Gregory Snyder
- Listed as
- contractor, designer
- Firm
- Snyder Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2001 to Jan 2026
18 permits since 2000 (contractor on 18 permits, designer on 1 permit): 17 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 13, 2026 | Completed final sign-off Aug 2026 | 15 Rossmoor Dr | Snyder Construction | bathroom remodel. relocate toilet.Details
bathroom remodel. relocate toilet. | $20,000 |
| Jan 5, 2023 | Completed final sign-off Jun 2023 | 262 15th Av | Snyder Construction | interior bathroom remodel. no plans.Details
interior bathroom remodel. no plans. | $30,000 |
| Sep 23, 2022 | Completed final sign-off Apr 2023 | 2614 47th Av | Snyder Construction | remove (e) alum siding at front of house, replace with new wood sidng. approx 500sqftDetails
remove (e) alum siding at front of house, replace with new wood sidng. approx 500sqft | $10,000 |
| Jun 22, 2022 | Completed final sign-off Nov 2023 | 2618 47th Av | Snyder Construction | remove (e) vinyl siding, replace with new stucco. replace (e) aluminium clad windows (2x) and install new aluminium clad windows.Details
remove (e) vinyl siding, replace with new stucco. replace (e) aluminium clad windows (2x) and install new aluminium clad windows. | $35,000 |
| Feb 5, 2020 | Completed final sign-off Oct 2020 | 262 15th Av | Snyder Construction | bathroom remodel. new finishes, new fixtures in existing locations. no structural work. approx 5'x12'Details
bathroom remodel. new finishes, new fixtures in existing locations. no structural work. approx 5'x12' | $20,000 |
| Jan 28, 2020 | Completed final sign-off Aug 2021 | 850 35th Av | Snyder Construction | 1 bathroom remodel. fixtures to remain in place. no alteration to walls/window/doors.Details
1 bathroom remodel. fixtures to remain in place. no alteration to walls/window/doors. | $15,000 |
| Oct 30, 2018 | Completed final sign-off Jul 2020 | 850 35th Av | Snyder Construction | rebuild front porch, replace and recess garage door. replace stucco front facade and wood trimDetails
rebuild front porch, replace and recess garage door. replace stucco front facade and wood trim | $100,000 |
| May 1, 2018 | Completed final sign-off Oct 2018 | 262 15th Av | Snyder Construction | replacement of kitchen cabinet & countertops, floor patching, in same location no moving of doors or walls,Details
replacement of kitchen cabinet & countertops, floor patching, in same location no moving of doors or walls, | $25,000 |
| Aug 10, 2016 | Completed final sign-off Aug 2016 | 1422 46th Av | Snyder Construction | permeation grounting beneat (e) foundation, approx. 17 linear feet. ref pa 2014-1119-1920(s-1) (1426 45th av)Details
permeation grounting beneat (e) foundation, approx. 17 linear feet. ref pa 2014-1119-1920(s-1) (1426 45th av) | $4,500 |
| Aug 10, 2016 | Completed final sign-off Aug 2016 | 1430 46th Av | Snyder Construction | permeation grounting beneath (e) foundation, approx. 23 linear feet. ref pa 2014-1119-1920(s-1) (1426 45th av)Details
permeation grounting beneath (e) foundation, approx. 23 linear feet. ref pa 2014-1119-1920(s-1) (1426 45th av) | $4,500 |
| May 18, 2016 | Completed final sign-off Oct 2016 | 262 15th Av | Snyder Construction | revision to pa# 201512144918. revision to concrete foundation, new posts at (e) beam.Details
revision to pa# 201512144918. revision to concrete foundation, new posts at (e) beam. | |
| May 9, 2016 | Completed final sign-off Oct 2016 | 266 15th Av | Snyder Construction | permeation grouting beneath (e) foundation. approximately 27 linear feet on rear north foundation side.Details
permeation grouting beneath (e) foundation. approximately 27 linear feet on rear north foundation side. | $4,500 |
| Apr 26, 2016 | Expired or cancelled cancelled Jun 2016 | 262 15th Av | Snyder Construction | permeation grouting beneath (e) property line foundations.Details
permeation grouting beneath (e) property line foundations. | $4,500 |
| Dec 14, 2015 | Completed final sign-off Oct 2016 | 262 15th Av | Snyder Construction | renovate existing 1st fl habitable space including existing playroom, bath, bedroom, inteior stair, new bar area. new exterior door and window at 1st fl rear facade. new recessed exterior patio and steps to grade at rear yard. no wet bar.Details
renovate existing 1st fl habitable space including existing playroom, bath, bedroom, inteior stair, new bar area. new exterior door and window at 1st fl rear facade. new recessed exterior patio and steps to grade at rear yard. no wet bar. | $50,000 |
| Dec 22, 2014 | Completed final sign-off Dec 2015 | 2757 Green St | Snyder Construction | exterior stair and landing renovation; new stair structure and new stair treads and risers. new landing finish material, structure to remain. new treads and risers and landing finish material to be precast concrete tiles in lieu of painted wood.Details
exterior stair and landing renovation; new stair structure and new stair treads and risers. new landing finish material, structure to remain. new treads and risers and landing finish material to be precast concrete tiles in lieu of painted wood. | $8,000 |
| Nov 19, 2014 | Completed final sign-off Dec 2017 | 1426 46th Av | Snyder Construction | 725 sq ft 2-story rear yard addition. remodel kitchen & bathroom on upper level, (2)(n) bedrooms & (1) bathroom on lower level. (n) interior staircase.Details
725 sq ft 2-story rear yard addition. remodel kitchen & bathroom on upper level, (2)(n) bedrooms & (1) bathroom on lower level. (n) interior staircase. | $145,000 |
| Aug 23, 2002 | Completed final sign-off Sep 2002 | 242 Edna St | Snyder Construction | rev to 200106181809;re-oriented stair, & lower to grnd,delete trellisDetails
rev to 200106181809;re-oriented stair, & lower to grnd,delete trellis | |
| Jun 18, 2001 | Completed final sign-off Sep 2002 | 242 Edna St | Snyder Construction | replace (e) sunroom, remodel kitchen & bath, add bedroom, bath, office downstairsDetails
replace (e) sunroom, remodel kitchen & bath, add bedroom, bath, office downstairs | $50,000 |