Bassel Samaha
- Listed as
- architect, authorized agent-others
- Firm
- Bassel Samaha Architecture
- Based in
- San Francisco
- On San Francisco permits
- Apr 2006 to Nov 2023
40 permits since 2000 (architect on 38 permits, authorized agent-others on 2 permits): 33 completed, 4 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 17, 2023 | Completed final sign-off Aug 2024 | 2244 19th St | Edenavow Construction & Design | revision to permit 202105110179-s1 to include framing change due to field coordination, change of finish at stairs and floor at level 3, and a new glass guardrail @ level 2 stair opening.Details
revision to permit 202105110179-s1 to include framing change due to field coordination, change of finish at stairs and floor at level 3, and a new glass guardrail @ level 2 stair opening. | |
| Dec 21, 2022 | Completed final sign-off Jun 2023 | 1524 36th Av | Qualisopus Construction | down to the studs remodel of an existing bathroom to include new fixtures, finishes, lighting and windows at second floorDetails
down to the studs remodel of an existing bathroom to include new fixtures, finishes, lighting and windows at second floor | $30,000 |
| Dec 14, 2022 | Completed final sign-off Aug 2023 | 40 De Soto St | Magnolia Development Inc. | down to the stair remodel of the (e) kitchen and family room. included in the remodel are new windows and doors @ the rear facing elevation (yard)Details
down to the stair remodel of the (e) kitchen and family room. included in the remodel are new windows and doors @ the rear facing elevation (yard) | $75,000 |
| Nov 16, 2022 | Completed final sign-off Oct 2023 | 1243 12th Av | Sage Construction Services | 2 front facade, repair (e) dry-rot @ the entry stairs & porch to match in-kind; 2nd fl - add gas fireplace & remodel (e) kitchen; 3rd f- add (n) bathroom & remodel (e) bathroom; 1st fl - add fire rated wall & door betweeen garage & storage roomDetails
2 front facade, repair (e) dry-rot @ the entry stairs & porch to match in-kind; 2nd fl - add gas fireplace & remodel (e) kitchen; 3rd f- add (n) bathroom & remodel (e) bathroom; 1st fl - add fire rated wall & door betweeen garage & storage room | $95,000 |
| Apr 1, 2022 | Completed final sign-off Jan 2024 | 142 28th Av | Columba Anthony Duffy | revision to pa# 202106253254. lower slab at storage to create wine room. reframe porch due to dryrot. structural revision to gridlines b and e.Details
revision to pa# 202106253254. lower slab at storage to create wine room. reframe porch due to dryrot. structural revision to gridlines b and e. | $20,000 |
| Mar 3, 2022 | Completed final sign-off Jun 2023 | 2182 48th Av | Tosick Remodels | removal of existing sub floor on level 1 and replace w/new concrete slab on grade and exterior sunken patio. floor plan reconfigured on level 1 and new code compliant stair, new bathroom and laundry room. new and replaced windows on the rear yard facade.Details
removal of existing sub floor on level 1 and replace w/new concrete slab on grade and exterior sunken patio. floor plan reconfigured on level 1 and new code compliant stair, new bathroom and laundry room. new and replaced windows on the rear yard facade. | $95,000 |
| Jan 4, 2022 | Completed final sign-off Feb 2022 | 183 Saint Germain Av | Quality Home Builders Construction Inc | addition of a new manually operated skylight and related structural work.Details
addition of a new manually operated skylight and related structural work. | $15,000 |
| Oct 8, 2021 | Completed final sign-off Dec 2023 | 2177 17th Av | Qualisopus Construction | the project involves the down to the studs remodel of (e) kitchen & bathroom on level 2. removal of walls and new finishes @ media room; replacement of (e) deck w/a new deck & stairs. new windows & sidingDetails
the project involves the down to the studs remodel of (e) kitchen & bathroom on level 2. removal of walls and new finishes @ media room; replacement of (e) deck w/a new deck & stairs. new windows & siding | $95,000 |
| Jun 25, 2021 | Completed final sign-off Jan 2024 | 142 28th Av | Columba Anthony Duffy | at basement, create habitable space including a media room, full bathroom, mechanical room, and a new stair from the 1/f. on level 1, remodel the kitchen, remove a full bathroom and create a half bath. new laundry room at level 2. new windows/doorsDetails
at basement, create habitable space including a media room, full bathroom, mechanical room, and a new stair from the 1/f. on level 1, remodel the kitchen, remove a full bathroom and create a half bath. new laundry room at level 2. new windows/doors | $250,000 |
| May 11, 2021 | Completed final sign-off Aug 2024 | 2244 19th St | Edenavow Construction & Design | horizontal & verticial addition single family house adding 3rd story. interior remodel & reocation of (e) kitchen & bathrooms. add 3rd bathroom, (n) stairway, (n) balconies & (n) stairs to the rear yardDetails
horizontal & verticial addition single family house adding 3rd story. interior remodel & reocation of (e) kitchen & bathrooms. add 3rd bathroom, (n) stairway, (n) balconies & (n) stairs to the rear yard | $390,000 |
| Mar 3, 2021 | Completed final sign-off Jul 2022 | 340 Urbano Dr | Edenavow Construction & Design | addition of insulation and gypsum wallboard to ceiling of (e) garage. replace (e) 2 furnaces. remodel (e) kitchen and (e) bathroom. relocate (e) bathroom. replace (e) aluminum windows at living room and kitchen with wood windows.Details
addition of insulation and gypsum wallboard to ceiling of (e) garage. replace (e) 2 furnaces. remodel (e) kitchen and (e) bathroom. relocate (e) bathroom. replace (e) aluminum windows at living room and kitchen with wood windows. | $95,000 |
| Oct 10, 2020 | Completed final sign-off Aug 2021 | 2428 14th Av | Sunset Builders Llc. | interior remodel of 2nd level: remodel existing kitchen and bathroom, addition of new bathroom, laundry room & reconstruction of existing stairway in-kind. remove bay window, alight wall, new windows, stucco patch & paint.Details
interior remodel of 2nd level: remodel existing kitchen and bathroom, addition of new bathroom, laundry room & reconstruction of existing stairway in-kind. remove bay window, alight wall, new windows, stucco patch & paint. | $95,000 |
| Mar 6, 2020 | Completed final sign-off Aug 2020 | 1705 Page St | Ideal Carpentry** See Contractor's Note* | relocation of 1 (e), non-structural, partition wall to return the floor plans of unit 1703 and 1705 #4 to be in conformance with the condominium map of 1999Details
relocation of 1 (e), non-structural, partition wall to return the floor plans of unit 1703 and 1705 #4 to be in conformance with the condominium map of 1999 | $1,500 |
| Mar 6, 2020 | Completed final sign-off Aug 2020 | 1703 Page St | Ideal Carpentry** See Contractor's Note* | relocation of 1 (e), non-structural, partition wall to return the floor plans of unit 1703 and 1705 #4 to be in conformance with the condominium map of 1999Details
relocation of 1 (e), non-structural, partition wall to return the floor plans of unit 1703 and 1705 #4 to be in conformance with the condominium map of 1999 | $1,500 |
| Jan 15, 2020 | Completed final sign-off Oct 2020 | 2639 17th Av | Edenavow Construction & Design | rev to pa201910285681: in garage - remove (e) post and wood beams and replace with (n) steel beam with post and footing.Details
rev to pa201910285681: in garage - remove (e) post and wood beams and replace with (n) steel beam with post and footing. | $6,000 |
| Nov 21, 2019 | Completed final sign-off Sep 2020 | 1253 Bush St | Dickinson Construction | remodel of e residential studio unit to include interior remodel of e kitchen and bath. scope includes new plumbinb fixtures, new appliances, new finishes and upgraded elec, add closet wall and door.Details
remodel of e residential studio unit to include interior remodel of e kitchen and bath. scope includes new plumbinb fixtures, new appliances, new finishes and upgraded elec, add closet wall and door. | $35,000 |
| Oct 28, 2019 | Completed final sign-off Oct 2020 | 2639 17th Av | Edenavow Construction & Design | level one:expansion of habitable area with some excavation to create a nw split level. the extg bathroom & bedroom to be remodeled, and second bedroom, media room, laundry, & mechanical created. on level 2: remodel kitchen & bathroom and add 2nd bathroom. new stairway & windows added.Details
level one:expansion of habitable area with some excavation to create a nw split level. the extg bathroom & bedroom to be remodeled, and second bedroom, media room, laundry, & mechanical created. on level 2: remodel kitchen & bathroom and add 2nd bathroom. new stairway & windows added. | $250,000 |
| Apr 5, 2019 | Expired or cancelled cancelled Nov 2022 | 178 Townsend St | removal & relocation of the (e) entry doors & sidelites which are aluminum & glass. (n) doors & sidelites are to be painted wood w/ clear glass & true divided lites. (n) doors will also include a power operator for increased accessibility.Details
removal & relocation of the (e) entry doors & sidelites which are aluminum & glass. (n) doors & sidelites are to be painted wood w/ clear glass & true divided lites. (n) doors will also include a power operator for increased accessibility. | $15,000 | |
| Jan 18, 2019 | Never finaled issued Jan 2019, no final | 659 Pine St | T Champagne | add 2 8'-0" long wall mounted flagpoles to the street facade of the existing buildingDetails
add 2 8'-0" long wall mounted flagpoles to the street facade of the existing building | $2,000 |
| Dec 19, 2018 | Completed final sign-off Sep 2020 | 720 Stockton St | Dickinson Construction | ti of an existing residential unit to include the remodel of 2 existing bathrooms & 1 powder room w/new plumbing fixtures in current locations. also new exhaust hood, gas fireplace, windows and exterior door in kind replacement. new finishes, cabinetry and lightingDetails
ti of an existing residential unit to include the remodel of 2 existing bathrooms & 1 powder room w/new plumbing fixtures in current locations. also new exhaust hood, gas fireplace, windows and exterior door in kind replacement. new finishes, cabinetry and lighting | $90,000 |
| Feb 8, 2018 | Completed final sign-off Apr 2021 | 85 Parker Av | Magnolia Development Inc. | horizontal addition @ rear yard addition & interiror remodel, remove and replace rear yard deck & staris, new windows & plaster siding. bathroom & powder rm remodeled & bath added, relocate laundryDetails
horizontal addition @ rear yard addition & interiror remodel, remove and replace rear yard deck & staris, new windows & plaster siding. bathroom & powder rm remodeled & bath added, relocate laundry | $275,000 |
| Feb 8, 2018 | Completed final sign-off May 2021 | 85 Parker Av | Magnolia Development Inc. | convert the existing 368 square foot freestanding garage at the rear yard to become habitable space & become a library with a half bath. accessory to the main house.Details
convert the existing 368 square foot freestanding garage at the rear yard to become habitable space & become a library with a half bath. accessory to the main house. | $100,000 |
| Jan 23, 2018 | Completed final sign-off Aug 2018 | 1028 Guerrero St | Dickinson Construction | ti of an existing residential studio unit #3 to include interior remodel of the existing kitchen and bathroom. the scope includes new and relocated plumbing fixtures, new appliances and finishes and upgrade electricalDetails
ti of an existing residential studio unit #3 to include interior remodel of the existing kitchen and bathroom. the scope includes new and relocated plumbing fixtures, new appliances and finishes and upgrade electrical | $35,000 |
| Oct 3, 2017 | Completed final sign-off Jul 2018 | 4234 22nd St | Brady Construction Inc | revision to pa 2016-0714-2300 revision to an existing building permit that s1/r1 expands the scope of the work to include the replacement of the existing foundation and adds new doors/window at the garage and a new slot drain drivewayDetails
revision to pa 2016-0714-2300 revision to an existing building permit that s1/r1 expands the scope of the work to include the replacement of the existing foundation and adds new doors/window at the garage and a new slot drain driveway | $15,000 |
| Sep 18, 2017 | Completed final sign-off Apr 2018 | 1275 Clay St | Dickinson Construction | #3 - interior remodel of (e) kitchen and bathroom, new & relocated plumbing fixtures, new appliances, new finishes & electrical.Details
#3 - interior remodel of (e) kitchen and bathroom, new & relocated plumbing fixtures, new appliances, new finishes & electrical. | $35,000 |
| Sep 8, 2017 | Completed final sign-off Oct 2017 | 2428 14th Av | to comply with complaint #201625842. remove existing sink at lower level family rmDetails
to comply with complaint #201625842. remove existing sink at lower level family rm | $500 | |
| Jun 29, 2017 | Completed final sign-off Oct 2017 | 85 Parker Av | Brady Construction Inc | the repair at level 1 due to water damage. the scope include the replacement of interior finishes, replacement in kind of an extg window, new elelctrical and plumbing(utility sink to replace extg)Details
the repair at level 1 due to water damage. the scope include the replacement of interior finishes, replacement in kind of an extg window, new elelctrical and plumbing(utility sink to replace extg) | $15,000 |
| Apr 26, 2017 | Completed final sign-off Nov 2017 | 344 Willard North St | Hawke Construction | the conversion of an extg storage room and bathroom to become a new garage. at the west street facade the project includes the addition of a new garage door, concrete planter, curbcut and modification to extg bay window.Details
the conversion of an extg storage room and bathroom to become a new garage. at the west street facade the project includes the addition of a new garage door, concrete planter, curbcut and modification to extg bay window. | $35,000 |
| Jul 14, 2016 | Completed final sign-off Jul 2018 | 4234 22nd St | Brady Construction Inc | horizontal & vertical rear yard addition & interior remodel adding non-habitable on level 1 & habitable on level 2 & 3 including 1 1/2 bath, 1 bedrm & deck & (n) entry steps.Details
horizontal & vertical rear yard addition & interior remodel adding non-habitable on level 1 & habitable on level 2 & 3 including 1 1/2 bath, 1 bedrm & deck & (n) entry steps. | $200,000 |
| Apr 7, 2015 | Completed final sign-off Feb 2016 | 2360 Vallejo St | Seamus R Cudden | kitchen remodel down to the studs with plumbing and electrical work. replace rear facing window with new wood framed double hung.Details
kitchen remodel down to the studs with plumbing and electrical work. replace rear facing window with new wood framed double hung. | $60,000 |
| Apr 11, 2014 | Completed final sign-off Nov 2016 | 27 Fresno St | project includes a horizontal & vertical addition at rear yard of a one family dwelling. the addition adds sq ft to the (e) 1st/2nd levels & a new 3rd level with a sun room & adjacent deck & new bedrm @ level 1. ** maher: compliance with ordinance no# 155-13 not required **Details
project includes a horizontal & vertical addition at rear yard of a one family dwelling. the addition adds sq ft to the (e) 1st/2nd levels & a new 3rd level with a sun room & adjacent deck & new bedrm @ level 1. ** maher: compliance with ordinance no# 155-13 not required ** | $250,000 | |
| Aug 23, 2013 | Completed final sign-off Sep 2013 | 2509 Bush St | Seamus R Cudden | revision to app#201305217459. new sheet a2.3. add note to clarify use in the attic per plan.Details
revision to app#201305217459. new sheet a2.3. add note to clarify use in the attic per plan. | |
| May 21, 2013 | Completed final sign-off Sep 2013 | 2509 Bush St | upgrade of existing attic space to include new stairway, new walls, lighting, stiffening of the structure to correct bounce, replacmeent of the existing furnace.Details
upgrade of existing attic space to include new stairway, new walls, lighting, stiffening of the structure to correct bounce, replacmeent of the existing furnace. | $45,000 | |
| Apr 18, 2011 | Completed final sign-off Aug 2011 | 2509 Bush St | Camello Inc. | coversion of extg 2 unit (r) occupancy to (e) ocupancy day-care(pre-school). remodel (e) bathrooms, partition walls, rated walls at basement, re-build the rear stair way partial and sprinkler the entire bldg.Details
coversion of extg 2 unit (r) occupancy to (e) ocupancy day-care(pre-school). remodel (e) bathrooms, partition walls, rated walls at basement, re-build the rear stair way partial and sprinkler the entire bldg. | $50,000 |
| Mar 11, 2009 | Never finaled issued Apr 2009, no final | 871 Treat Av | Kohlmyer | remodel of extg kitchen and bathroom. new exterior window and a door to replace extg at 2nd floor at rear of house.Details
remodel of extg kitchen and bathroom. new exterior window and a door to replace extg at 2nd floor at rear of house. | $50,000 |
| Dec 18, 2008 | Expired or cancelled expired Dec 2010 | 2288 Broadway | interior remodel of ex gr fl unit to include: removal of all non structural partition walls, new partition walls, new finishes, kitchen, bathroom, appliances, fixtures. new elec fixtures, replace windows in kind,new radiant floor heatDetails
interior remodel of ex gr fl unit to include: removal of all non structural partition walls, new partition walls, new finishes, kitchen, bathroom, appliances, fixtures. new elec fixtures, replace windows in kind,new radiant floor heat | $125,000 | |
| Jul 17, 2007 | Never finaled issued Jul 2007, no final | 65 Clifford Tr | Keen Construction Incorporated | remodel kitchen & bathroom, incluses new side yard facing exterior windows & doors.Details
remodel kitchen & bathroom, incluses new side yard facing exterior windows & doors. | $60,000 |
| Jul 17, 2007 | Never finaled issued Jul 2007, no final | 67 Clifford Tr | Keen Construction Incorporated | work on #67Details
work on #67 | $60,000 |
| May 15, 2007 | Expired or cancelled expired Jul 2009 | 3767 23rd St | remodel & addition to an existing home, horizontal addition at rear which includes a deck, remodel interior includes relocate kitchen & 2 baths, g/f remodeling includes a new family room, bath, wetbar & bedroom.Details
remodel & addition to an existing home, horizontal addition at rear which includes a deck, remodel interior includes relocate kitchen & 2 baths, g/f remodeling includes a new family room, bath, wetbar & bedroom. | $300,000 | |
| Apr 19, 2006 | Completed final sign-off Jul 2006 | 1306 04th Av | legalize existing rooms adjacent to garage (as part of condo conversionDetails
legalize existing rooms adjacent to garage (as part of condo conversion | $12,000 |