Guillermo Cardenas
- Listed as
- authorized agent-others, contractor
- Firm
- Eps Remodel Inc
- Based in
- Sacramento
- On San Francisco permits
- Oct 2018 to Aug 2023
27 permits since 2000 (contractor on 27 permits, authorized agent-others on 1 permit): 20 completed, 5 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Architects
- Brett Terpeluk
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 28, 2023 | Never finaled issued Aug 2023, no final | 2240 15th St | Eps Remodel Inc | (2) full bathroom and (2) half bathroom remodels. replace dwv (drain, waste, and vent) and fixtures. framing dry rot repair drywall installation like for like. 2 studs and about 4x4 piece of plywood.Details
(2) full bathroom and (2) half bathroom remodels. replace dwv (drain, waste, and vent) and fixtures. framing dry rot repair drywall installation like for like. 2 studs and about 4x4 piece of plywood. | $25,000 |
| Aug 14, 2023 | Never finaled issued Aug 2023, no final | 2240 15th Av | Eps Remodel Inc | in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s). | $21,122 |
| Jun 1, 2023 | Completed final sign-off Jul 2023 | 404 Vallejo St | Eps Remodel Inc | one bathroom remodel- like for like: replace tile, tub shower, valve vanity, sink faucet. drywall taping painting. non structural.Details
one bathroom remodel- like for like: replace tile, tub shower, valve vanity, sink faucet. drywall taping painting. non structural. | $13,697 |
| Mar 6, 2023 | Never finaled issued Mar 2023, no final | 3732 Irving St | Eps Remodel Inc | replacement of 6 window to match extg patch areas where trim is removed. put new trim drywall where need it. install new trim patch and paint. no change to size of windows.Details
replacement of 6 window to match extg patch areas where trim is removed. put new trim drywall where need it. install new trim patch and paint. no change to size of windows. | $4,500 |
| Dec 2, 2022 | Completed final sign-off Jan 2023 | 1086 Golden Gate Av | Eps Remodel Inc | bldg #6: remove drain and dry rot 4ft x 4ft around replace dryrot where water damaged the roof membrane. paint all flashing and siding around the access door.Details
bldg #6: remove drain and dry rot 4ft x 4ft around replace dryrot where water damaged the roof membrane. paint all flashing and siding around the access door. | $8,400 |
| Dec 1, 2022 | Expired or cancelled cancelled Apr 2025 | 1250 Jones St | Eps Remodel Inc | replace flooring in the salon & powder room and replace light fixtures throughout. paint throughout and install carpet, install wainscot tile in the bathrooms and replace plumbing fixtures like sink and toilets.Details
replace flooring in the salon & powder room and replace light fixtures throughout. paint throughout and install carpet, install wainscot tile in the bathrooms and replace plumbing fixtures like sink and toilets. | $230,000 |
| Oct 20, 2022 | Completed final sign-off Oct 2022 | 1086 Golden Gate Av | Eps Remodel Inc | building #4: remove dryrot around roof drain. replace section where water damage the roof mambrane. paint all flashing and siding around access doors. all work approx 20sqftDetails
building #4: remove dryrot around roof drain. replace section where water damage the roof mambrane. paint all flashing and siding around access doors. all work approx 20sqft | $7,800 |
| Oct 20, 2022 | Completed final sign-off Oct 2022 | 1086 Golden Gate Av | Eps Remodel Inc | building #3: remove dryrot around roof drain. replace section where water damage the roof mambrane. paint all flashing and siding around access doors. approx 20sqftDetails
building #3: remove dryrot around roof drain. replace section where water damage the roof mambrane. paint all flashing and siding around access doors. approx 20sqft | $7,800 |
| Jun 22, 2022 | Never finaled issued Jun 2022, no final | 5250 Mission St | Eps Remodel Inc | 40% dryrot repair. drywall repair paint installation of new wall heater and installation of baseboards heater and replacement of sub electrical panel and install baseboard heaters. repair stair, remove rubbish and provide heat to each room.Details
40% dryrot repair. drywall repair paint installation of new wall heater and installation of baseboards heater and replacement of sub electrical panel and install baseboard heaters. repair stair, remove rubbish and provide heat to each room. | $25,785 |
| Feb 24, 2022 | Expired or cancelled withdrawn Nov 2024 | 19 Pasadena St | Eps Remodel Inc | to comply with nov #202179413 to remove retaining wall built at rear yard. no plans required per ces. m. hernandezDetails
to comply with nov #202179413 to remove retaining wall built at rear yard. no plans required per ces. m. hernandez | $1,000 |
| Jan 31, 2022 | Completed final sign-off Aug 2022 | 2286 15th St | Eps Remodel Inc | (all work in rear) painting back of building. replace 12 windows in back of building. dry rot reapir on back stairs (less than 50%), siding back deck (less than 50%). replace 3 doors in back of building. replace wood plank for wood back deck with no changes or alteration to layout and roof repairs.Details
(all work in rear) painting back of building. replace 12 windows in back of building. dry rot reapir on back stairs (less than 50%), siding back deck (less than 50%). replace 3 doors in back of building. replace wood plank for wood back deck with no changes or alteration to layout and roof repairs. | $70,000 |
| Jul 27, 2021 | Completed final sign-off Apr 2022 | 649 Fillmore St | Eps Remodel Inc | to comply with nov #202179344; kitchen and bathroom remodel no layout changes in kitchen only counter top will be replaced, in bathroom only floor tile and vanity will be replaced, paint intire appartmentDetails
to comply with nov #202179344; kitchen and bathroom remodel no layout changes in kitchen only counter top will be replaced, in bathroom only floor tile and vanity will be replaced, paint intire appartment | $20,000 |
| Jun 22, 2021 | Completed final sign-off Nov 2021 | 23 Hoff St | Eps Remodel Inc | bathroom and kitchen renovation. adding dishwasher & garbage disposal. changing location of sink,toilet, and shower within the bathroom.re-wire the whole unit flooring drywall & painting & plumbing- upper unit-no fixture added.Details
bathroom and kitchen renovation. adding dishwasher & garbage disposal. changing location of sink,toilet, and shower within the bathroom.re-wire the whole unit flooring drywall & painting & plumbing- upper unit-no fixture added. | $78,780 |
| May 28, 2021 | Completed final sign-off Jul 2021 | 54 Stanford Heights Av | Eps Remodel Inc | bathroom remodel, like for like, no layout changes.Details
bathroom remodel, like for like, no layout changes. | $7,000 |
| May 11, 2021 | Completed final sign-off May 2021 | 54 Stanford Heights Av | Eps Remodel Inc | exterior deck dryrot repair. repair in hand rails nd floor joist, less than 15% or as needed.Details
exterior deck dryrot repair. repair in hand rails nd floor joist, less than 15% or as needed. | $7,000 |
| Apr 8, 2021 | Completed final sign-off May 2021 | 54 Stanford Heights Av | Eps Remodel Inc | revision to pa# 202103307530. add plumbing, replace host bit outside of the house.Details
revision to pa# 202103307530. add plumbing, replace host bit outside of the house. | |
| Mar 30, 2021 | Completed final sign-off Oct 2023 | 436 21st Av | Eps Remodel Inc | kitchen & bathroom remodel. like for like, no change to lyout to wlls & opening. rewire throughout unit/drywall patches (local at rewired locations). new gas line for kitchen range.Details
kitchen & bathroom remodel. like for like, no change to lyout to wlls & opening. rewire throughout unit/drywall patches (local at rewired locations). new gas line for kitchen range. | $36,000 |
| Mar 30, 2021 | Completed final sign-off May 2021 | 54 Stanford Heights Av | Eps Remodel Inc | drywall patches at rewired locations. paint interior. rewire throughout the unit.Details
drywall patches at rewired locations. paint interior. rewire throughout the unit. | $14,000 |
| Dec 12, 2019 | Completed final sign-off Oct 2020 | 25 Beideman St | Eps Remodel Inc | upper unit only -new laundy on the kitchen area.Details
upper unit only -new laundy on the kitchen area. | $3,000 |
| Dec 11, 2019 | Completed final sign-off Oct 2020 | 25 Beideman St | Eps Remodel Inc | change existing windows (street facing) visible windows to be wood interior with aluminum exterior. vinyl at the rear.Details
change existing windows (street facing) visible windows to be wood interior with aluminum exterior. vinyl at the rear. | $7,000 |
| Nov 5, 2019 | Completed final sign-off Jan 2020 | 768 20th Av | Eps Remodel Inc | address correction of pa 201901220900 (766 20th av). correct address is 768 20th av.Details
address correction of pa 201901220900 (766 20th av). correct address is 768 20th av. | |
| Aug 26, 2019 | Completed final sign-off Oct 2020 | 25 Beideman St | Eps Remodel Inc | 1 kitchen & 1 bathroom remodel. cosmetic remodel (interior) new cabinets, countertops, flooring, shower walls, new mixed valve, new drywall finish in the existing drywall. install new electrical panel & new can lights, new electrical and plumbing fixtures, aint ext and int. add hvac unit.Details
1 kitchen & 1 bathroom remodel. cosmetic remodel (interior) new cabinets, countertops, flooring, shower walls, new mixed valve, new drywall finish in the existing drywall. install new electrical panel & new can lights, new electrical and plumbing fixtures, aint ext and int. add hvac unit. | $60,000 |
| May 28, 2019 | Completed final sign-off Jul 2020 | 1122 Wayland St | Eps Remodel Inc | one bathroom remodel: install new plumbing and electrical fixtures, new tiles, new facuets & vanity. all fixtures are located at same location. no new wall & no exist'g wall relocation. all new lighting shall comply with cec 150.0(k)5.Details
one bathroom remodel: install new plumbing and electrical fixtures, new tiles, new facuets & vanity. all fixtures are located at same location. no new wall & no exist'g wall relocation. all new lighting shall comply with cec 150.0(k)5. | $10,000 |
| May 7, 2019 | Completed final sign-off Sep 2019 | 563 Belvedere St | Eps Remodel Inc | remove water closet from bathroom and relocate it to (e) closet. relocate laundry from one closet to another.Details
remove water closet from bathroom and relocate it to (e) closet. relocate laundry from one closet to another. | $5,000 |
| Apr 17, 2019 | Never finaled issued Apr 2019, no final | 563 Belvedere St | Eps Remodel Inc | cosmetic remodel in bathroom. change countertops in kitchen. no change to existing layout. bathroom around 8' x 5'.Details
cosmetic remodel in bathroom. change countertops in kitchen. no change to existing layout. bathroom around 8' x 5'. | $16,000 |
| Jan 22, 2019 | Completed final sign-off Jan 2020 | 766 20th Av | Eps Remodel Inc | new electrical panel and rewire the entire unit. new kitchen caibnets and counters, paintinteior and new appliances, fix some drywall cracks (kitchen rmeodel is like for like).Details
new electrical panel and rewire the entire unit. new kitchen caibnets and counters, paintinteior and new appliances, fix some drywall cracks (kitchen rmeodel is like for like). | $38,000 |
| Oct 10, 2018 | Completed final sign-off Jan 2019 | 4431 23rd St | Eps Remodel Inc | demo existing countertops and cabinets, move 2 outlets drywall, texture, paint, paint and install new cabinets and countertops, backsplash. install new sink & new appliances. no wall demo.Details
demo existing countertops and cabinets, move 2 outlets drywall, texture, paint, paint and install new cabinets and countertops, backsplash. install new sink & new appliances. no wall demo. | $29,000 |