Dickinson Construction
- Based in
- San Bruno
- On San Francisco permits
- May 2009 to Mar 2025
- Last 24 months
- 1 permit filed
8 permits since 2000: 7 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 28, 2025 | Completed final sign-off Aug 2025 | 1740 Pacific Av | unit 305: bathroom and kitchen in kind remodel to include updated electrical and plumbing as well as new finishes, fixtures and appliances.Details
unit 305: bathroom and kitchen in kind remodel to include updated electrical and plumbing as well as new finishes, fixtures and appliances. | $45,000 |
| Dec 16, 2019 | Never finaled issued Dec 2019, no final | 1253 Bush St | street spaceDetails
street space | |
| Nov 21, 2019 | Completed final sign-off Sep 2020 | 1253 Bush St | remodel of e residential studio unit to include interior remodel of e kitchen and bath. scope includes new plumbinb fixtures, new appliances, new finishes and upgraded elec, add closet wall and door.Details
remodel of e residential studio unit to include interior remodel of e kitchen and bath. scope includes new plumbinb fixtures, new appliances, new finishes and upgraded elec, add closet wall and door. | $35,000 |
| Dec 19, 2018 | Completed final sign-off Sep 2020 | 720 Stockton St | ti of an existing residential unit to include the remodel of 2 existing bathrooms & 1 powder room w/new plumbing fixtures in current locations. also new exhaust hood, gas fireplace, windows and exterior door in kind replacement. new finishes, cabinetry and lightingDetails
ti of an existing residential unit to include the remodel of 2 existing bathrooms & 1 powder room w/new plumbing fixtures in current locations. also new exhaust hood, gas fireplace, windows and exterior door in kind replacement. new finishes, cabinetry and lighting | $90,000 |
| Jan 23, 2018 | Completed final sign-off Aug 2018 | 1028 Guerrero St | ti of an existing residential studio unit #3 to include interior remodel of the existing kitchen and bathroom. the scope includes new and relocated plumbing fixtures, new appliances and finishes and upgrade electricalDetails
ti of an existing residential studio unit #3 to include interior remodel of the existing kitchen and bathroom. the scope includes new and relocated plumbing fixtures, new appliances and finishes and upgrade electrical | $35,000 |
| Sep 18, 2017 | Completed final sign-off Apr 2018 | 1275 Clay St | #3 - interior remodel of (e) kitchen and bathroom, new & relocated plumbing fixtures, new appliances, new finishes & electrical.Details
#3 - interior remodel of (e) kitchen and bathroom, new & relocated plumbing fixtures, new appliances, new finishes & electrical. | $35,000 |
| Apr 19, 2011 | Completed final sign-off Sep 2011 | 192 23rd Av | upgrade existing bathroom with new fixtures and finishes. interior work only. all (n) lighting must comply with cec150(k)Details
upgrade existing bathroom with new fixtures and finishes. interior work only. all (n) lighting must comply with cec150(k) | $18,000 |
| May 21, 2009 | Completed final sign-off Jul 2009 | 194 23rd Av | replace kitchen cabinets and appliances & floor; remove closet in bathroom, replace sink and toilet tile floorDetails
replace kitchen cabinets and appliances & floor; remove closet in bathroom, replace sink and toilet tile floor | $9,000 |