Aaron Lee Gordon
- Listed as
- authorized agent-others, contractor, designer
- Firm
- 415 Remodeling Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2016 to Sep 2026
109 permits since 2000 (contractor on 109 permits, authorized agent-others on 2 permits, designer on 1 permit): 91 completed, 8 in progress, 9 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 109.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 8, 2026 | In progress issued Sep 2026 | 301 Main St | 415 Remodeling Inc | unit 32e: install new monkey bars at kids bedroom.Details
unit 32e: install new monkey bars at kids bedroom. | $20,000 |
| Aug 25, 2026 | In progress issued Sep 2026 | 2672 Filbert St | 415 Remodeling Inc | interior remodel of guest bath basement, remove tub & install shower. interior remodel of bathroom #2, 3, & 4. total (4) bathrooms. bath #4 removing non structural wall between water closet & shower stall. bath 2 & 3 remodel in kind.Details
interior remodel of guest bath basement, remove tub & install shower. interior remodel of bathroom #2, 3, & 4. total (4) bathrooms. bath #4 removing non structural wall between water closet & shower stall. bath 2 & 3 remodel in kind. | $125,000 |
| Jul 27, 2026 | In progress issued Jul 2026 | 2474 23rd Av | 415 Remodeling Inc | interior remodel of 1st floor, demo 1st floor bath & laundry, (n) 1st floor bath & laundry, (n) closet at (e) bedroom.Details
interior remodel of 1st floor, demo 1st floor bath & laundry, (n) 1st floor bath & laundry, (n) closet at (e) bedroom. | $100,000 |
| Jul 13, 2026 | In progress issued Jul 2026 | 481 Jersey St | 415 Remodeling Inc | add cabinets to butlers pantry; add partition wall to (e) closet/bathroom space. (n) electrical; plumbing, to (e) closet/bathroom space. (n) electrical; plumbing, and hvac work to be pulled on separate permits.Details
add cabinets to butlers pantry; add partition wall to (e) closet/bathroom space. (n) electrical; plumbing, to (e) closet/bathroom space. (n) electrical; plumbing, and hvac work to be pulled on separate permits. | $20,000 |
| May 27, 2026 | In progress issued May 2026 | 6 Sumner St | 415 Remodeling Inc, United Quality Construction Inc | in-kind repair at (e) deck framing due to dry rot, less than 50% of (e) deck framing to be replaced, remove & replace (e) slider doors (2) to replace dry rot framing, not visible from street.Details
in-kind repair at (e) deck framing due to dry rot, less than 50% of (e) deck framing to be replaced, remove & replace (e) slider doors (2) to replace dry rot framing, not visible from street. | $10,000 |
| May 12, 2026 | Completed final sign-off May 2026 | 643 Edna St | 415 Remodeling Inc | to obtain final inspection for work approved under pa#201210182343, 201803022726, all work is completeDetails
to obtain final inspection for work approved under pa#201210182343, 201803022726, all work is complete | |
| Apr 3, 2026 | Completed final sign-off Apr 2026 | 158 Beulah St | 415 Remodeling Inc | backstairs repair (less than 50%) of a 4-story residence located at the rear yard of the property. work includes removal & replacement of rotten wood located within the stairs - partial replacement of (3) wood posts, deck boards at area of work, damaged stringers and replace fasteners.Details
backstairs repair (less than 50%) of a 4-story residence located at the rear yard of the property. work includes removal & replacement of rotten wood located within the stairs - partial replacement of (3) wood posts, deck boards at area of work, damaged stringers and replace fasteners. | $20,000 |
| Mar 24, 2026 | Completed final sign-off May 2026 | 59 Newburg St | 415 Remodeling Inc | partial bathroom remodel, replace bathroom shower stall in kind. like for like. repair tiles around shower.Details
partial bathroom remodel, replace bathroom shower stall in kind. like for like. repair tiles around shower. | $5,000 |
| Mar 5, 2026 | Completed final sign-off Apr 2026 | 6 Sumner St | 415 Remodeling Inc | revison to pa# 202602045221: replace exterior siding along south wall. existing shingles to be replaced w/ hardie artisan. install (2) new fiberglass doors in (e) location. modify (e) rafter tails.Details
revison to pa# 202602045221: replace exterior siding along south wall. existing shingles to be replaced w/ hardie artisan. install (2) new fiberglass doors in (e) location. modify (e) rafter tails. | $30,000 |
| Feb 6, 2026 | Completed final sign-off Sep 2026 | 1415 Kansas St | 415 Remodeling Inc | replace (e) rear patio "in-kind" patio height lower than 30" aff. replace (e) east side siding, (e) window and (e) door. not visible from street. patio replacement to be less than 50%.Details
replace (e) rear patio "in-kind" patio height lower than 30" aff. replace (e) east side siding, (e) window and (e) door. not visible from street. patio replacement to be less than 50%. | $20,000 |
| Feb 4, 2026 | Completed final sign-off Apr 2026 | 6 Sumner St | 415 Remodeling Inc | replace 1 header in kind; replace (2) rafters in kind due to dry rot. all work to be performed at 6 sumner st at rear of property. in (e) kitchen add ply to floor 100 sq ft. header at rear wall of building.Details
replace 1 header in kind; replace (2) rafters in kind due to dry rot. all work to be performed at 6 sumner st at rear of property. in (e) kitchen add ply to floor 100 sq ft. header at rear wall of building. | $10,000 |
| Sep 23, 2025 | Completed final sign-off Dec 2025 | 168 San Carlos St | 415 Remodeling Inc | replace existing kitchen window at rear of building, not visible from street. add (n) headerDetails
replace existing kitchen window at rear of building, not visible from street. add (n) header | $5,000 |
| Aug 12, 2025 | Completed final sign-off Mar 2026 | 1376 Clayton St | 415 Remodeling Inc | kitchen remodel (n) window in (e) locatin; (n) french door in (e) location not visible from streetDetails
kitchen remodel (n) window in (e) locatin; (n) french door in (e) location not visible from street | $50,000 |
| Aug 12, 2025 | Completed final sign-off Dec 2025 | 168 San Carlos St | 415 Remodeling Inc | kitchen remodel in-kindDetails
kitchen remodel in-kind | $30,000 |
| May 8, 2025 | In progress filed May 2025, not yet issued | 3223 Santiago St | 415 Remodeling Inc | replace (e) roof terrace add railing to rear repair dry rot at stairsDetails
replace (e) roof terrace add railing to rear repair dry rot at stairs | $100,000 |
| Mar 18, 2025 | Completed final sign-off Mar 2025 | 375 Highland Av | 415 Remodeling Inc | to obtain final inspection for work approved under pa# 202305268732, 202306029178, 202310068223. all work is complete.Details
to obtain final inspection for work approved under pa# 202305268732, 202306029178, 202310068223. all work is complete. | |
| Jan 17, 2025 | Completed final sign-off Apr 2026 | 253 Frederick St | 415 Remodeling Inc | kitchen and bathroom remodel, w/c replace, remodel closet in dressing room. widen room opening between kitchen & dining rm. add room opening from dining room to living room, close extg living room entrance & add new 6' doorway opening into living room. close existing mud room entrance &Details
kitchen and bathroom remodel, w/c replace, remodel closet in dressing room. widen room opening between kitchen & dining rm. add room opening from dining room to living room, close extg living room entrance & add new 6' doorway opening into living room. close existing mud room entrance & | $75,000 |
| Oct 9, 2024 | Completed final sign-off Dec 2024 | 2062 Revere Av | 415 Remodeling Inc | replace 2 windows on front facade in kind within the same openingDetails
replace 2 windows on front facade in kind within the same opening | $10,000 |
| Aug 13, 2024 | Completed final sign-off Dec 2024 | 2363 46th Av | 415 Remodeling Inc | remodel upper level bathroom. remove the tub, reconfigure shower, add closet in (e) bath footprint. no work outside of upper level bathroom.Details
remodel upper level bathroom. remove the tub, reconfigure shower, add closet in (e) bath footprint. no work outside of upper level bathroom. | $15,000 |
| Jun 28, 2024 | Completed final sign-off Aug 2024 | 393 Roosevelt Wy | 415 Remodeling Inc | replace exterior siding on 3rd & 2nd level of 3 level house on the east rear facade, not visible from the street. siding to be hardie plank flat (1"x8"). total approx. 450 s.f.Details
replace exterior siding on 3rd & 2nd level of 3 level house on the east rear facade, not visible from the street. siding to be hardie plank flat (1"x8"). total approx. 450 s.f. | $6,000 |
| Apr 23, 2024 | Completed final sign-off Mar 2025 | 375 Highland Av | 415 Remodeling Inc | replace "in-kind" front facade exterior stairs due to dry rot. ref permit 202310068223. front stair replacement in kindDetails
replace "in-kind" front facade exterior stairs due to dry rot. ref permit 202310068223. front stair replacement in kind | $10,000 |
| Oct 17, 2023 | Completed final sign-off May 2024 | 105 El Verano Wy | 415 Remodeling Inc | repair nonstructural framing in kind repair deck railing in kind comply with notice of violation #202305467Details
repair nonstructural framing in kind repair deck railing in kind comply with notice of violation #202305467 | $20,000 |
| Oct 6, 2023 | Completed final sign-off Mar 2025 | 375 Highland Av | 415 Remodeling Inc | revision to 202107094083: replace (e) windows in-kind at east to west elevations. remove stucco over original wood siding at south elevation & replace wood siding in-kind. clarify lot line wall assambly on plans per inspectionDetails
revision to 202107094083: replace (e) windows in-kind at east to west elevations. remove stucco over original wood siding at south elevation & replace wood siding in-kind. clarify lot line wall assambly on plans per inspection | $14,000 |
| Aug 2, 2023 | Completed final sign-off Apr 2024 | 1673 07th Av | 415 Remodeling Inc | kitchen remodel in kind. replace (3) windows in kind at side lightwell. not visible from street. same size window, same location, and same type of window. no structural work. no floor layout change. no wall layout change.Details
kitchen remodel in kind. replace (3) windows in kind at side lightwell. not visible from street. same size window, same location, and same type of window. no structural work. no floor layout change. no wall layout change. | $30,000 |
| Jun 2, 2023 | Completed final sign-off Mar 2025 | 375 Highland Av | 415 Remodeling Inc | rev to pa202305268732: clarification per ispection to lot lline retaning wall and demo plan.Details
rev to pa202305268732: clarification per ispection to lot lline retaning wall and demo plan. | |
| May 26, 2023 | Completed final sign-off Mar 2025 | 375 Highland Av | 415 Remodeling Inc | revision to pa# 202107094083. inclusion of demo plan for record as per field inspector. revision to interior layouts for kitchen and bath at level 2 and bathroom at level 1. minor field clarifications to floor framing and simpson strong walls.Details
revision to pa# 202107094083. inclusion of demo plan for record as per field inspector. revision to interior layouts for kitchen and bath at level 2 and bathroom at level 1. minor field clarifications to floor framing and simpson strong walls. | |
| Feb 15, 2023 | Never finaled issued Mar 2023, no final | 173 Crestmont Dr | 415 Remodeling Inc | 1st fl: remodel bath 2, remodel office bonus room, add wet bar and add mud room 2nd fl: remodel bath 1 in kind remodel primary bath room reface fire place with gas fire place (n) elec throughout windows: replace (e) double hung window w/fixed privacy window in (e) loc replace 2 (e) 3-panelDetails
1st fl: remodel bath 2, remodel office bonus room, add wet bar and add mud room 2nd fl: remodel bath 1 in kind remodel primary bath room reface fire place with gas fire place (n) elec throughout windows: replace (e) double hung window w/fixed privacy window in (e) loc replace 2 (e) 3-panel | $100,000 |
| Dec 19, 2022 | In progress issued Feb 2025 | 228 Jersey St | 415 Remodeling Inc, Aaron Gordon Construction Inc | renovation of an (e) 2-story single family home, including: (1) demo (e) rear yard porch, (2) new single story addition at rear, (3) new interior wall layout, (4) replacing existing foundation w/ associated excavation work, (5) repair/replace exterior finishes, (6) replacing exterior windows & doorsDetails
renovation of an (e) 2-story single family home, including: (1) demo (e) rear yard porch, (2) new single story addition at rear, (3) new interior wall layout, (4) replacing existing foundation w/ associated excavation work, (5) repair/replace exterior finishes, (6) replacing exterior windows & doors | $400,000 |
| Sep 23, 2022 | Completed final sign-off Nov 2023 | 651 29th St | 415 Remodeling Inc | bathroom on 3rd level of residence; remove shower & replace with shower over tub, toilet and sinks to remain in (e) locationDetails
bathroom on 3rd level of residence; remove shower & replace with shower over tub, toilet and sinks to remain in (e) location | $22,000 |
| May 12, 2022 | Completed final sign-off May 2024 | 401 Harrison St | 415 Remodeling Inc | unit 4805 48th fl: remodel of kitchen, master bath, powder rm, bathroom #1, bathroom #2 (total 3 full baths, 1 powder rm). all appliances and plumbing to remain in (e) location. removal of non-structural dividing walls in master bedroom & closet. no work outside unit 4805.Details
unit 4805 48th fl: remodel of kitchen, master bath, powder rm, bathroom #1, bathroom #2 (total 3 full baths, 1 powder rm). all appliances and plumbing to remain in (e) location. removal of non-structural dividing walls in master bedroom & closet. no work outside unit 4805. | $65,000 |
| May 11, 2022 | In progress issued Nov 2023 | 145 Corbett Av | 415 Remodeling Inc | new upgrade deck structural and code compliant guardrails (not visible from street). minor structural reinforcement of existing south facade, as required. new exterior windows and doors. not visible from street.Details
new upgrade deck structural and code compliant guardrails (not visible from street). minor structural reinforcement of existing south facade, as required. new exterior windows and doors. not visible from street. | $100,000 |
| Apr 29, 2022 | Completed final sign-off Feb 2023 | 766 10th Av | 415 Remodeling Inc | replace (15) windows at rear of property. all windows to remain same size. not visible from the street. marvin ultimate wood. (does not address any nov complaints)Details
replace (15) windows at rear of property. all windows to remain same size. not visible from the street. marvin ultimate wood. (does not address any nov complaints) | $30,000 |
| Mar 18, 2022 | Completed final sign-off Feb 2023 | 218 Presidio Av | 415 Remodeling Inc | replacing (14) windows; (5) windows facing street. windows to be block frame replacements. "in-kind"Details
replacing (14) windows; (5) windows facing street. windows to be block frame replacements. "in-kind" | $14,000 |
| Mar 18, 2022 | Completed final sign-off Aug 2022 | 1714 Larkin St | 415 Remodeling Inc | 1 kitchen remodel "in-kind" all appliances to remain in (e) locationsDetails
1 kitchen remodel "in-kind" all appliances to remain in (e) locations | $25,000 |
| Feb 14, 2022 | Completed final sign-off Feb 2023 | 766 10th Av | 415 Remodeling Inc | new water closet on main level. remodel (e) bathroom and water closet into one new bathroom on upper level. new kitchen remodel on main level. to comply with complaints: pid-202287335, bid-202287322, eid-202287333.Details
new water closet on main level. remodel (e) bathroom and water closet into one new bathroom on upper level. new kitchen remodel on main level. to comply with complaints: pid-202287335, bid-202287322, eid-202287333. | $60,000 |
| Oct 19, 2021 | Completed final sign-off Mar 2023 | 766 10th Av | 415 Remodeling Inc | new deck at rear of property.Details
new deck at rear of property. | $10,000 |
| Sep 21, 2021 | Completed final sign-off Dec 2021 | 480 Valley St | 415 Remodeling Inc | dryrot repair of 50 sq.ft., repair deck less than 50%. all work on north face (rear of property) not visible from street.Details
dryrot repair of 50 sq.ft., repair deck less than 50%. all work on north face (rear of property) not visible from street. | $50,000 |
| Aug 3, 2021 | Completed final sign-off Nov 2021 | 3243 Washington St | 415 Remodeling Inc | install new radiant heat in floor in unit 3243 washington onlyDetails
install new radiant heat in floor in unit 3243 washington only | $50,000 |
| Jul 9, 2021 | Completed final sign-off Mar 2025 | 375 Highland Av | 415 Remodeling Inc | foundation: replace portion of e slab on grade at lower level.replace portion of e foundation walls w new. 2nd fl removed bath and kitchen,expand dining rm to enclose exterior stair,enclose lightwell not visible from public way. no windows from adjacent prop. replace portion of e roof.Details
foundation: replace portion of e slab on grade at lower level.replace portion of e foundation walls w new. 2nd fl removed bath and kitchen,expand dining rm to enclose exterior stair,enclose lightwell not visible from public way. no windows from adjacent prop. replace portion of e roof. | $310,000 |
| Apr 14, 2021 | Completed final sign-off Mar 2022 | 24 Dearborn St | 415 Remodeling Inc, North South Pacific Construction Inc | kitchen remodel. new appliances, cabinetry, lighting, electrical, plumbing. remove partial wall.Details
kitchen remodel. new appliances, cabinetry, lighting, electrical, plumbing. remove partial wall. | $30,000 |
| Aug 22, 2020 | Never finaled issued Sep 2020, no final | 1032 Treat Av | 415 Remodeling Inc | addition of kitchen, hot tub & fire pit on (e) roof deck. ref bpa#201504234492Details
addition of kitchen, hot tub & fire pit on (e) roof deck. ref bpa#201504234492 | $50,000 |
| Aug 14, 2020 | Completed final sign-off Feb 2021 | 941 Vallejo St | 415 Remodeling Inc | bathroom remodel in-kind. (n)shower in (e) shower over tub loc. (n) tile, (n) plumbing fixtures in (e) loc. (n) vanity in (e) loc, all work to be completed in unit #51 only on 3rd floor.Details
bathroom remodel in-kind. (n)shower in (e) shower over tub loc. (n) tile, (n) plumbing fixtures in (e) loc. (n) vanity in (e) loc, all work to be completed in unit #51 only on 3rd floor. | $13,000 |
| Jul 29, 2020 | Completed final sign-off Feb 2021 | 338 Spear St | 415 Remodeling Inc | unit 4c: bathroom remodel in-kind, new shower in (e) shower over tub location, new tile, plumbing fixtures, new vanity, all work to be completed in unit 4c only.Details
unit 4c: bathroom remodel in-kind, new shower in (e) shower over tub location, new tile, plumbing fixtures, new vanity, all work to be completed in unit 4c only. | $13,000 |
| Mar 11, 2020 | Completed final sign-off Feb 2021 | 1916 Pine St | 415 Remodeling Inc | unit #1; bathroom remodel add toilet, remove shower over tub into shower stall, remodel powder room "in kind" all work to be completed in unit #1 onlyDetails
unit #1; bathroom remodel add toilet, remove shower over tub into shower stall, remodel powder room "in kind" all work to be completed in unit #1 only | $20,000 |
| Feb 19, 2020 | Completed final sign-off Feb 2021 | 101 Huntington Dr | 415 Remodeling Inc | lower level remodel to increase conditioned space of residence. (n) conditioned space includes (n) bathroom and (n) nedroom, add 2 windows to (n) bedroom & (n) bathroom.Details
lower level remodel to increase conditioned space of residence. (n) conditioned space includes (n) bathroom and (n) nedroom, add 2 windows to (n) bedroom & (n) bathroom. | $75,000 |
| Feb 13, 2020 | Completed final sign-off Dec 2020 | 1488 Harrison St | 415 Remodeling Inc | unit #305 - bathroom remodel "in-kind".Details
unit #305 - bathroom remodel "in-kind". | $13,000 |
| Feb 12, 2020 | Expired or cancelled withdrawn Feb 2020 | 101 Huntington Dr | 415 Remodeling Inc | remodel of garage level to add approx 341 sqft of (n) conditioned space. (n) conditioned space to include (n) bathroom and (n) bedroom. add (n) window in (n) bathroom; add (n) windows in (n) bedroom, in (n) bedroom an (e) egress window to remain.Details
remodel of garage level to add approx 341 sqft of (n) conditioned space. (n) conditioned space to include (n) bathroom and (n) bedroom. add (n) window in (n) bathroom; add (n) windows in (n) bedroom, in (n) bedroom an (e) egress window to remain. | $100,000 |
| Nov 21, 2019 | Completed final sign-off Jul 2020 | 166 Putnam St | 415 Remodeling Inc | replace 2 windows on front facade, fleetwood. resurface (e) front facade stucco w/ (n) stucco approx 250 sq ft; 2 windows to be fixed w/ casement - aluminum.Details
replace 2 windows on front facade, fleetwood. resurface (e) front facade stucco w/ (n) stucco approx 250 sq ft; 2 windows to be fixed w/ casement - aluminum. | $15,000 |
| Oct 11, 2019 | Never finaled issued Sep 2021, no final | 3241 Washington St | 415 Remodeling Inc | retain 2nd means of egress which was removed under 201609299155. replace e door in kind at e opening in kitchen reconfigure wall on grid 4 at kitchenDetails
retain 2nd means of egress which was removed under 201609299155. replace e door in kind at e opening in kitchen reconfigure wall on grid 4 at kitchen | $10,000 |
| Oct 10, 2019 | Completed final sign-off Dec 2020 | 3241 Washington St | 415 Remodeling Inc | revision to pa #201906042359, 20190735051. additional scope - 3500 sq ft of hardy board siding & sheating dry rot repair as necessary alonh south wall not visible from st. material: 1/2" structural 1cdx; 10 penny common 6edge 12 field; hard siding.Details
revision to pa #201906042359, 20190735051. additional scope - 3500 sq ft of hardy board siding & sheating dry rot repair as necessary alonh south wall not visible from st. material: 1/2" structural 1cdx; 10 penny common 6edge 12 field; hard siding. | $17,000 |
| Aug 19, 2019 | Completed final sign-off Dec 2019 | 1862 15th Av | 415 Remodeling Inc | master bathroom remodel and master closet addition in master bedroom envelopeDetails
master bathroom remodel and master closet addition in master bedroom envelope | $21,000 |
| Aug 19, 2019 | Completed final sign-off Dec 2019 | 2304 Vallejo St | 415 Remodeling Inc | remodel master bathroom, remove shower over tub and replace with shower in same location, all work to be completed within master bathroom envelope.Details
remodel master bathroom, remove shower over tub and replace with shower in same location, all work to be completed within master bathroom envelope. | $13,000 |
| Jul 3, 2019 | Completed final sign-off Dec 2020 | 3241 Washington St | 415 Remodeling Inc | ref to pa# 201906042359. additio0n to scope as follows: increase scope - sheathing & siding replace (in kind); dry rot repair- 1800 sq ft total. area of work not visible from streetDetails
ref to pa# 201906042359. additio0n to scope as follows: increase scope - sheathing & siding replace (in kind); dry rot repair- 1800 sq ft total. area of work not visible from street | $40,000 |
| Jun 4, 2019 | Completed final sign-off Sep 2019 | 3788 Clay St | 415 Remodeling Inc | kitchen remodel w/ buthaup design system. refrigerator relocating to(e) location of prep sink. all other appliances remaining in current locations. 210 sq ft. all work to be done in kitchen. no structural changes to walls, no wall layout changes.Details
kitchen remodel w/ buthaup design system. refrigerator relocating to(e) location of prep sink. all other appliances remaining in current locations. 210 sq ft. all work to be done in kitchen. no structural changes to walls, no wall layout changes. | $21,000 |
| Jun 4, 2019 | Completed final sign-off Dec 2020 | 3241 Washington St | 415 Remodeling Inc | replace old and damaged siding, in-kind. approx sq ft of 250. work to be done on east side of building, not visible from street. scope may increase to other exterior walls if found to be necessary.Details
replace old and damaged siding, in-kind. approx sq ft of 250. work to be done on east side of building, not visible from street. scope may increase to other exterior walls if found to be necessary. | $10,000 |
| May 2, 2019 | Completed final sign-off Aug 2019 | 1095 Natoma St | 415 Remodeling Inc | unit 8. kitchen remodel, in-kind. new appliances remaining in same locations. new fixtures remaining in same locations. 88 sq ft.Details
unit 8. kitchen remodel, in-kind. new appliances remaining in same locations. new fixtures remaining in same locations. 88 sq ft. | $21,000 |
| Apr 15, 2019 | Completed final sign-off Sep 2019 | 130 Landers St | 415 Remodeling Inc | kitchen remodel. replace in kind - with new appliance locations. all work to be done in kitchen only on 1st fl of condo unit. unit #gDetails
kitchen remodel. replace in kind - with new appliance locations. all work to be done in kitchen only on 1st fl of condo unit. unit #g | $21,000 |
| Apr 2, 2019 | Completed final sign-off Oct 2019 | 401 Montecito Av | 415 Remodeling Inc | remodel bathroom on main floor = 64 sq ft. remove tub and replace with shower stall: add stacked washer and dryer.Details
remodel bathroom on main floor = 64 sq ft. remove tub and replace with shower stall: add stacked washer and dryer. | $13,000 |
| Mar 25, 2019 | Completed final sign-off May 2019 | 239 Brannan St | 415 Remodeling Inc | unit 14j: remodel bathroom in-kind. no strcutural work.Details
unit 14j: remodel bathroom in-kind. no strcutural work. | $13,000 |
| Feb 21, 2019 | Completed final sign-off May 2019 | 574 Waller St | 415 Remodeling Inc | remodel bathroom. remove tub and replace w/ shower stall. remodel water closet "in-kind."Details
remodel bathroom. remove tub and replace w/ shower stall. remodel water closet "in-kind." | $13,000 |
| Feb 21, 2019 | Completed final sign-off Apr 2019 | 566 Belvedere St | 415 Remodeling Inc | replace 3 floor joist at 3rd story flr. replace 2 studs in wall at 2nd story flr. residence is 2 stories over garageDetails
replace 3 floor joist at 3rd story flr. replace 2 studs in wall at 2nd story flr. residence is 2 stories over garage | $1,000 |
| Dec 20, 2018 | Completed final sign-off Apr 2019 | 1933 Jackson St | 415 Remodeling Inc | remodel bathroom in-kind, remodel water closet and add wall hung sink in water closetDetails
remodel bathroom in-kind, remodel water closet and add wall hung sink in water closet | $19,500 |
| Oct 11, 2018 | Completed final sign-off Mar 2019 | 127 Belvedere St | 415 Remodeling Inc | unit a. kitchen remodel, no structural walls alteredDetails
unit a. kitchen remodel, no structural walls altered | $21,000 |
| Aug 31, 2018 | Completed final sign-off Oct 2018 | 53 Clarendon Av | 415 Remodeling Inc | guest bathroom remodel remove tub w/ shower. all work to be done in guest bathroom only.Details
guest bathroom remodel remove tub w/ shower. all work to be done in guest bathroom only. | $13,000 |
| May 24, 2018 | Completed final sign-off Aug 2018 | 1673 07th Av | 415 Remodeling Inc | to obtain a final inspection for work approved under pa#20703232068. all work is complete.Details
to obtain a final inspection for work approved under pa#20703232068. all work is complete. | |
| May 18, 2018 | Completed final sign-off Jan 2019 | 643 Edna St | 415 Remodeling Inc | replacement of single window on south facade, 2nd floor. like for like. no other work. u factor 0.32Details
replacement of single window on south facade, 2nd floor. like for like. no other work. u factor 0.32 | $1,000 |
| May 9, 2018 | Completed final sign-off Aug 2020 | 1775 San Jose Av | 415 Remodeling Inc, Seth Bernstein | remodel garage level of (e) single family residence. add new master suite, new family room and new guest bath, add qty 2 rear sliding doors not visible from street.Details
remodel garage level of (e) single family residence. add new master suite, new family room and new guest bath, add qty 2 rear sliding doors not visible from street. | $36,000 |
| May 9, 2018 | Completed final sign-off Jul 2018 | 180 Howth St | 415 Remodeling Inc | replace 5 windows on front facade marvin integrity - clad exterior wood interior. in-kind comply with cbc150.2 (b) if window area is more than 75 sq ft u shall be .32 or lessDetails
replace 5 windows on front facade marvin integrity - clad exterior wood interior. in-kind comply with cbc150.2 (b) if window area is more than 75 sq ft u shall be .32 or less | $2,500 |
| May 2, 2018 | Completed final sign-off Oct 2018 | 169 Putnam St | 415 Remodeling Inc | in compliance with nov# 201860671, demo kitchen non-bearing walls (south and west) on second floor. installation of (n) posts and lvl beam in kitchen area.Details
in compliance with nov# 201860671, demo kitchen non-bearing walls (south and west) on second floor. installation of (n) posts and lvl beam in kitchen area. | $5,000 |
| May 2, 2018 | Completed final sign-off Aug 2018 | 53 Clarendon Av | 415 Remodeling Inc | bathroom remodel in-kind on 2nd fl.Details
bathroom remodel in-kind on 2nd fl. | $13,000 |
| May 1, 2018 | Completed final sign-off Aug 2018 | 817 Guerrero St | 415 Remodeling Inc | remodel guest bath on 2nd fl, remodel master bath on 3rd fl "in-kind", relocate washer and dryer to garage/1st floor and add laundry sinkDetails
remodel guest bath on 2nd fl, remodel master bath on 3rd fl "in-kind", relocate washer and dryer to garage/1st floor and add laundry sink | $26,000 |
| Mar 2, 2018 | Never finaled issued Mar 2018, no final | 643 Edna St | 415 Remodeling Inc | remodel of 1st flr to include kitchen and dining room and adding guest bathroom. remodel master bathroom on 2nd flr. reframe interior stair & garage foundation replacementDetails
remodel of 1st flr to include kitchen and dining room and adding guest bathroom. remodel master bathroom on 2nd flr. reframe interior stair & garage foundation replacement | $46,000 |
| Feb 26, 2018 | Completed final sign-off Feb 2019 | 1673 07th Av | 415 Remodeling Inc | to obtain final inspection for pa # 201610039396. all work is complete.Details
to obtain final inspection for pa # 201610039396. all work is complete. | |
| Feb 9, 2018 | Completed final sign-off Aug 2018 | 53 Clarendon Av | 415 Remodeling Inc | remodel of master bathroom to add steam shower. all work to be done in master bathroom only. all work on 2/fDetails
remodel of master bathroom to add steam shower. all work to be done in master bathroom only. all work on 2/f | $13,000 |
| Feb 5, 2018 | Completed final sign-off Apr 2018 | 401 Montecito Av | 415 Remodeling Inc | dry rot repairs to existing balcony. no changes to existing architectural features permitted under this permit application.less then 50%Details
dry rot repairs to existing balcony. no changes to existing architectural features permitted under this permit application.less then 50% | $5,000 |
| Feb 5, 2018 | Completed final sign-off May 2018 | 180 Dolores St | 415 Remodeling Inc | partial siding replacement 1st story at rear. 200 sq ft.Details
partial siding replacement 1st story at rear. 200 sq ft. | $1,000 |
| Jan 12, 2018 | Completed final sign-off Feb 2018 | 53 Clarendon Av | 415 Remodeling Inc | to obtain a final inspection for work approved under pa#201612215521. all work is complete.Details
to obtain a final inspection for work approved under pa#201612215521. all work is complete. | |
| Dec 19, 2017 | Completed final sign-off Jun 2018 | 169 Putnam St | 415 Remodeling Inc | replace two front facing, aluminum windows with powder coated aluminum casements in same openings. replace rock facade with stucco, repair wood siding, replace non-historic permastone with stucco. replace five non-visible rear windows and one door with aluminum.Details
replace two front facing, aluminum windows with powder coated aluminum casements in same openings. replace rock facade with stucco, repair wood siding, replace non-historic permastone with stucco. replace five non-visible rear windows and one door with aluminum. | $10,000 |
| Dec 18, 2017 | Completed final sign-off Feb 2018 | 412 Jersey St | 415 Remodeling Inc | repair rotted entry stairway in-kind.Details
repair rotted entry stairway in-kind. | $10,000 |
| Dec 7, 2017 | Completed final sign-off May 2018 | 317 Harriet St | 415 Remodeling Inc | remodel kitchen in-kind. maher naDetails
remodel kitchen in-kind. maher na | $21,000 |
| Oct 30, 2017 | Completed final sign-off Feb 2018 | 1421 South Van Ness Av | 415 Remodeling Inc | 2/f -add powder room in (e) closet.Details
2/f -add powder room in (e) closet. | $13,000 |
| Sep 29, 2017 | Completed final sign-off Feb 2018 | 37 Claremont Bl | 415 Remodeling Inc | windows replacement 3 on the south wall & stucco on north wall. work not facing street u factor .32 max.Details
windows replacement 3 on the south wall & stucco on north wall. work not facing street u factor .32 max. | $10,000 |
| May 8, 2017 | Completed final sign-off Feb 2018 | 320 Alabama St | 415 Remodeling Inc | remodel master bath in kind on 2nd flr. replace tub with shower. remodel kitchen on 2nd flrDetails
remodel master bath in kind on 2nd flr. replace tub with shower. remodel kitchen on 2nd flr | $35,000 |
| May 8, 2017 | Completed final sign-off Jun 2017 | 26 Bellair Pl | 415 Remodeling Inc | repair in kind existing roof deck, <50%Details
repair in kind existing roof deck, <50% | $8,500 |
| Apr 3, 2017 | Never finaled issued Apr 2017, no final | 850 Powell St | 415 Remodeling Inc | unit 801 - bathroom remodel "in-kind" kitchen lighting & electrical work. no structural work to be doneDetails
unit 801 - bathroom remodel "in-kind" kitchen lighting & electrical work. no structural work to be done | $15,000 |
| Mar 22, 2017 | Never finaled issued Mar 2017, no final | 1673 07th Av | 415 Remodeling Inc | add office and closet at 1/f, add bathroom at 1/f, add partition walls at 1/f. partial foundation replacement.Details
add office and closet at 1/f, add bathroom at 1/f, add partition walls at 1/f. partial foundation replacement. | $16,000 |
| Mar 14, 2017 | Completed final sign-off Apr 2017 | 439 Lisbon St | 415 Remodeling Inc | replace approximately 200 sq.ft. of siding, not visable from street, repair in kind.Details
replace approximately 200 sq.ft. of siding, not visable from street, repair in kind. | $7,000 |
| Feb 27, 2017 | Completed final sign-off Mar 2017 | 1121 Tennessee St | 415 Remodeling Inc | unit 3: replace approximately 100 sq feet of siding in kind at front facade due to water intrusion. ordinary maintenance and repairs sec 1005.3.Details
unit 3: replace approximately 100 sq feet of siding in kind at front facade due to water intrusion. ordinary maintenance and repairs sec 1005.3. | $4,200 |
| Feb 24, 2017 | Completed final sign-off May 2017 | 150 Juanita Wy | 415 Remodeling Inc | remodel ground floor level to add bedroom with egress window and closetDetails
remodel ground floor level to add bedroom with egress window and closet | $15,000 |
| Feb 8, 2017 | Completed final sign-off Apr 2017 | 2299 Sacramento St | 415 Remodeling Inc | #9- kitchen: level existing wall outlets, new hardwood floor in kind, new countertop.Details
#9- kitchen: level existing wall outlets, new hardwood floor in kind, new countertop. | $6,500 |
| Jan 13, 2017 | Completed final sign-off May 2017 | 1123 Lincoln Wy | 415 Remodeling Inc | kitchen remodel within existing kitchen locationDetails
kitchen remodel within existing kitchen location | $21,000 |
| Jan 4, 2017 | Completed final sign-off Apr 2017 | 2299 Sacramento St | 415 Remodeling Inc | replace in kind bathroom on level threee of 5 at apartment #9' n/a maherDetails
replace in kind bathroom on level threee of 5 at apartment #9' n/a maher | $13,000 |
| Dec 21, 2016 | Completed final sign-off Feb 2018 | 53 Clarendon Av | 415 Remodeling Inc | remodel kitchen on 3rd floor. no change to homes (e) envelopeDetails
remodel kitchen on 3rd floor. no change to homes (e) envelope | $21,000 |
| Oct 19, 2016 | Completed final sign-off Jun 2017 | 1443 Alabama St | 415 Remodeling Inc | remodel kitchen, remodel laundry room, add powder bathroom. all work in home's extg envelope.Details
remodel kitchen, remodel laundry room, add powder bathroom. all work in home's extg envelope. | $32,000 |
| Oct 4, 2016 | Completed final sign-off Jan 2017 | 226 Ritch St | 415 Remodeling Inc | revision to 201606089409, add applicable ada standards for bathroom upgrades per 11aDetails
revision to 201606089409, add applicable ada standards for bathroom upgrades per 11a | |
| Oct 4, 2016 | Completed final sign-off Nov 2016 | 103 Banks St | 415 Remodeling Inc | replace siding in rear of property, not visible from street in-kind of (e) 2-story building.Details
replace siding in rear of property, not visible from street in-kind of (e) 2-story building. | $2,000 |
| Oct 3, 2016 | Never finaled issued Oct 2016, no final | 1673 07th Av | 415 Remodeling Inc, Foxtail Hill Windows & Doors Inc | replace all windows at teh front of the house - wood exteriorDetails
replace all windows at teh front of the house - wood exterior | $10,000 |
| Sep 1, 2016 | Completed final sign-off Jan 2017 | 2299 Sacramento St | 415 Remodeling Inc | bathroom remodel in kind, remove & replace all interior fixtures & finishes. including electrical & plumbing, remove & replace window @ lightwell location of work in unit #12 level 3Details
bathroom remodel in kind, remove & replace all interior fixtures & finishes. including electrical & plumbing, remove & replace window @ lightwell location of work in unit #12 level 3 | $13,000 |
| Jul 18, 2016 | Completed final sign-off Sep 2016 | 4245 23rd St | 415 Remodeling Inc | remove (e) rear facade siding & replace rear facade siding, not visable from street.Details
remove (e) rear facade siding & replace rear facade siding, not visable from street. | $10,000 |
| Jun 15, 2016 | Never finaled issued Jun 2016, no final | 738 06th Av | 415 Remodeling Inc | dry rot and siding repair on exterior facade. work is for parcel (block/lot) 1648/058Details
dry rot and siding repair on exterior facade. work is for parcel (block/lot) 1648/058 | $16,000 |