Gretchen Mokry
- License
- C29885
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect, authorized agent-others
- Firm
- Gretchen Mokry Architecture
- Based in
- San Francisco
- On San Francisco permits
- Dec 2004 to Feb 2021
4 permits since 2000 (architect on 3 permits, authorized agent-others on 1 permit): 4 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Lenzi Incorporated (2), F D C Construction Inc
- Architects
- Steve Rajniger
- Engineers
- Mathew Ian Bertics (2), Donald David
- Pmt consultant/expediters
- Jon Bradley
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 2
- Commercial 1
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 12, 2021 | Completed final sign-off Sep 2022 | 2157 Grove St | F D C Construction Inc | priority process 100% affordable housing: renovate kitchen, bathroom. replace deteriorated siding @ back elevation. replace/relocate electrical panels, new handrails @ stairs. interior paint & carpet. voluntary seismic upgrade.Details
priority process 100% affordable housing: renovate kitchen, bathroom. replace deteriorated siding @ back elevation. replace/relocate electrical panels, new handrails @ stairs. interior paint & carpet. voluntary seismic upgrade. | $600,000 |
| Nov 18, 2016 | Completed final sign-off Jul 2021 | 308 Andover St | Lenzi Incorporated | rev. pa#201506027795, revised foundation details to accommodate existing conditions.Details
rev. pa#201506027795, revised foundation details to accommodate existing conditions. | $100 |
| Jun 2, 2015 | Completed final sign-off Jul 2021 | 308 Andover St | Lenzi Incorporated | 2nd story partial roof removal & replace. 2nd story will repair, alignment & new windows in rear. extension of (e) deck to alignment, new rear door to deck for exiting.Details
2nd story partial roof removal & replace. 2nd story will repair, alignment & new windows in rear. extension of (e) deck to alignment, new rear door to deck for exiting. | $7,500 |
| Dec 10, 2004 | Completed final sign-off Mar 2007 | 310 Townsend St | interior nons tructural demo including removal of hvac system non structural partition walls floorDetails
interior nons tructural demo including removal of hvac system non structural partition walls floor | $110,000 |