 2016
Permit issued
Oct 17, 2016
Address
90 25th Av

street space

Open the permit page

Jun 18, 2012Completed
final sign-off Jan 2013
90 25th AvTrush Construction Company Inc.alteration of front entrance, remove front porch and garden walls. new garden walls. reuse existing door for front door. 1 new window, replace brick cladding with stucco. relocate gas meter, new exterior lighting
Details
Permit
201206182841
Status
complete
Filed
Jun 18, 2012
Permit issued
Jun 19, 2012
Final sign-off
Jan 18, 2013
Declared cost
$100,000
Address
90 25th Av

alteration of front entrance, remove front porch and garden walls. new garden walls. reuse existing door for front door. 1 new window, replace brick cladding with stucco. relocate gas meter, new exterior lighting

Open the permit page

$100,000
Feb 6, 2012Never finaled
issued Feb 2012, no final
90 25th AvTrush Construction Company Inc.remodel on all floors. 1st floor: add 95 sq ft conditioned space new rear door, new side windows. 2nd flr:relocate glazed door & wndw at rear.add wndw at powder room. 3rd floor: extended extg gurardrail to code, add new clear story window at master bath. 4th floor minor partition changes.
Details
Permit
201202063641
Status
issued
Filed
Feb 6, 2012
Permit issued
Feb 9, 2012
Declared cost
$30,000
Address
90 25th Av

remodel on all floors. 1st floor: add 95 sq ft conditioned space new rear door, new side windows. 2nd flr:relocate glazed door & wndw at rear.add wndw at powder room. 3rd floor: extended extg gurardrail to code, add new clear story window at master bath. 4th floor minor partition changes.

Open the permit page

$30,000
Oct 20, 2011Completed
final sign-off Jan 2013
90 25th AvTrush Construction Company Inc.new windows /doors on ground floor, reconfigure front entrance, 6" widening of garage door. expand (e) deck at 2nd fl, reconfigure stair from deck to back yard. 1 new door replaces window at rear (2nd flr) & 1 new window replaces door (2nd flr) . new window at powder, new window at master bath.
Details
Permit
201110207260
Status
complete
Filed
Oct 20, 2011
Permit issued
Aug 31, 2012
Final sign-off
Jan 18, 2013
Declared cost
$40,000
Address
90 25th Av

new windows /doors on ground floor, reconfigure front entrance, 6" widening of garage door. expand (e) deck at 2nd fl, reconfigure stair from deck to back yard. 1 new door replaces window at rear (2nd flr) & 1 new window replaces door (2nd flr) . new window at powder, new window at master bath.

Open the permit page

$40,000
Oct 4, 2011Completed
final sign-off Jan 2013
90 25th AvTrush Construction Company Inc.interior renovation at ground fl. add shower to (e) 1/2 bath; 2nd fl: interior renovation incl.removal of wall and ad 1/2 bathrm; 3rd fl: minor change to bathrm/closet; 4th fl: eletrical work
Details
Permit
201110046086
Status
complete
Filed
Oct 4, 2011
Permit issued
Oct 4, 2011
Final sign-off
Jan 18, 2013
Declared cost
$80,000
Address
90 25th Av

interior renovation at ground fl. add shower to (e) 1/2 bath; 2nd fl: interior renovation incl.removal of wall and ad 1/2 bathrm; 3rd fl: minor change to bathrm/closet; 4th fl: eletrical work

Open the permit page

$80,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Trush Construction Company Inc. (4), Okell's Fireplace, Pederson Construction Inc, R P C Roofing
Architects
Heidi Richardson (3)

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.